BY John Williams The Tapecoat / Royston Company

Slides:



Advertisements
Similar presentations
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Advertisements

Close Fit Pipe Lining. Overview Close Fit Pipe Lining is an internationally recognised technique which involves inserting a compact pipe or sleeve into.
December 27, 2012 The I.A. University of Ahvaz Mahdi Bavi Hossein Kharazmipour.
HVAC523 Heat Sources.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
ECDA Process for Cased Gas Transmission Pipelines
Installation. Indoor Unit Installation Typical Installation.
1926 Subpart J Establishes the requirements for welding and cutting in the construction industry Establishes requirements for equipment, fire protection,
Atmospheric Corrosion Discussion BY John Williams The Tapecoat / Royston Company CHASE Construction Products TAPECOAT / ROYSTON.
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
OSHA Office of Training and Education1 Excavations – Subpart P.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Solid State Welding Processes
TransCanada Corporation (TSX/NYSE: TRP)
Gas Transmission Pipelines
Dr. Joseph Greene Copyright 2000 all rights reserved Venting Chapter 11.
Installation. Indoor Unit Installation Typical Installation.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Steel Pipe Plumbing Systems
Mechanical for Oil Heat
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Purpose Power lines Equipment Assured Grounding GFCI Conclusion.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Flammable and Combustible Liquids
Basic Cathodic Protection Measurement and Monitoring- IR Considerations Western Regional Gas Conference 2008 Tempe, Arizona By Paul Sedlet, Accurate Corrosion.
NFPA 31 Standard for the installation of Oil- Burning Equipment
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
CIS Case History NACE Eastern Area Conference
Chevron Floating Roof Support
WESTERN REGION GAS CONFERENCE AUGUST 21, 2012 CORROSION 101
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Gandhinagar Institute of Technology
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
TRENTON Casing Filler Presentation
Cathodic Protection Requirements for Military Projects.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
Current Electricity is the rate at which charges pass a given point. The higher the current is the greater the number of charges pass the point each second.
OSHA Office of Training and Education
Excavation & Trench Safety
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
The C.I. Engines Fuel System  The C.I. engine demands that the fuel supplied is –  Timed to inject when the piston is near the end of the compression.
Flammable Liquids Directorate of Training and Education
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Integrity Management: Assessing & Dealing with Pipeline Road Crossings
Temperature Test Allows monitoring of temperature changes.
CORROSION MITIGATION OF A PIPELINE
CHAPTER 2 Pipeline Coatings.
Basic Corrosion Theory
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Criteria for Cathodic Protection
Hot Water Systems Cylinders and Systems.
TRENTON Casing Filler Presentation
Field Testing for Shorted Casings
Fundamentals Course Basic Corrosion
ABC Company ABC Chemical Complex Engineering Specification
Presentation transcript:

BY John Williams The Tapecoat / Royston Company Casing Discussion CHASE Construction Products                    TAPECOAT / ROYSTON  BY John Williams The Tapecoat / Royston Company

Casing Discussion Format Casing Background & History ECDA Filling a Casing Conclusions

Casing Background Casing installation began for the following: Potential for stress damage to the pipeline caused from heavy loads, trains and trucks. Unstable soils Corrosion caused by oxygen concentration cells because of road building processes Ease of removal and replacement of pipelines Venting of dangerous gasses away from road side

SP0 – 200 DEFINITIONS Carrier Pipe: The pipe or piping that is pushed through the casing or sleeve. Casing: A metallic pipe (normally steel) installed to contain a pipe or piping. Metallic Short: Direct or indirect metallic contact between two metallic structures. Electrolytic Contact: Ionic contact between two metallic structures via an electrolyte (water).

NACE SP0 – 200 - 2008 1.1 Steel casings are used to install and maintain pipeline crossings such as those at road and railroad rights of way. This standard details acceptable practices for the design, fabrication, installation, and maintenance of steel-cased pipelines. 1.2 Use of cased crossings should be avoided unless required by load considerations, unstable soil conditions, or when their use is dictated by sound engineering practices. 1.3 This standard does not imply that utilization of casings is mandatory or necessary.

NACE SP0 – 200 - 2008 3.2.3 Uncoated casing pipe is normally used. The use of coated or nonmetallic casing pipe is not recommended, due to potential shielding problems. 3.2.4 Vent pipes should be installed on both ends of a casing. 3.2.5 The casing vent hole should be at least one-half the diameter of the vent pipe (25 mm [1.0 in] minimum). The casing vent pipe should be a minimum of 50 mm (2 in) in diameter. 3.2.6 The casing and carrier pipe shall be properly supported for the entire length of the pipe, especially near the ends, to prevent sagging, metallic contact, and to avoid carrier pipe stress. Refer to Paragraphs 4.3 and 4.4. 3.2.7 Properly designed casing end seals shall be installed to prevent ingress of water and debris. Of course this rarely happens!

Historic Casing Practices Common Practice started w/ RR Crossings Highway requirements came later End Seal Types Concrete or Enamel w/ Rope Today: Wraps, Shrink Sleeves and Link Seal types Spacer Types Metallic Concrete coated pipe Wooden Today: Plastics

End Seal- Boot Style Note the metal banding

End Seal – Link Seal Note the metal bolts

Small Casing Spacer Note the metal bolts and the black coated metal

Large Casing Spacer Note the metal

How does a casing short to a pipeline? End seals crush or deteriorate allowing water to enter Pipe spacers crush or wrong type used such as metal or metal components Test leads make contact in the test station Vent pipes connected to the pipeline or supported on the pipeline Other possible problems such as metal tools left inside the pipe.

Shorted Casing Vent Pipe Casing Isolating Spacers A high percentage of shorted casings occur at the ends allowing the pipe to contact the casing causing an electrical (metallic) short. Vent Pipe Casing Isolating Spacers

PROBLEMS WITH CASED PIPELINES Once water enters a casing: Corrosion can develop Even if the casing is not shorted, the current may not be enough to adequately protect the pipe. Any current passing through the casing will only provide some protection to that part of the pipe immersed in the water. No way to properly monitor the potential inside the casing.

PROBLEMS WITH CASED PIPELINES Corrosion occurs on the external surfaces of pipelines inside casings whether the casing is shorted to the pipe or not! US Department of Transportation agrees that there are almost as many leaks in un-shorted casings as in shorted casings.

Direct Assessment: The four steps for assessing casings Pre-Assessment, Indirect Inspection, Direct Examination, Post Assessment Pre-Assessment Use Historical data to develop a scenario Coating Type Quality of Pipe Water Table Filled or not

Direct Assessment Indirect Inspection Survey the casing PCM / A-Frame Results categorized into four areas Severe Moderate Minor Clear

Classification Table Test Description Severe (Metallic Contact) Moderate (Electrolytic with Coating Holidays) Minor (Electrolytic Path) Electrically Clear Remarks Pipe to Electrolyte Potential (Industry Standard) Pipe to Electrolyte Potentials are severely depressed and below -850 mV Criterion Pipe to Electrolyte ON Potentials are borderline near casing Pipe to Electrolyte ON Potentials are slightly depressed near casing structure and are above -850 mV criterion Pipe to Electrolyte ON Potentials show no or little influence from casing proximity Pipe, Casing and OCP Potential Tests Should Always be Run Together Casing-to-Electrolyte Potential (Industry Standard) Casing to Electrolyte Potentials track Pipe Potentials and the difference in the Pipe and Casing "ON" Potentials < than 10 mV. Casing to Electrolyte ON Potentials partially track Pipe Potentials and the difference in the P/S & C/S "ON" potentials is greater than or equal to 10 mV and less than or equal to 100 mV . Casing to Electrolyte ON Potentials partially track Pipe Potentials and the difference in the P/S & C/S "ON" potentials is greater than100 mV . Difference in the P/S & C/S "ON" greater than 150 mV and are below bare steel potential for that environment Open Circuit Potential (OCP) between Casing and Pipe (Industry Standard) Difference in Pipe and Casing Structure Potential < 10 mV Difference in the P/S & C/S "ON" greater than or equal to 10 mV and less than or equal to 100 mV. Difference in the P/S & C/S "ON" greater than100 mV. Difference in the P/S & C/S "ON" greater than 150 mV. Internal Resistance (Industry Standard) Pipe-to-Casing (P/C) resistance less than or equal to 0.01 Ω P/C resistance greater than 0.01 Ω and less than or equal to 0.1 Ω. P/C resistance greater than 0.1 Ω. P/C resistance greater than 0.15 Ω Internal Resistance Test will determine metal to metal contacts

Direct Assessment Combine Pre-Assessment and Indirect Inspection data into action list for direct examination Immediate Work Scheduled Suitable for monitoring

Direct Assessment Direct Examination Dig up casing for further inspection There are three ways to verify condition of pipe Guided Wave In Line inspection Hydro-test

Methods for locating Corrosion on Pipe Inside a Casing Verification Tests Guided Wave This method use torsional data as well as compressional wave modes to detect cracks, metal loss and other defects on a carrier pipe inside a casing. In Line Inspection or Tethered Pigs ILI is used to determine the presence or absence of pitting-corrosion damage on carrier pipe inside a casing. Hydrostatic Test (Go-no-Go Type Test)

GUL – Shorted Casing 22

WHAT TO DO WHEN THE CASING CAN NOT BE REMOVED Correct shorted casing when possible Most casings are shorted at the end(s) where the end seals or supports have collapsed. Inspect the test lead wires. They may be shorted to the vent pipes or to each other. Make sure vent pipes are not welded to the pipe. Reposition the pipe and replace the end seals.

WHAT TO DO WHEN THE CASING CAN NOT BE REMOVED Add more CP to the pipeline to meet criteria. 3. Monitor with vapor leak test at vent pipes at required intervals to determine if a leaks exists. Use cameras to determine where short is located and if corrosion exists. ILI can determine if corrosion on pipe is present.

WHAT TO DO WHEN THE CASING CAN NOT BE REMOVED OR Clean and fill the casing with a wax type filler Make sure vent pipes have sufficient (2”) openings to the inside of the casing in the proper configuration for best fill. Clean out casing using air, power washer, or suction truck. Remove old End Seals to assist the cleaning, then replace with new seals. Pressure Test Seals with minimum 5psi. In one vent and out the other to ensure quality fill.

PHMSA §192.467 “Except for unprotected copper inserted in ferrous pipe, each pipeline must be electrically isolated from metallic casings that are a part of the underground system. However, if isolation is not achieved because it is impractical, other measures must be taken to minimize corrosion of the pipeline inside the casing.” 20

Types of Casing Fillers Hot applied Wax based materials with corrosion inhibitors Cold Applied Wax based materials with corrosion inhibitors Gels with corrosion inhibitors Inert gas (casing must be sealed to provide positive pressure). Practical? Inject vapor and or water based type inhibitor in annulus. Practical?

Requirements for filling a casing Diameter and length of casing and carrier Location of casing(s) Access to reach vents Preparation of casing including: Evaluation of vents to be set up in best configuration for successful fill New End Seals with 170F temperature rating if using a Hot Wax Casing Filler (Most Shrink Sleeves do not meet the temp requirement) Air pressure test of 5 psi, no spacer blockage, no vent blockage

Casing Fill Preparation The lower side of the casing should have the opening at the bottom to allow cleaning and placement of casing filler material. Vent Pipe Casing Isolating Spacers

The majority of Casing Fillers are a blend of petroleum wax and corrosion inhibitors. These hot materials are pumped into the casings by custom, heated trucks with meter controls and experienced personnel.

Other fillers are installed without heating. Casing filler should displace any water and prevent corrosion should water penetrate. Cold Applied Casing fillers come in barrels and use a mastic pump for installation. This system is good for smaller projects utilizing in-house labor.

INSTALLATION OF NEW CASING AND PIPE Do not install casing unless absolutely necessary. If installation is required, be sure to install properly coated pipe with enough supports to keep the pipe separate from the casing. Insure the end seals are properly installed. Attach vent pipes of proper size and location to provide installation of casing filler. Install casing filler as part of the project to help prevent corrosion in the future.

CONCLUSIONS All casings are a problem shorted or not shorted. Remove casings when possible, shorted or not. When you must install a new casing, fill it as part of the construction project cost Corrosion occurs almost as often in non-shorted casings as in shorted casings. Water is present in nearly all casings Filling a casing will remove the electrolyte / water from the equation and stop any further corrosion