Chapter 15 Fundamentals of Variance Analysis. 15-2 Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.

Slides:



Advertisements
Similar presentations
Using Budgets for Planning and Coordination
Advertisements

Cost Management Chapter 10 Static and Flexible Budgets
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Cost Variances for Fixed and Variable Overhead Variances for Variable Overhead Variances for Fixed Overhead.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 23.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Standard Costs and Variance Analysis Chapter Ten & Eleven.
Additional Topics in Variance Analysis Chapter 17 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
C H A P T E R 6 Monitoring Performance in Cost, Profit and Investment Centers.
Lecture 6 Cost Variances for Direct Costs. The derivation of the price and efficiency variances AP ACTUAL COST AQ AP = actual price per unit of input.
Fundamentals of Variance Analysis Chapter 16 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2003 Pearson Education Canada Inc. Slide 7-76 Chapter 7 Flexible Budgets, Variances and Management Control: I.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Chapter 17 – Additional Topics in Variance Analysis
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/IrwinCopyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved. Fundamentals of Variance Analysis Chapter 16.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 14 Professor Jeff Yu.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 21 Flexible Budgets and Standard Costing.
1 Module 22 Standard Costs and Variance Analysis.
Deluxe Linens Deluxe Linens makes high-end sheets which they sell to major retail stores and on their website. The budgeted costs for materials and direct.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 The Flexible Budget and Standard Costing Chapter 13 Objectives: Develop and.
© 2014 by McGraw-Hill Education. This is proprietary material solely for authorized instructor use. Not authorized for sale or distribution in any manner.
Budgetary Planning and Control
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Budgeting: The Basis for Planning and Control – Planning Developing objectives for acquisition and use of resources. – Control Steps taken by management.
Variances Short summary. Static Budgets A static budget ( master budget) is prepared for only one level of a given type of activity. All actual results.
Flexible Budgets and Standard Costs Chapter 23 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Chapter 13 – Overhead and Marketing Variances
Performance Evaluation
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
ACC3200 STANDARD COSTING.
© 2012 Pearson Prentice Hall. All rights reserved. Using Budgets for Planning and Coordination Chapter 10.
Chapter 16 Fundamentals of Variance Analysis.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Flexible Budgets and Variance Analysis.
Flexible Budgeting Chapter 07, 08
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Performance Evaluation and Using Variances Chapter M6.
23-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. McGraw-Hill/Irwin.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Copyright © 2007 Prentice-Hall. All rights reserved 1 Flexible Budgets and Standard Costs Chapter 11.
Chapter 22. Prepare a flexible budget for the income statement.
Standard Costing and Variance Analysis
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
20 Monitoring Performance in Cost, Profit and Investment Centers
Standard Cost Systems: A Financial Reporting Perspective Using Microsoft Excel Appendix 10B.
Fundamentals of Cost Accounting, 4th edition Lanen/Anderson/Maher
© 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Foundations and Evolutions
Performance Evaluation Using Variances from Standard Costs
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
AMIS 3300 Chapter 9.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
© 2017 by McGraw-Hill Education
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Chapter 15 Fundamentals of Variance Analysis

15-2 Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets. 3.Compute and interpret the sales activity variance. 5.Compute and use variable cost variances. 1.Use budgets for performance evaluation. 6.Compute and use fixed cost variances. 7.(Appendix A) Understand how to record costs in a standard costing system.

15-3 Budgets and Performance Evaluations L.O. 1 Use budgets for performance evaluation. Budgeted income statement, production budget, budgeted cost of goods sold, and supporting budgets Operating Budgets Budgets of financial resources; for example, the cash budget and the budgeted balance sheet Financial Budgets Difference between planned result and actual outcome Variance

15-4 Profit Variances Variance that, taken alone, increases operating profit Favorable Variance Variance that, taken alone, reduces operating profit Unfavorable Variance

15-5 Budgets: An Example Bayou Division Budget and Actual Results August

15-6 Budgets: An Example Continued Bayou Division Budget and Actual Results August

15-7 Flexible Budgeting L.O. 2 Develop and use flexible budgets. Budget for a single activity level; usually the master budget Static Budget Budget that indicates revenues, costs, and profits for different levels of activity Flexible Budget

15-8 Sales Activity Variance L.O. 3 Compute and interpret the sales activity variance. Difference between operating profit in the master budget and operating profit in the flexible budget that arises because the actual number of units sold is different from the budgeted number; also known as sales volume variance

15-9 Profit Variance L.O. 4 Prepare and use a profit variance analysis. Analysis of the causes of differences between budgeted profits and actual profits Profit Variance Analysis Sales price variance Production cost variances Marketing and administrative cost variances

15-10 Profit Variance Analysis Bayou Division Profit Variance Analysis August Total variance from master budget = $75,000 U Total variance from flexible budget = $31,000 F Sales activity variance

15-11 Sales Price Variance Difference between the actual selling price and budgeted selling price multiplied by the actual number of units sold ($ $10) x 80,000 units = $40,000 F * * From the profit variance analysis Sales Price Variance

15-12 Variable Production Costs Provides the quantities of each input required to produce a unit of output and the budgeted unit price for each input Standard Cost Sheet

15-13 Production Cost Variance Actual Actual Inputs at Standard Prices Flexible Production Budget Actual input price (AP) times actual quantity (AQ) of input Standard input price (SP) times actual quantity (AQ) of input Standard input price (SP) times standard quantity (SQ) of input allowed for actual good output AP x AQSP x AQSP x SQ Total variance (1) minus 3) Price variance (1) minus (2) Efficiency variance (1) minus (3) L.O. 5 Compute and use variable cost variances. (1) (2)(3)

15-14 Production Cost Variance Continued Price Variance Difference between actual price and budgeted price Multiply this difference by the actual quantity purchased AQ AP - SP

15-15 Production Cost Variance Continued Efficiency Variance Difference between the actual quantity used and the budgeted quantity for the actual level of activity Multiply this difference by the budgeted price per unit SP AQ - SQ

15-16 Direct Materials Variance Frames produced in August80,000 Direct materials Actual materials cost 328,000 $.60/lb $196,800 Price variance AQ AP - SP 328,000 $.60 - $.55= $16,400 U Efficiency variance SP AQ - SQ $ ,000 – 320,000= $4,400 U 80,000 x 4 lbs $16,400 U$4,400 U $20,800 U Total material variance

15-17 Direct Labor Variance Direct labor Actual direct labor cost 4,400 $18/hr$79,200 Price variance 4,400 $18 - $20 = $8,800 F AQ AP - SP Efficiency variance $20 4,400 – 4,000 = $8,000 U SP AQ - SQ 80,000 x.05 Total direct labor variance $800 F $8,800 F $8,000 U

15-18 Variable Overhead Variance Variable overhead Actual variable overhead cost$53,680 Actual overhead- Actual standard price or POHR Total variable overhead variance $5,680 U $53,680 - $12 4,400 = $880 U Price variance = $4,800 U Efficiency variance $12 4,400 – 4,000 $4,800 U$880 U

15-19 Total Variable Manufacturing Cost Variance Materials PriceEfficiency $20,800 U16,400 U8,000 U $800 F8,800 F8,000 U Direct Labor Variable Overhead $5,680 U880 U4,800 U $25,680 U Total variable manufacturing cost variance Total

15-20 Fixed Cost Variance L.O. 6 Compute and use fixed cost variances. Spending (or budget) Variance Price variance for fixed overhead The difference between budgeted and actual fixed overhead $195,000 – $200,000 = $5,000 F

15-21 Production Volume Variance Arises because actual production differs from budgeted production. The difference between budgeted and applied fixed overhead $200,000 budget – $160,000 applied = $40,000 U $200,000 budget 100,000 budgeted units = 2 per unit 80,000 units x $2 = $160,000 applied

15-22 Chapter 15 Is this Favorable or Unfavorable ?