How did Rwanda Operationalize Performance-based Financing ? Results Based Financing Workshop October 20-24, 2008 Gisenyi, Rwanda.

Slides:



Advertisements
Similar presentations
1 John Rwangombwa Permanent Secretary and Secretary to Treasury Ministry of Finance and Economic Planning Republic of Rwanda 1 Challenges and opportunities.
Advertisements

KENYA HEALTH SECTOR PARTNERSHIP Third IHP+ Country Health Sector Teams Meeting Brussels, December 2010.
21 July 2005 UNDG Policy Network On the MDGs UNDG Policy Network on the MDGs.
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
Building Statistical Capacity To Monitor Development Progress World Bank Development Data Group.
Scaling up Family Planning through Performance-Based Financing in Rwanda Dr. Louis Rusa, Director PBF support Cell Ministry of Health, Rwanda.
Step by step guide.
Changing Policy- Rwanda's change in guidelines African Regional meeting on interventions for Impact in essential obstetrics and new born care Addis Ababa.
Department for International Development Payment by Results.
Real World Implementation Challenges: Scaling-up Performance-Based Financing in Rwanda CERDI Conference, Dec, 2009 Session 3: ‘from pilot.
An Introduction to Expenditure Analysis ~ an overview of the NASA methodology Teresa Guthrie Centre for Economic Governance and AIDS in Africa OSI Workshop,
What is PRESS PRESS : a snapshot of ongoing statistical support reported by partners, answering the questions of who, what, where and how much ?
Commonwealth Local Government Forum Freeport, Bahamas, May 13, 2009 Tim Kehoe Local Government and Aid Effectiveness.
TRENDS IN DEVELOPMENT OF NATIONAL MONITORING AND EVALUATION SYSTEMS FOR AIDS RESPONSE Kevin Kelly Inaugural SAMEA Conference March 2007, Johannesburg.
Comprehensive M&E Systems
Harmonization and Alignment of aid for HIV/AIDS in Tanzania Dr J. Temba Director of Policy and Planning Tanzania Commission for AIDS.
Paying Health Care Providers for Performance: Evidence from Rwanda Paul Gertler UC Berkeley January 2009.
WHAT IS “CLASS”? A BRIEF ORIENTATION TO THE CLASS METHODOLOGY.
Community PBF in Rwanda CHD STRUCTURE MOH MCH DESK NUTRITION DESK COMMUNITY HEALTH DESK FP DESK EHDMNH MCH UNIT.
RWANDA PERFORMANCE BASED SYSTEM: PUBLIC REFORMS Claude SEKABARAGA, MD, MPH Director policy, planning and capacity building Ministry of Health October 2008.
1 Influence of PBF Indicators on Health Coverage Kathy Kantengwa M.D, MPA; PBF advisor, MSH Montreux, November 2010 Rwanda IHSS Project.
February 2010 Petra Vergeer, Health Specialist RBF Team, World Bank At a glance… Verification of performance linked to financial incentives by Joe Naimoli.
Development and Implementation of a National Multisectoral Output Monitoring System (SHAPMoS) for HIV Responses in Swaziland:  Challenges and lessons learned.
Debriefing for the Study Tour of the Malian and Senegalese Delegations to Rwanda October 25-30, 2009.
Measuring the cost-effectiveness of providing Family Planning and MNCH services as part of the basic package of health services in Cambodia David Collins.
RBF through the Public Health Sector in Low-Income Countries Essential Design Elements for a Health Center RBF model György Fritsche HDNHE RBF Seminar.
Performances Based Financing scheme in Rwanda INVESTING MORE STRATEGICALLY 1.
The Impact of Performance-Based Financing on the Cost of Health Services in Rwanda First Global Symposium on Health Systems Research Montreux, November.
Pay for Performance – a critical assessment (using recent Estonian experience) “Improving primary care in Europe and the US: Towards patient- centered,
Political Commitment for Family Planning in Rwanda
Overcoming HIV/AIDS Epidemic in Ukraine National programme supported by GFATM Presentation by Alvaro Bermejo and Andriy Klepikov at the Stakeholders Meeting.
BASELINE SURVEYS AND MONITORING OF PHARMACEUTICAL SITUATION IN COUNTRIES. Joseph Serutoke NPO/EDM WHO Uganda November 2002.
Choice of indicator and amount in the Performance Based Financing Rwanda IHSS Project First Global Symposium on Health Systems Research Montreux, November.
Results-based financing Why? What? How?. Jagaman district just erected a new health center and the health workers have started work. What are health workers.
Paulin Basinga Rwanda School of Public Health A collaboration between the Rwanda Ministry of Health, CNLS, SPH, INSP Mexico, UC Berkeley and the World.
PERFORMANCE BASED FINANCING FOR HEALTH IN RWANDA Dr RUSA U. Louis Ministry of Health Kigali-Rwanda Montreux 16th- 19th.
Overcoming HIV/AIDS Epidemic in Ukraine National programme supported by GFATM.
Paulin Basinga Rwanda School of Public Health Christel Vermeersch World Bank A collaboration between the Rwanda Ministry of Health, CNLS, SPH, INSP Mexico,
Nigeria, January 2010 Petra Vergeer Health Specialist, RBF Team.
What PBF can achieve; Example from Rwanda Claude SEKABARAGA, MD, MPH World Bank, Nairobi Hub. January 2010.
Governance and Coordination: SWAp SECTOR WIDE APPROACH COORDINATION.
Self-Directed Support. Personalisation ‘It enables the individual alone or in groups to find the right solutions for them and to participate in the delivery.
HIV/AIDS Prevention in the Infrastructure Sector 14 March 2008 Sector Strategy Development Department, Japan Bank for International Cooperation (JBIC)
National Community Health Performance-based Financing: design and implementation of supply-side model PBF workshop Bujumbura February 16 th, 2011 Ludwig.
Measuring costs related to the provision of health services for young people Karin Stenberg Department of Child and Adolescent Health and Development 16.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Rwandan Performance-Based Financing Process and Tools Gisenyi Results-Based Financing Workshop October 21, 2008 Dr Gyuri FRITSCHE Management Sciences for.
The Strengthened Approach to Supporting PFM reforms Applying the PFM Performance Measurement Framework Washington, D.C., January 17-18, 2007 Bill Dorotinsky.
HEALTH FINANCING MOH - HPG JAHR UPDATE ON POLICIES Eleventh Party Congress -Increase state investment while simultaneously mobilizing social mobilization.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
Facility supervision by the District Health Teams (DHTs) in Rwanda Track1 Meeting Maputo, Mozambique, August 10 th -12 th Dr. Ruben Sahabo.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
The South African Mother Baby Friendly Initiative Experience
1 Coordinating Line Ministry Response To HIV/AIDS Sierra Leone’s Experience African Region Consultation on HIV/AIDS 14 – 18 February 2005, Addis Ababa,
Objectives “To improve maternal and child health in Zimbabwe”. “by improving the availability, accessibility and quality of key reproductive and child.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
DEPARTMENT OF HEALTH Presentation to JMC Programmes for Persons with Disabilities 14 September 2007.
HHS/CDC Track 1.0 Transition in Rwanda Dr Ida Kankindi, Rwanda Ministry of Health Dr Felix Kayigamba, CDC-Rwanda August
Endris Mohammed Seid 1,2, Arjanne Rietsema 1 1: CORDAID-Zimbabwe 2: Ministry of Health and Child Care- Zimbabwe Improving Maternal, Neonatal and Child.
Supporting measurement & improvement of primary health care (PHC) at the facility and community levels Dr. Jennifer Adams, Deputy Assistant Administrator,
Country Ownership of PRSPs: Experience in 4 countries Bolivia (EBRP 3/01) Ghana (GPRS 2/03) Kyrgyz Republic (NPRS 1/03) Senegal (DSRP 4/02)
DHPI Approach at a Glance Facilitators’ Workshop on District Health Performance Improvement Lilongwe, 25 th – 27 th March 2015.
Coordinator of Project management Unit of Global fund and MAP projects
EGPAF GLOBAL: An Update on Transition Strategies & Implementation.
A service of UNAIDS Jonathan Brown Georgia, September 2007
What do we know and don’t know…
How did Rwanda Operationalize Performance-based Financing ?
Community of Practice Conference March 18-19, 2011 Saly (Senegal)
Using P4P to sustain high service delivery level during transition of management authority at Cambodia Bart Jacobs Luxembourg Development Institute Tropical.
Developing a Financial Sustainability Plan for Cambodia
Presentation transcript:

How did Rwanda Operationalize Performance-based Financing ? Results Based Financing Workshop October 20-24, 2008 Gisenyi, Rwanda

I. Context (before PBF) : Reconstruction after the genocide (emergency situations, NGOs). Free of charge …Willingness to come back to development and government leadership. User fees. 1999: health facility indicators are degradating. 2001: Butare: willingness to move away from fixed bonus and observation of heterogenous performance across health centres.

Chronology of Performance-based financing in Rwanda

The PBF pilot experiments ( ) Led at provincial level. International NGOs. Priority health interventions: child immunisation, ANC, assisted deliveries, family planning, curative care. Recipients: health centres. A fee-for service. E.g. 500 frw for a fully immunised child X quantity reported by the health centre.

Scale up: Roll-out Phases

Scale up / national policy 2005: GOR decided to scale up PBF in the entire country; need for strong coordination; decision to set up a technical working group to implement the strategy: MoH Strategic Plan 2006: From harmonization to creating a national model; PBF Budget line in the GOR budget; ICT management tools; extension to hospitals.

How did Rwanda coordinate partners to align payment? 1.GOR: –pays outputs throughout Rwanda through recurrent budget –inserted, since 2007, a budget line item for a PBF scheme for the District Steering Committee activities which are based at District level 2.PBF admin system allows for GOR and donor monies to flow through one channel: straight into the health facility bank accounts. E.g. MSH – USG contractor- pays HIV PBF in same account as GOR. Use of same management module, with database linked to payments. Other donors: ICAP-USG contractor, FHI and BTC do the same.

How did Rwanda coordinate partners to link payment to results? A challenge: the HIVAIDS money 3. Careful assessment of incentives through HIV monies in PBF: solution found by protecting PHC services by linking payments of HIV and PHC monies to levels of quality of general services. Unit Fee * Quantity * % Quality = Payment; 4. Global Fund is joining other partners in paying for HIV indicators into their supported sites (R7); 5. One national approach, same institutional set-up, same unit costs and same admin system facilitates alignment

Payment to results: taking quality into account Monthly at the HC the quantity/volume of activities are assessed (PHC & HIV); Once per quarter the Quality of 13 services at the HC is determined (185 indicators!) ; Quantity * Unit fee * % Quality Index leads to the amount to be paid as performance to the HC;

Institutional set-up

Contractual arrangements GOR contracts have been written at all levels: (i) between the Mayors and the district PBF steering committees (multilateral); (ii) between the local administration and the health center management committees and – in some cases- (iii) between the health center management committees and the individual health workers.

Administrative & management coordination PBF admin system with internet based data entry and retrieval facilitate decentralized management and future decentralized payments (by districts); Semi-automated payment module, linked to central database, witch allow for ease of payments by MOF (Ministry of finances) and others (MSH; BTC; FHI and GF); Central database allows for following trends and forecast accurately financial risk;

INSERT GRAPHIC TO ADD MAP MAP IS 6.17” TALL ICT management tools:

Monitoring and evaluation Internal Controls by health facilities and District (Quantity and Quality) is sometimes complemented by ‘External Controls’ i.e. from outside the District. Protocols exist for counter-verifying Quality and Quantity data. A challenge / a risk: No systematic control at community level.

How many persons to do that? The task at hand is too large for any one single technical agency or understaffed and lean central MOH department –MOH central PBF Unit (CAAC): 1 coordinator and two full- time staffs; –A key role for partners (members of the CAAC and on the field) –An Extended team approach has been put in place to cover 23 districts, and includes PBF focal points from the MOH, eight NGOs and a bilateral agency as a coordination structure

Results 1.Increases in the Volume of Services 2.Increase of the Quality of Services 3.Increase of staff productivity 4.Provider Enthusiasm and Motivation

Increase in Volume of Services (after 27 months) PBF IndicatorJanuary 2006 average/month/ health center ( 258 health centers on average) March 2008 average/month/ health center (286 health centers on average) Percentage increase (linear/log R2) Institutional Deliveries % (log 0.75) New Curative Consultations 9851,48951% (log 0.19) ANC: second dose of Tetanus Toxid % (log 0.63) Family Planning new users % (linear 0.88) Family Planning users at the end of the month % (linear 0.98)

Results for Family Planning Users at the end of the Month

FP Injections and oral methods at Health Centers % Increase in Prevalence over 24 months; ( average absolute increase from 3.89% to 10.63%) January 2006 through December 2007

Other improvements Over 16 months of PBF, the Quality increased on average by 7% across these 13 services. A sharp increase in staff productivity. Whilst all providers appreciate the additional bonuses that they earn through PBF, most also see clear advantages in the better services they provide, and take clear pride and ownership of these activities which originate ‘from within’ as opposed to being dictated from above.

Some challenges we met HIV/AIDS money! Building consensus on indicators Existing players with their own models resist change. Coordination of partners and activities on the ground.

Lessons Learned Start with easy things and then go progressively to complexity. Need for strong implementation oriented coordination structures Need for creating a large pool of trainers Need for strong leadership and political will from authorities Massive increases in service volume whilst maintaining or increasing the quality of these services is possible CBHI and PBF are synergetic!