Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Capture Cavity 1 Readiness Review Elvin Harms, Yuriy Orlov, Tom Peterson 5 September 2012.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
1.3 GHz FNAL Dressed Cavity S-1 Global Deliverable to KEK 7 July 2009.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
650 MHz Cryomodule Design, 21 Feb 2011Page 1650 MHz Cryomodule Design, 21 Feb 2011Page 1 Project X Cryomodules Tom Peterson and Yuriy Orlov with material.
ESS cavities interfaces
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
Mechanical Design of Main Linac Cryomodule (MLC) Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Tim O’Connell, Ralf.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
Cryomodule prototype Yun He, Dan Sabol, Joe Conway On behalf of Matthias Liepe, Eric Smith, James Sears, Peter Quigley, Tim O’Connell, Ralf Eichhorn, Georg.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
What’s Inside a TESLA Cryomodule Tom Peterson Proton Driver Meeting February 9, 2005.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
LCLS-II Cryomodule Design
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
3.9 GHz Cryomodule Design Tom Peterson, Yun He, Matt Kramp 20 November 2015 Preliminary Design Review.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
650 MHz, Beta = 0.9, 11 April 2012Page 1650 MHz, Beta = 0.9, 11 April 2012Page 1 Project X Beta = 0.9, 650 MHz Cavity and Cryomodule Status Tom Peterson.
650MHz-Cryomodule for CEPC
CERN – Zanon discussions
Stress and cool-down analysis of the cryomodule
IHEP Cryomodule Status
Cryomodule design modifications for C75
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
CRYOMODULE FINAL ASSEMBLY
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Design Overview
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque

2 -Existing CC1 Vacuum vessel: 800mm-OD, 1800mm-long -Cold mass G10 Support Rods location 1 -80K (N 2 )-return 2 -80K (N 2 )-supply K (He)-cooldwn K (He)-supply K (He)-supply K (He)- return -MC Port with New MC -Cold mass Fixing point in “Z” Top port with Cryo piping BEAM Y. Orlov09/05/2012

-Vacuum vessel -80K shield -5K intercept (x2) -Gate valve with supports (x2) -1.3 GHz cavity RI29 -Cold mass fixing G10 post in “Z” direction 3 Y. Orlov09/05/2012

-MC Warm -MC Cold -G10 Support Rods (x8) CM support Frame 4 Y. Orlov09/05/2012

-Existing GV access Ports USDS 5 G10 Support Rods MC Warm with supports Y. Orlov09/05/2012

Serial #: TB9RI MV/m -MC cold -Blade tuner (install after CR assembly) -Ti He vessel with 2-phase He pipe -9 cell cavity -External magnetic shield (install after CL Assy 6 Y. Orlov09/05/2012

-Cavity without Blade Tuner Under vacuum (?) -Gate Valve (x2) US DS 7 -Bellows between Cavity flange and GV -DS BP bellows connect to Vacuum Vessel (bellows restrains not shown) -US BP bellows connect to Vacuum Vessel (bellows restrain not shown) Y. Orlov09/05/2012

US DS -5K He Piping line -5K Intercept MC -Warm Up Cool down Line -5K Intercept to Space Frame -5K Intercept to Beam Pipe by Cu Bar (x2) -1.4 K He Supply line -US GV Support -80K intercept -Combined block for needle Bearings and G10 rods supports (x4) 8 Y. Orlov09/05/2012

-Pumping Line with He Level Indicator -1.3 GHz Cavity End Magnetic shields -Tuner motor thermal intercept -Auminum Space Frame -DS HOM connector intercept DS US -DS GV Support with needle bearings -US HOM connector intercept -US GV Support with needle bearings 9 Y. Orlov09/05/2012

10 GV 5K 80K-80K Intercept -5K intercept -G10 Vibration compensator (2 parts) Y. Orlov09/05/2012

- Weldable Al 6061 space frame (needle support places are machined after welding) -4 Needle supports combined with G10 rods support -US Gate Valve Support 11 Y. Orlov09/05/2012

Y. Orlov mm Plungers with spring washers (compensate thermal shrinkage) “ Hard” screw connection Installation Gap ~4mm

 Total DRAWINGS: ~91 -New drawings: 61+8(not released + released) -ILC drawings: 22 (Assembly DWG’s + parts DWG’s)  Ordered subassemblies: 3 (DWG##, MD , MD , MC ) + existing ILC parts (were ordered for CM3-CM6) 09/05/2012Y. Orlov 13