Annual Examination Meeting Audit Authority 13 September 2011.

Slides:



Advertisements
Similar presentations
EN Regional Policy - Finance & Budget EUROPEAN COMMISSION Annual Meeting with managing authorities of crossborder programmes Brussels - 25 Octobre 2011.
Advertisements

CLEARANCE OF ACCOUNTS IN RURAL DEVELOPMENT PROGRAMMES RICHARD CROFT.
EN DG Regional Policy EUROPEAN COMMISSION Brussels, 11 October 2007 Management and control arrangements OPEN DAYS 2007 Financial Control : New.
EUROPEAN COMMISSION Social and economic cohesion OPEN DAYS 2006 The European Week of Regions and Cities Brussels, 9 – 12 October 2006 _________________________.
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
THE CERTIFYING AUTHORITY
The Managing Authority –Keystone of the Control System
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
Regional Policy Delegated Acts. Regional Policy 2 Delegated ActsImplementing Acts 32(10): Purchase of land and combination of TA with FI 33(3)(a):FI complying.
POLAND Development Management System in Poland Brussels, 2 July 2010.
“Train the trainers” seminar
A d d V Alue to public management Winding-up declaration Portuguese experience Carlos Trigacheiro Inspecção-Geral de Finanças (IGF) General Inspection.
1 Managing Authority Conducting a self assessment 10 June 2008 A. Badrichani – DG Regional Policy – Audit Unit J3.
Management verifications Franck Sébert European Commission DG Employment, Social Affairs and Equal Opportunities.
European Union Cohesion Policy
AUDIT AND CONTROL UNIT EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) AND COHESION FUND (CF) QUIRINO MEALHA DIRECTOR.
RELATIONSHIP BETWEEN THE MANAGING AUTHORITIES AND THE PAYING AGENCIES IN THE MANAGEMENT OF RURAL DEVELOPMENT PROGRAMMES Felix Lozano, Head of.
AUDITING COHESION AND STRUCTURAL FUNDS IN SLOVENIA Nataša Prah Ljubljana, 
Ch Financial Control PIFC in Iceland
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 Draft information note on the Annual.
PAWEL MAGDZIAREK IRREGULARITIES DETECTED DURING IMPLEMENTATION OF THE REGIONAL OPERATIONAL PROGRAM FOR WIELKOPOLSKA REGION.
THE ROLE OF EMIR UNIFIED INFORMATION SYSTEM IN MANAGEMENT VERIFICATIONS National Development Agency 9th June 2009.
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Control and Audit Nicholas Martyn.
Winding-up of EU Structural Funds Objective 1 programme Inese Š teina Head of Finance Control Department.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 System evaluation and sampling – first.
Public Finance Management A BASIS FOR BETTER UNDERSTANDING OF CORE CONCEPTS 2 DECEMBER 2014 – SOUTHERN SUN HOTEL, O.R INTERNATIONAL AIRPORT.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Audit of the Cohesion Fund Lena.
REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury REGIONAL COMPETITIVENESS OPERATIONAL PROGRAM (RCOP) Ankara, 27 June 2012 AUDIT AUTHORITY.
1 Management verifications Examples of good practice José FERREIRA DG Employment, Social Affairs and Equal Opportunities European Union Cohesion Policy.
Training and Certification - Mentoring Marija Matek Training Coordinator for Internal Auditors Ministry of Finance of the Republic of Croatia Central Harmonisation.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
FROM INSPECTION TO INTERNAL AUDIT - the Bulgarian experience - PEM–PAL workshop Chisinau June 2007 Ludmila Rangelova – Director CHU, MoF Stefan Belchev.
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
Regional Policy Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 NINETEENTH MEETING OF THE EXPERT.
29 March 2011 Audit Authority Audit Department Ministry of Finance 1.
Click to edit Master title style 1 WINDING-UP DECLARATION Practical experience PORTUGAL Carlos Trigacheiro Inspecção-Geral de Finanças (IGF) General Inspection.
Structural Funds in Ireland Structural Funds in Ireland Financial management, Financial management, control & audit - Ireland Dermot Byrne Head of Unit.
Commission’s Anti-Fraud Strategy (CAFS), 2011 COM(2011) 376 final Requirement of the EU Institutional and Horizontal legal framework for the.
Closure of the Programming Period ESF TWG Luxemburg 2 nd December 2015.
24 March 2011 Management and control system 1. Contents 1.Changes in the management and control system in The progress of the control/audit activities.
Structural Funds in Ireland Structural Funds in Ireland Financial control & audit - Financial control & audit - ERDF & Cohesion Fund operations Dermot.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
EN DG Regional Policy & DG Employment, Social Affairs & Equal Opportunities EUROPEAN COMMISSION Luxembourg, May 2007 Management and control arrangements.
© Shutterstock - olly Simplified Costs Options (SCOs) The audit point of view.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
National coordination of public procurement in Poland Ministry of Infrastructure and Development.
Legislative, normative and institutional framework of EU member states in relevant issues (internal control and risk management) - some key points drawn.
Financial Implementation of the Assistance from the Structural Funds and the Cohesion Fund of the EU Sylvia Indjova Head of Certifying Authority Director.
Quality assessment of internal audit activities performed on a periodical basis Nikolina Bibić, Ministry of Finance, Central Harmonization Unit Republic.
Structural Funds Financial Management and Control, Romania
  EXPERIENCE OF SLOVENIAN AUDIT AUTHORITY WITH FRAUD SUSPICON CASES Nataša Prah Prague, 3. November 2016.
INTERACTION AND COOPERATION
The Audit Authority The Netherlands Meeting AA Italy June 10th 2010
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Simplification in ESI funds for
INTERACTION AND COOPERATION
Control framework and Audit of European Structural and Investment Funds Visit of the Finance and Constitution Committee of the Scottish Parliament Brussels,
SOCIAL DIALOGUE WITHIN EUPAN
Bulgaria – Evolution in the Development of the Medium-Term Budgetary Framework Zagreb, Croatia | May 2018.
Ministry of National Economy of The Republic of Kazakhstan
ESF Training Seminar Reinforced role for the Audit Authority
Presentation transcript:

Annual Examination Meeting Audit Authority 13 September 2011

Contents 1.Structure of MCS 2.Implementation of recommendations of EC audit missions in June Audits of operations 4.Audits of Financial engineering instruments 5.Horizontal audits - plans for

3

EC audit missions in June 2011 (1) Recommendations implemented: 1. Public procurement audit checklists updated 2. Audits of the key bodies will be finalized until 30.09: –Managing Authority –Certification Authority –Public Monitoring Bureau 3. AA started direct reporting to OLAF 4

4. Role of opinions provided by the Public Monitoring Bureau (PMB) – assessed during system audit: national legislative framework in force Impact of not considering PMB opinions binding for projects under the Ministry of Transport Action plan for other issues is under preparation 5 EC audit missions in June 2011 (2)

EC audit missions in June 2011 (3) Planned activities: Withdrawal of the irregularities identified by AA will be checked during the audit in the Certification and Paying Authority (State Treasury) Follow up audit in Ministry of Transport – before ACR AA will assess the impact of deficiencies identified by EC auditors and potential systemic nature of them 6

AA is going to discuss with EC auditors essence of the following issues: Selection procedure (MoT) Justification of the estimated price and selection criteria (MoEPRD) Additional services in the absence of unforeseen circumstances (MoT) Eligibility date (MoT) Exclusion of lowest bid (Riga City Council) 7 EC audit missions in June 2011 (4)

EC audit missions in June 2011 (5) We very appreciate that audit report contains very detailed and useful recommendations and suggestions which we can use to improve our audit work and especially audit checklists of procurement procedure. 8

Audits of operations (1) Expenditures 1st semester 2010 Results of audit work - 2nd semester of recommendations with financial corrections: 3 recommendations are implemented 1 recommendation is cancelled by AA on the basis of additional information received 1 recommendation will be implemented until

Audits of operations (2) Expenditures 2nd semester 2010 Results of audit work – 1st semester of recommendations with financial impact - all agreed (accepted) by intermediate bodies Final report prepared and sent in 9 September 2011 Error rate for expenditure 2010 – 1,76% 10

Audits of operations (3) One case sent to prosecution office and reported to OLAF directly (1,04 milj.LVL) One recomendation rejected by MA – systemic weakness (publicity, procurement, storage of documents, tracebility of project selection) – without financial impact 11

Audits of Financial engineering instruments – LGA and LMLB (1) Audit reports sent to EC via SFC 2007: 1.Latvian Guarantee Agency (LGA) 2.Latvian Mortgage and Land bank(LMLB) Presentation of results of audits in Brussels Implementation of recommendations - resolution of the Minister of Finance and State secretary of all recommendations should be implemented and MA has to prepare the action plan – done

Audits of Financial engineering instruments – LGA and LMLB (2) Problems: 1)How practically irregularities can be withdrawn? Possible solutions: irregular amounts can be reallocated to other loans and guarantees within the same instrument and within the same beneficiary Financial correction should be withdrawn from the project and reallocated to other project (reducing of share capital) Irregular amounts can be covered by national budget and not withdrawn from the companies 13

Audits of Financial engineering instruments – LGA and LMLB (3) 2) Implementation of action plan and ACR 2011 Latvian Authorities informed us that they have sent the information about all 6 our identified non-compliant companies supported from LMLB to DG COMP to be sure that methodology applied by AA is not too restrictive. Reply of DG COMP will be used by Managing Authority in preparation of methodology and in implementation of our recomendations. How consultation of DG COMP can be used by us in preparation of annual opinion? 14

Horizontal audits in 2011/2012 Audit periodAudit EU funds procurement system Supervision of compliance with state aid rules system Management Information System 15

Thank you for your attention! 16 Nata Lasmane Head of Audit Authority Director of EU Funds Audit Deparment Phone