Collaboration Meeting, Oct 6 2011: Start Counter Start Counter Eric Pooser W. U. Boeglin L. Guo P. Khetarpal Experimental Setup SiPM Scan Attenuation Lengths.

Slides:



Advertisements
Similar presentations
Session 4: Termination and Splices. 2 FO Connectors Specifications Specifications Loss Repeatability Environment (temp, humidity, vibration, etc.) Reliability.
Advertisements

The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
R&D of Strip/Block Scintillators E.P.Jacosalem, S.Iba, N.Nakajima, H.Ono, A.L.Sanchez, A.M.Bacala & H.Miyata GLD Calorimeter Group 8 th ACFA Workshop on.
The Detection of Radioisotopes Using a Thin Scintillating Fiber in a Spiral Adam Jernigan and Eric Blue Advisor: Dr. Thomas Dooling The University of North.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
How We Became Experimentalists Suzanne Levine Saba Zuberi Len Zheleznyak REU 2002.
Studies of Small Scintillating Cells with Modified Geometries Alexander Dyshkant for NICADD at NIU.
Timing Properties of T0 Detectors At PHOBOS Saba Zuberi, Erik Johnson, Nazim Khan, Frank Wolfs, Wojtek Skulski University of Rochester.
Cosmic Ray Muon Detection Department of Physics and Space Sciences Florida Institute of Technology Georgia Karagiorgi Julie Slanker Advisor: Dr. M. Hohlmann.
Ultrafast Experiments Hangwen Guo Solid State II Department of Physics & Astronomy, The University of Tennessee.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
Trend ground array 1 1.General considerations 2.Study on the prototype detector 3.Inclined ground array simulation 4.Making work plan in 2014.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
1 Scintillators  One of the most widely used particle detection techniques Ionization -> Excitation -> Photons -> Electronic conversion -> Amplification.
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
BCAL R&D GlueX Collaboration Meeting Newport News, Virginia September 9-11, 2004 George Lolos, Zisis Papandreou.
Position Sensitive SiPMs for Ring Imaging Cherenkov Counters C.Woody BNL January 17, 2012.
Development of New Detectors for PET Imaging at BNL DOE/JLAB Meeting Bethesda, MD May 20, 2004 Craig Woody Physics Dept Brookhaven National Lab RatCAPBeta.
Photo-detector and scintillator studies at ITEP Outline 1. Check of casting form 2. Study of MRS APD’s from CPTA 3. MC simulation of light collection in.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Simulations of the double funnel construction for LET. Comparison with a single funnel The aim was to optimise the double funnel configuration to give.
Fiber Loss Monitor and Carbon IP Scanner Setup and operational tips August
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Trip-t testing progress report
PCAL Strips light transmission properties April 25, 2011April 26, 20111April 27,
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
Gain stability and the LYSO beam radiation monitor measurements
1 Study of scintillator/PMT properties for PoGO experiment August 25, PoGO Teleconference Tsunefumi Mizuno BGO Transmission.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
ECFA-DESY, Praha 16/11/02 S. Nemecek: Tiles & fibres... Tile and fibre measurements (Tile HCAL) J. Cvach, S. Němeček Institute of Physics AS CR, Prague.
CLAS12 Pre-shower H. Voskanyan (YerPhI)  R&D: Test measurements  Prototype CLAS Collaboration, CLAS12 TWG Meeting February 28, 2007, JLAB.
Gamma Detector of Plastic Scintillator Oct. 2, 2009 IP-BSM Group 1.
Potential Advantages of Digitally Sampling Scintillation Pulses in Time Determination in PET Q. Xie 1,2, C.-M. Kao 1, X. Wang 2, N. Guo 2, C. Zhu 2, H.
External Trigger System PAB To provide straight muon track efficient selection for TPC performance characterization Adjustable geometry for.
Small, fast, low-pressure gas detector E. Norbeck, J. E. Olson, and Y. Onel University of Iowa For DNP04 at Chicago October 2004.
Start Counter Calibrations. Simulation of Random Charged Tracks Start Counter (ST) paddle geometry is parameterized by 5 values: Length of the straight.
Photon Transport Monte Carlo September 27, 2004 Matthew Jones/Riei IshizikiPurdue University Overview Physical processes PMT and electronics response Some.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FTOF Status Anton A. Izotov, Frascati
WP 22 – SciFi Development and Characterisation of Inorganic Scintillating Fibers Made of LuAG:Ce and LYSO:Ce S. Diehl 1, R. Novotny 1, Aubry Nicolas 2.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
GSI 9Feb09 NMI3 – Integrated Infrastructure Initiative for Neutron Scattering and Muon Spectroscopy, Joint Research Activity (JRA8): MUON-S. Contract:
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
The Ludlum Project Advisors: Dr. Randal Ruchti, Dr. Dan Karmgard Mark Vigneault Teacher: Mark Kirzeder Students: Kristen Anderson Mengwen Zhang.
Activities and Results from PNPI GATCHINA
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
An active target for MEG2, a status report
Commissioning of the Crystal evaluation setup
Ultra fast SF57 based SAC M. Raggi Sapienza Università di Roma
Status of Prototype Preparation and SiPM Characterization
K. Sedlak, A. Stoykov, R. Scheuermann
SCINTILLATING DIGITAL HADRON CALORIMETER
Detector Configuration for Simulation (i)
Deng Ziyan Jan 10-12, 2006 BESIII Collaboration Meeting
Времяпролетный детектор PANDA
Efficiency Study of Prototype Scintillator for INGRID
CLAS 12 Status of the test bench Calculation of the time resolution
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

Collaboration Meeting, Oct : Start Counter Start Counter Eric Pooser W. U. Boeglin L. Guo P. Khetarpal Experimental Setup SiPM Scan Attenuation Lengths Time Resolution Studies Future Plans

EJ-212 Scintillator Bar Collaboration Meeting, Oct : Start Counter Dimensions: 3 x 15 x 600 (mm) o Machined to form 30 paddle design With and without a VM2000 placed at the tip of the scintillator mounted in dark box o VM2000: highly reflective material SiPM coupled to the scintillator 90 Sr source Scintillator Trigger Detector SiPM

Collaboration Meeting, Oct : Start Counter Geometry Of Bent Scintillator

Collaboration Meeting, Oct : Start Counter Experimental Set Up

VM2000 at Nose of Scintillator Collaboration Meeting, Oct : Start Counter

The SiPM

Collaboration Meeting, Oct : Start Counter SiPM Measurements Source ~ 25 cm from SiPM Seven measurements (SiPM scan) were made across the face of the SiPM o These are the "relative positions" New Pre-Amp greatly improved rise time of signal o Thanks Fernando Barbosa! o Old rise time ~ 20 ns o New rise time ~ 4 ns

SiPM Scan Collaboration Meeting, Oct : Start Counter

SiPM Scan Collaboration Meeting, Oct : Start Counter

SiPM Scan Collaboration Meeting, Oct : Start Counter

SiPM Scan Collaboration Meeting, Oct : Start Counter

Coupling to SiPM (Sweet Spot) Collaboration Meeting, Oct : Start Counter

Attenuation Lengths Measured attenuation lengths of all five scintillators o With and without VM2000 o Coupling of scintillator to "sweet spot" of SiPM Scintillators were rated from 1 (best) to 5 (worst) o Based on visual inspection of surface quality o Rated prior to measurements Defects on surface of scintillators o Buffing scratches (poor polishing techniques)  Worst in region of bend o Crazing (stress of machining or improper handling) o Deep gashes on surface o Poor milling of edges Collaboration Meeting, Oct : Start Counter

Damaged Surface on Bend Scintillator Dim.No VM BackingVM Backing Collaboration Meeting, Oct : Start Counter

Defective Milling of Edges Scintillator Dim.No VM BackingVM Backing Collaboration Meeting, Oct : Start Counter

Attenuation Length Plot for Scintillator 1 (Typical Response) Collaboration Meeting, Oct : Start Counter VM2000 has no significant effect Fit Range ( cm) No VMVM

Average Attenuation Lengths Collaboration Meeting, Oct : Start Counter The attenuation lengths of all five scintillators are approximately the same

Attenuation Lengths Summary Poor light output due to poor surface quality o Damaged surface attributable to Plastic Craft manufacturing and polishing techniques Light output is worst in the region of the bend o ~ 41.6 cm down stream of SiPM Small improvement with VM2000 backing Bent scintillator has worse attenuation length compared to straight scintillator o 3.7x without VM2000 o 6.5x with VM2000 Collaboration Meeting, Oct : Start Counter

Coupling of scintillator to "sweet spot" of SiPM We measured the time resolution as a function of distance of source from SiPM Comparative measurement with straight scintillator o Both with and without VM2000 Comparative time resolution measurements with FM-PMT, Old SiPM, and New SiPM Collaboration Meeting, Oct : Start Counter Time Resolutions Studies

Time Resolution Plots Collaboration Meeting, Oct : Start Counter NO VM VM Straight Bar Bent Bar

Comparison of Time Resolutions Scint. Dim. (mm) Collaboration Meeting, Oct : Start Counter Distance of Source = 3.0 cm from SiPM Source in Bent Region ~ 41.6 cm from SiPM

Time Resolution Comparisons (Straight Bar) Collaboration Meeting, Oct : Start Counter

Time Resolution Summary Without VM2000 o Time resolution is relatively constant in nose With VM2000 at tip of the nose o Time resolution improves as a function of increasing distance Worst time resolution occurs in the bent region o Same as light output Time resolution measurements were relatively consistent among all of the scintillators Overall we find: 230 ps < σ < 640 ps for the bent scintillators New Pre-Amp improved the time resolution as expected Collaboration Meeting, Oct : Start Counter

Summary SiPM is suitable for timing measurements Geometry of nose results in: o Faster propagation of light (~60ns > c) o Relatively constant time resolution in bend o Better time resolution with VM2000 Bad surface quality results in: o Broad range of timing resolution o Poor light output o Short attenuation lengths More care must be taken by Plastic Craft Collaboration Meeting, Oct : Start Counter

Future Plans Scintillators have been sent back to Plastic Craft for re- polishing with advised polishing techniques o This should improve light output and timing resolution Techniques of wrapping VM2000 to bent scintillators will be investigated Comparative measurements will be made o Re-polished scintillators o Wrapped scintillators (VM2000) Coupling of scintillators to light guides and SiPM o Associated measurements Final design of start counter has yet to be finalized o 40, 30, 24 ? Collaboration Meeting, Oct : Start Counter

Thank you for your time! Questions? Collaboration Meeting, Oct : Start Counter

Propagation Studies We measured the speed of light within the five scintillators o With and without VM2000 Fit two separate linear functions o Straight Section o Bent Section Collaboration Meeting, Oct : Start Counter

Propagation Studies (Scintillator 4) Collaboration Meeting, Oct : Start Counter Similar traits were noticed among the five scintillators

Propagation Speed Summary Linear relationship was found between the time of propagation and the distance from the SiPM (as expected) There exists a difference in the fitted slopes when comparing the nose and the straight section On average the propagation speeds differed in the nose when compared to the straight section as: o Without VM2000  4.61 cm/ns faster o With VM2000  6.23 cm/ns faster Due to the change in geometry of the scintillator after the bend o Fewer number of reflections in nose Collaboration Meeting, Oct : Start Counter

Light Output (SiPM Scan) Collaboration Meeting, Oct : Start Counter

Comparative Plot (Light Output) Collaboration Meeting, Oct : Start Counter

Comparative Plot (Time Resolution) Collaboration Meeting, Oct : Start Counter

Comparison of Time Resolutions Scint. Dim. (mm) Collaboration Meeting, Oct : Start Counter

Attenuation Lengths Collaboration Meeting, Oct : Start Counter

Trigger PMT and 90 Sr Source Collaboration Meeting, Oct : Start Counter