Notrees Presentation – ERCOT Integration workshop Slides for Registration/Integration challenges.

Slides:



Advertisements
Similar presentations
RES-E Impact on Transmission Grid and Power System Reserves
Advertisements

NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
GridWise ® Architecture Council Becky Harrison GridWise Alliance Future of the Grid Evolving to Meet America’s Needs.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
1 © 2012 Lockheed Martin Corporation, All Rights Reserved Intelligent Microgrid Solutions Efficient, Reliable and Secure Solutions for Today’s Energy Challenges.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Energy Storage Battery Storage February MW Los Andes Chile, MW Johnson City New York, MW Laurel Mtn. West Virginia, 2011 AES.
Welcome to First Hydro Company 4 June First Hydro Slide 2  Approximately 200 employees across four sites  Dinorwig –the largest pumped storage.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
Loads Acting as a Resource Relationships with QSEs and LSEs
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
1 New Resource Qualification Testing Sandip Sharma Supervisor, Operations Analysis New Generation Information Forum ERCOT Public November 4, 2014.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Simon Gamble Manager Hybrid Off-Grid Solutions Running a power grid with 100% renewables on King Island, Australia.
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
2015 World Forum on Energy Regulation May 25, 2015
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Wind Cost Allocation Task Force Update to WMS February 17, 2009.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Sai Moorty ERCOT Integration Options into ERCOT systems.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Aaron Townsend National Renewable Energy Laboratory October 28, 2013 Colorado Rural Electric Association Energy Innovations Summit Energy Storage in the.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Moving Toward Hybrid Power Systems Creating value with utility scale energy storage ERCOT Renewable Technology Working Group April 2009.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
August 30, 2012 Modeling Solar, Storage and Inverter based resources John Adams Resource Integration Planning Working Group.
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Proprietary & Confidential “Transforming at the Speed of Value” Steven Hauser Vice President, GridPoint President, The GridWise Alliance August 4, 2008.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 15, 2012 PV & Storage Workshop PV and Storage Integration strawman proposals & discussion John Adams Principal Engineer.
VIIP Proposal Preparation Workshop November 3, 2015.
Hawaii Energy Storage Seminar: Utility Regulation Service
Monterey Plaza Hotel October 8-10, 2007
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Distributed Generation Registration June 30, 2008.
Delivering for 2020 TSO Facilitation of Renewables Studies EirGrid Customer Conference Jonathan O’Sullivan October 2009.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Accelerating the Deployment of Clean Renewable Generation.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
GC0104 – Demand Connection Code (DCC)
Market-based Ancillary Service Provision by Demand Side Management
Asia-Pacific Energy Regulatory Forum
Appeal of PRS Rejection of NPRR 667
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
The New Texas Wholesale/Retail Market
Panasonic Battery Project
31st USAEE/IAEE North American Conference
2500 R Midtown Sacramento Municipal Utility District
30 Minute Reserves EPFSTF January 4,
Sandip Sharma ERCOT Manager, Operations Planning
The logic progression... Northern Ireland has high wind penetration,
Presentation transcript:

Notrees Presentation – ERCOT Integration workshop Slides for Registration/Integration challenges

2

Notrees Battery Storage System 36 MW / 24 MWh output Technology: Advanced lead-acid Dynamic Power Resource OEM Partner – Xtreme Power (XP) 24 Dynamic Power Modules with 1.5 MW / 1.0 MWh rating Modules housed in ~ 6,000 sq. ft. building  Construction began in October 2011; fully operational Q  Potential areas of operation:  Frequency Regulation  Energy Arbitrage  Voltage Support  Wind Firming  Curtailment Mitigation  Other Ancillary Services (Non- Spinning Reserve, Black Start)

Registration of new Storage resource Year-long registration process Primary source of revisions/discussion on how to ‘fit’ Storage technology into existing framework for ‘conventional’ resources Ongoing ERCOT/Duke/ XP meetings

Limitations of existing Registration/Integration process Issue 1: Resource Modeling Challenge: x1 Physical Asset, but ERCOT systems see x2 Resources - x1 Gen Resource (GR) and - x1 Load Resource (LR) Outcome: Operating duplication & complexity  Separate GR and LR qualifications  Telemetry allocation to identify 'Gen Resource' mode and 'Load Resource' mode  Complex control system functions to ensure RT consistency between modes  Separate GREDP/Performance obligations  How to avoid 'double-counting' in ERCOT market operations processes  Settlement treatment (addressed via PUC rule implementation) 5

Limitations of existing Registration/Integration process Issue 2: Standardized Registration & Qualification formats Challenge: Standardized RARF information requirements incompatible with operating frameworks for inverter-based Storage technologies, e.g.  Planning Data  Protection Data  Operating Parameters Outcome: Numerous "errors" and "rejections" throughout registration process  Source of automatic registration delays & much discussion  Provision of system-specific technical information to identify performance characteristics 6

Limitations of existing Registration/Integration process Issue 3: Alignment of existing operating procedures with alternative operating characteristics Challenge: Existing performance requirements designed around installed capabilities Outcome: Potential to limit capabilities of technology, e.g.  Static requirements on Voltage support, Frequency response limit the range of performance available from new types of resources Issue 4: Unfamiliar Commissioning activities Challenge: Project requirements in advance of Operations unfamiliar territory for System Ops e.g.  'Cycling' of batteries to maintain battery health during construction/commissioning  Inverter testing requirements Outcome: Developer must ensure that Site activity is 'visible' from early stage 7

Issue 5: Co-location of different asset classes Challenge: Key role for Storage to support other Resource operations and enhance overall grid management – but compounds registration, testing & modeling challenges presented by existing process… Outcome: Additional layer of complexity for both Storage and co-located resource 8 Limitations of existing Registration/Integration process

Areas Previously Identified by ERCOT 9