Advanced Scheduling Concepts Software can land an aircraft. Why can’t it plan a project? Shane Archibald, Managing Principal Archibald Associates & Spider.

Slides:



Advertisements
Similar presentations
Quantitative Cost & Schedule Risk Assessment
Advertisements

CP Chapter 4 Schedule Planning.
Chapter 7 Schedule Control
© 2013 IBM Corporation Discover how to simulate and forecast the impact of changes on your workload environment How can you better satisfy Service Level.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Project Time Management
Metrics for Process and Projects
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
Welcome to RAI, the future of collaborative Project Risk Management Overview of Project Risk and Issue Management RAI for the Project Manager RAI for the.
Importance of Project Schedules
1 A Second Stage Network Recourse Problem in Stochastic Airline Crew Scheduling Joyce W. Yen University of Michigan John R. Birge Northwestern University.
SE is not like other projects. l The project is intangible. l There is no standardized solution process. l New projects may have little or no relationship.
Chapter 1 Program Design
Chapter 3 Planning Your Solution
Project Plan Development
Tools and Techniques for Corporate Project Management Vladimir Liberzon Spider Management Technologies Session # PTA08.
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Simulation.
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
HIT241 - TIME MANAGEMENT Introduction
Testing and Cost / Benefit Tor Stålhane. Why cost / benefit – 1 For most “real” software systems, the number of possible inputs is large. Thus, we can.
Introduction to Monte-carlo Analysis for software development
Software Project Management Task Estimating and Scheduling
1 Validation & Verification Chapter VALIDATION & VERIFICATION Very Difficult Very Important Conceptually distinct, but performed simultaneously.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Insurance Group, USA.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
The Project Plan IT Project Management COSC
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Metrics 2.0 Rick A. Morris, PMP, OPM3, MCITP
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
Software Engineering Saeed Akhtar The University of Lahore Lecture 6 Originally shared for: mashhoood.webs.com.
Fall CS-EE 480 Lillevik 480f06-l10 University of Portland School of Engineering Senior Design Lecture 10 Webs Scheduling MS Project (Optional)
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
FORS 8450 Advanced Forest Planning Lecture 5 Relatively Straightforward Stochastic Approach.
M ONTE C ARLO SIMULATION Modeling and Simulation CS
Introducing Project Management Update December 2011.
© 2008 Sterling Commerce. Confidential and Proprietary. How to Get Along with Project Using Microsoft Project so that it actually works for you, not against.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Problems, Methods and Tools of Advanced Constrained Scheduling Session 9 Shane Archibald Archibald Associates & Spider Project (USA) “PMI” is a registered.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Time Management
Simulation Chapter 16 of Quantitative Methods for Business, by Anderson, Sweeney and Williams Read sections 16.1, 16.2, 16.3, 16.4, and Appendix 16.1.
Introduction to Computer Programming - Project 2 Intro to Digital Technology.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
CSE 481b Winter Today  Writing Assignment Update  Final Reflective Statement  Due March 14  750 words  Final Project Presentations  Delivering.
SOFTWARE PROJECT MANAGEMENT
INFO 638Lecture #91 Software Project Management Conclude Adaptive Project Framework INFO 638 Glenn Booker.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
3.1 Fundamentals of algorithms
Activity Planning.
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Creating robust project networks
Driving Successful Projects
Presentation transcript:

Advanced Scheduling Concepts Software can land an aircraft. Why can’t it plan a project? Shane Archibald, Managing Principal Archibald Associates & Spider Project USA SESSION FRI35

Advanced Scheduling Concepts In this session, we will  Review some significant advances in software and computing capabilities… and how they came about  Review what we think we know about scheduling… and maybe learn otherwise  Shift our way of thinking and take a giant step forward  Review some interesting and unique functionality in a very special Scheduling tool

The Evolution of Computers

Computers have never been good at finding answers to complex questions  The very best can only comprehend and answer simple, straightforward questions but still get them wrong nearly one third of the time  Search engines don’t answer a question–they deliver thousands of search results that match keywords  Are we satisfied? If so, then Why?

IBM’s R&D Challenge The grand challenge driving IBM’s project was to win on the game show Jeopardy! The broader goal was to create a new generation of technology that could find answers in unstructured data

IBM’s Answer Watson

A Significant Step in Computing Evolution – IBM’s Watson Fed mountains of information, including text from  Commercial sources, such as the World Book Encyclopedia  Sources that allow open copying of their content, such as Wikipedia and books from Project Gutenberg

A Significant Step in Computing Evolution – IBM’s Watson Programed it to respond based on rank of findings Tested it in a mock game of Jeopardy! Failed miserably!

A Significant Step in Computing Evolution – IBM’s Watson

Watson They tried Again. And again. And failed each time. Asked themselves how people learn and improve The Paradigm Shift

February 2011 – Success!!

Watson – Early Lessons Learned Why was the Team successful?  Didn’t settle for existing “reality”  Stopped doing the same thing, expecting different results  Team asked themselves what the difference was between people and Watson  Understood a minor change in approach can lead to a significant change in outcome What does all this have to do with Scheduling?

IBM’s Watson – Relevant to Scheduling? Traditional CPM Software  Uses a single predefined formula; no heuristics  Uses heavy human intervention; no automated adjustments or changes  Results require significant analysis, validation & manual adjustments; “I’ll take it from there…”  Process is cumbersome, inefficient and inaccurate

Cumbersome Process?

Collect information and estimates (duration, effort, resource, cost, risk, etc.) Enter into scheduling system, calculate, validate; plan and schedule produced! Work Update for progress, recalculate, validate Analyze results and identify issues Meet with team to mitigate issues; make decisions and new plans Enter decisions / changes to schedule, recalculate, validate Repeat …For the life of the project!

Cumbersome Process? What if we are talking about aircraft autopilot? Collect information Enter into system Fly (for a second) Update information for flight progress, recalculate forecast, validate Analyze results and identify issues Meet with team to mitigate issues; make decisions and new plans Enter decisions / changes to flight controls, recalculate, validate Repeat …For the life of the flight!

What if we are talking about aircraft autopilot?

Software Can Land an Aircraft! But it needs the variables, rules, and algorithms to do so

The Mechanics

The Variables Internal variables  Elevator (Pitch)  Rudder (Yaw)  Aileron (Roll)  Flaps (Lift)  Ground & Air speed  Thrust  Gross weight  Drag / Friction External variables  Wind speed  Wind direction  Air pressure  Weather  Altitude  Destination (location, altitude, etc.)  Other aircraft  Other changes

The Rules Gross weight –– Air Speed Air speed –– Flaps Pitch –– Thrust Drag –– Thrust Etc…

The Algorithm If  Air Speed < X and Flaps < Y Then  Increase Thrust until Air Speed => X  OR  Lower Flaps until Flaps => Y  Or… Immediately measure again and repeat

The Results FAST response times ACCURATE adjustments REDUCED workload

Software Can Land an Aircraft! If a computer can land a 450 ton aircraft full of human life with zero intervention, then why can’t it correctly re-sequence a few thousand activities and resources? IT CAN! But it needs the variables, rules, and algorithms to do so

The Challenge How do we develop a “Self-Correcting” Schedule?

Re-pave Roadway A Sample Exercise: Re-pave Roadway

Existing “Reality” Standard Schedule Input for an Activity  Duration  Logic  Resources  Cost  Baseline  *Timeframe (Calendar window)

Existing “Reality” What are we trying to represent?  Duration – Amount of work (and resource capacity)  Logic – Relationship to other work  Resources – People, Equipment & Materials used to complete that work  Cost – Cost of the work (and overall Spending Plan)  Baseline – Target of the work; success criteria  *Timeframe (Calendar window) – When the work will take place

Existing “Reality” What are the maintenance requirements?  Duration – Amount of work (and resource capacity)  Logic – Relationship to other work  Resources – People, Equipment & Materials used to complete that work  Cost – Cost of the work (and overall Spending Plan)  Baseline – Target of the work; success criteria  *Timeframe (Calendar window) – When the work will take place

Existing “Reality”

A Sample Exercise Are there opportunities for improvement?? Absolutely!

Remember the IBM R&D Team?

Shifting The Paradigm Didn’t settle for existing “reality” Stopped doing the same thing, expecting different results Asked themselves what the difference was between human-decision and software-output processes Understood that a minor change in approach could lead to a significant change in outcome

Let’s Think About This… What are the Variables?  What information do we, as a team and in a meeting, use when determining the best current plan or solution? What are the Rules?  How do we, as a team, chose alternatives when tasked with changing our plan? What should the Heuristic algorithm target?  The target is determined by the user  The algorithm is proprietary

A Sample Exercise Internal & External Variables

Internal Variables those that are completely self-contained within the subject, are directly related and work together to achieve some result External Variables IMPACT the Internal Variables in some way, shape or form

Our Challenge… …Is to develop the Internal Variables and related Rules such that they react to impacts from External Variables without human intervention Assumption: The Schedule “Activity” is the basic building block of a Schedule and will be our focus

What are the Internal Variables of our Activity? Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work *Scope of Work* (volume)

What are the External Variables? Labor Availability Equipment Availability Availability of Supplies & Materials Space limitations True Predecessors Special Events Weather or Season Site Conditions Target or Baseline Management “preference”

How do we Automate Internal Variables… …So they self-correct when something changes?

Primary Foundational Building Block Volume is an attribute of each activity, representing the amount of work to be done

Let’s Start SLOW, From The Top and Automate our Internal Variables Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work

Imagine… What if we could wrap Rules around the activity, like…  You should delay the work until the last minute  You cannot pause the work; it must be fully completed in a single pass  If Site A has standing water, you must remove that water before digging the trench

We Will Have Automated… Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work

Imagine Complex Logic… What if Logic could be used to represent complex relationships to other work, like…  You MUST do the work IMMEDIATELY following completion of predecessor Y  You can start the work as soon as predecessor X is 30 yards down the road but you cannot pass 50-yards until predecessor X is 10 yards from completion  If Z happens, then we need to do B, C, & D before A

We Will Have Automated… Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work

Imagine that Resources… …had unique Productivity Values for that type of work

Then Hours Required… …would be the result of Volume of work divided by individual Resource Productivity Hours = Volume / Resource Productivity And Duration = Hours / Resource Workday

Then Hours & Duration… …Would be Self-Adjusting based on Resources Assigned But we would still need to manually assign them

We Will Have Automated… Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work

Imagine Resources… …With attributes describing their specialized Skill …That could be automatically assigned to activities based on Skill required

We Will Have Automated… Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work Are we there yet?

Imagine Resources With… Specific hourly and overhead Rates

And… Cost of the work was based on  Forecasted hours and true rates of automatically assigned “named” resources  Overhead costs were applied by hour or flat rate or quantity of material or use of equipment  Materials consumed by Equipment and was automatically applied

Then TOTAL Cost… …Would be automatically calculated based on the specific Resource that has been automatically assigned

We Will Have Automated… Unique characteristics Timeframe Effort (Hours) Duration Responsibility (Resources) Cost to Complete the Work

How Long…? How long do you think it will take companies to develop software that will let us use Variables?

Actually… It’s already here!

Spider Does! Spider allows Multi-Resources too  Connect your Named Resources (e.g. Bricklayer, Bricks, Masonry, and Mixer) to create a multi-resource and make just a single assignment for brick work Maybe you have multiple mixers and bricklayers…  Use Skills as part of your Multi-Resource to let Spider pick the best named resource for the assignment

Spider Does! Teams of Resources can be:  Assigned to activities so the activities will start only when the whole Team is available to work  …Or Resources can be described as “able to do the work” and the software would pick the “best” or available team to complete the work, make the assignment, calculate the costs, and consume the materials  Teams can consist of may different Resources, Equipment, Materials, Multi-Resources or Skills

Spider Does! Resource assignments can carry Rules such as…  “You MUST have at least 2 of this type of resource to start the task. You can have more resources but cannot exceed 5 at any given time during performance of the task due to space or other limitations” Spider will start the task when it can find two resources that are ready to perform and will ADD up to three additional resources if and when they become available, to complete the task faster

Spider Does! Spider supports TRUE Risk Management  Insert REAL Risk Events into your activity network  Attach Mitigation Plans to those Risk Events using conditional logic Built-in Monte Carlo will consider these events and mitigation plans when calculating probabilities of success for At Complete dates and costs

Spider Does! Baseline values…  Can be driven by confidence levels, which can be driven by MC statistical analysis  Can easily compare values, in your schedule, ON YOUR SCREEN (and NOT in a 2,394 page text file!)  Can be easily updated

Spider Does! Spider supports the 3-Senarios Method  Build Optimistic, Pessimistic, and Most Likely schedules- Spider will automatically maintain synchronization from a single update  Provide the Pessimistic version to the owner or Client  Provide the Most Likely version to the Project Manager  …But drive the Team towards the Optimistic version

Spider Does! Algorithms are based on Heuristics heu·ris·tic  4. Computers, Mathematics. pertaining to a trial-and-error method of problem solving used when an algorithmic approach is impractical. -dictionary.com

Spider Does! Schedule Optimization Spider is the ONLY Project Management software that optimizes resource, cost, and material constrained schedules and budgets for projects and portfolios

Spider Does! Monte Carlo & Schedule Optimization Spider is the ONLY Project Management software that properly runs Monte Carlo on Optimized Schedules

Spider Does! Spider will search through multiple combinations of variables to automatically assign the best Resource(s) to each activity, based on:  Type of Resource(s) needed  Availability of the Resource(s), when the work takes place (NOT when the project is initially planned)  Total Cost to complete the work, based on the cost and productivity of the Resources in the pool  Or on speed to complete the work, based purely on the productivity of the resources in the pool  …Based on your personal choice

Spider Does! With the push of a button you can run a heuristics-based algorithm that will search through various combinations of all those variables to find the optimal schedule to give us:  The shortest possible schedule?  The lowest possible Cost?  The greatest return on investment?  The quickest release of key Resources?  The most Payment Milestones by the end of the year? What is your priority? What will it be tomorrow?

Spider Does! …SO much more Visit SpiderProjectUSA.com

Conclusion Paradigm Shifts ARE possible  Don’t settle for existing “reality”  Stop doing the same thing, expecting different results  Ask yourselves what the difference is between human-decision and software- output processes  Understand that a minor change in approach can AND DOES lead to a significant change in outcome

Conclusion Project Schedules can self-adjust if given variables, rules, and heuristic algorithms instead of static values and simple equations Spider Project employs significantly advanced heuristic- based functions and algorithms to support Dynamic Variable Scheduling

Contact Shane Archibald, Managing Principal Archibald Associates & Spider Project USA