U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Evolution of the Williston Basin Drilling Pad ;. Drilling Pad What affects a drilling pad Types of pads in North Dakota Advances in pad construction.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Wind Energy Development Wildlife Issues and Concerns Wind and Prairie Task Force February 27, 2004 Edward A. Martinko State Biologist and Director Kansas.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
WATER CONSERVATION PRINCIPLES AND PRACTICES. Water conservation “ The conservation treatment meant to reduce or prevent sheet erosion while achieving.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Manure Storage During A Dairy Modernization Robert Wilson WI Department of Agriculture Trade and Consumer Protection Brian J. Holmes University of Wisconsin-Madison.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Humans Impacts on Land Objective 2.07
Vegetation Establishment. Exposed soil occurs on all construction sites.
Environmental Assessment August 2012 Oil & Gas Lease Sale.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Master Development Plans (MDPs) Oil and Gas Projects.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Jilin Provincial Transport Scientific Research Institute & PEECE Pty Ltd Environmental Management Plans Presented by Phil Hawley & Steve O’Rourke P E E.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Module 7: Construction Phase
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
Planning for the expansion of biomass production in the Midwest: Remaining wildlife neutral JoAnn Hanowski Natural Resources Research Institute University.
Environmental Issues Associated with Oil and Natural Gas Extraction, Transport and Processing in the Marcellus and Utica Shale Region of Ohio Joe Bonnell,
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Senior Geography Project
Implementing Conservation Measures to Reduce Impacts to Migratory Birds.
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Challenges and Opportunities for Increased Access to On-shore Federal Lands Natural Gas Technologies What’s New & What’s Next Orlando, FL January 30-February.
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
PIPELINE RECLAMATION REQUIREMENTS Interim reclamation: Achieve healthy biologically active topsoil, control erosion, and restore habitat. Final reclamation:
Soil Conservation. How do we use the land to change the land? Mining – rocks and minerals are removed from the ground for profit by one of two methods:
Impacts of Mining, Mining Regulations & Mine Reclamation.
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
BOARD OF OIL, GAS, AND MINING DEPARTMENT OF NATURAL RESOURCES STATE OF UTAH BEFORE THE BOARD: RECLAMATION OF SURFACE DISTURBANCE DIVERSIFIED STONE PRODUCTS.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
TRENCHING & EXCAVATION
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Excavation & Trench Safety
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
How Disturbance Impacts Wildlife
Objectives Upon completion of this module you should be able to:
NORTH TRUNK SEWER REPLACEMENT PROJECT
Construction Management & Inspection
Tree Harvesting By Mr. Kennedy.
Roots and Planting Trees
CONSTRUCTION METHODS & TECHNOLOGY
Latin America and Caribbean Region
Vehicle & Equipment Maintenance/Cleaning
Presentation transcript:

U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006

BMPs Minimize Wildlife Habitat Fragmentation and Loss Typical BMPs May Include: Reducing the Size of Roads, Utilities, & Well Pads Drilling Multiple Wells from a Single Well Pad Eliminating Hazards to Wildlife Reducing Noise Centralizing Production Facilities Remote Production Monitoring

Interim Reclamation Short-term reclamation that occurs as the well is beginning initial production of oil and/or gas. Includes partially reshaping and revegetating roads, and well pads to reduce the amount of bare ground created during construction and drilling activity. To minimize habitat loss and fragmentation, re-establish as much habitat as possible by maximizing the area reclaimed during well production operations. In many cases, this “interim” reclamation can cover nearly the entire site. Why Stop at 1.3 Acres? Reduce the producing well pad in size as much as possible to maximize habitat restoration. Pink = Recontoured and seeded

Interim Reclamation - A Paradigm Shift It is OK to set up well workover operations on, or park on, the restored wellsite or roadside vegetation. Limit activities to only the area that is necessary. To avoid fires, consider mowing the vegetation where you will park. Repair the damage and revegetate when you are done. Question: “But aren’t you are damaging the new vegetation?!?” Answer: Yes, but it is temporary and minor damage. Keep in mind, the operator has the right to develop the lease and maintain production operations within reasonable constraints. Future well maintenance operations use far less land surface area than do the original drilling operations. And Consider this: What causes less loss of habitat: A one or two acre well pad left barren for 40 years of oil or gas production, or Revegetating the entire well location, knowing that a small portion of it will sustain vehicle traffic and temporary vegetation damage during future production and maintenance operations? Parking on the vegetation. (It will green-up next spring.)

If the disturbed areas are covered with topsoil and seeded with appropriate amounts and varieties of native species, over time, local natives will typically reestablish themselves on the site, helping to restore proper species composition and structure. Steps: 1. Fully recontour unneeded areas to the original contour or a contour that blends with the surrounding topography; 2. Respread topsoil over entire pad; 3. Revegetate to reestablish habitat. Area of Formerly Barren Well Pad  Well Box Interim Reclamation  Well Box Interim reclamation should begin shortly after construction or establishing oil or gas production on the site.

Interim Reclamation – Good and Bad Examples Good… Vegetation Reestablishing on Pad. Concentrate facilities near center to maximize area for interim reclamation. Not so Good… Bare Ground. Long-term Loss of Habitat And Forage Unrevegetated Bare Ground Seeded and Growing Seed with the proper species, varieties, and amounts of seed. The use of native species is preferred. Consider adding shrubs and forbs to the seed mixture, where appropriate, to reestablish habitat.

Interim Reclamation of Roads The Standard Road: Ditches erode each time it rains. Annual maintenance including blading and weed control is required. With Interim Reclamation: Borrow ditches covered with topsoil and seeded. Consider seeding the road surface for low use roads. Forage and habitat is partially restored. (Along high speed or high traffic roads, avoid planting species that will attract wildlife.)  

Respread Topsoil On All Road Cut and Fill Slopes and Revegetate to Ensure Slope Stability, Erosion Control, Restoration of Forage & Habitat, Maintenance of Visual Resources, and Topsoil Viability. Interim Reclamation of Roads

Submersible Pump Two-track road with buried power and flowlines in the road. In some cases, low volume, two-track roads may be the suitable choice and create the least fragmentation of habitat.  In the BLM 9113 Manual, it states: Bureau roads must be designed to an appropriate standard no higher than necessary to accommodate their intended functions… Minimize Roads Consider: Average daily traffic (ADT) load, vehicle size, soils, topography, weather, season of use, safety, etc...

Emerging Practices Under Study To Reduce Reclamation Costs & Speed Recovery Mats Removed – Wet Site 1Year Ago / This Year Mats Removed – Dry Site With Mat / No Mat Recovery Rates Use of Oak Mats for Pads and Roads

Drilling Multiple Wells On An Individual Well Pad Consider drilling multiple wells from a single well pad to reduce the footprint of oil and gas activity on wildlife habitat. Photo of 16 Wells on 1 Well Pad… The result: Construction of 15 fewer well pads, 15 fewer roads, 15 fewer power lines, and less maintenance. Directional drilling costs are typically greater than drilling straight holes. However, in the example shown on this slide, in steep country, the total cost of directionally drilling 16 wells from one pad may cost the same or less than constructing and drilling at 16 separate well pad locations. The feasibility of directional drilling is dependent on the subsurface geology and the depth of the hole. Flex Rig

Drilling Multiple Wells on an Individual Well Pad Six wells were drilled from this well pad. Centralizing wells allows the operator to avoid drilling and maintaining wells near sensitive resources and maintains large areas of uninterrupted habitat, thereby, reducing habitat fragmentation. Directionally drilled wells require larger well pads, but with interim reclamation, pad size can be reduced significantly.

Centralized Tank Batteries Run flow lines (oil, gas, water, condensate) to centralized tank batteries placed offsite, away from sensitive resources and habitat. The Result: Year-round truck traffic to each individual well is significantly reduced. Therefore, you may be able to use lower standard roads which result in less loss of habitat. There is less disturbance to wildlife because large haul trucks are not running to each well location during critical wildlife time periods. Example of a centralized tank battery.

Remote Monitoring Remote telemetry of wells and related production equipment can reduce the number of maintenance and inspection trips made during critical time periods for wildlife and result in less wildlife disturbance.  Antenna Natural gas compressor with electronic monitoring.

Line Placement – Reduce Fragmentation of Habitat Bury power, flow, and pipe lines in or adjacent to the road to eliminate cross- country vegetation clearing and resulting habitat fragmentation. The utility corridor on the right not only fragments habitat, but also reduces the scenic quality. 

Burying Lines & Utilities Plowing and pulling pipes and lines into the ground in certain soil types will disturb much less ground and vegetation than excavating and trenching. Plow mark  Standard Method

Utilities – Protect Wildlife In important sage-grouse habitat and prairie dog towns, discourage raptor perching by using anti-perching devices. Raptors perching on power poles can be electrocuted. Perches also provide easier hunting for raptors that prey on BLM sensitive species, such as sage-grouse. This is a device to prevent raptor perching. For additional information, refer to: “Suggested Practices for Raptor Protection on Power Lines: The State of the Art in 1996” nd_access/suggested_pract.htm

Minimize Noise Noise can deter wildlife from using an area. Use noise reduction mufflers to comply with noise standards. Also, consider using earthen berms, walls, sheds, and/or distance to reduce sound levels in important habitats. 4-Side, Open Compressor Building 4-Side, Closed Compressor Building Photo courtesy of: Acoustical Control Inc.

Development Planning Planned Development can reduce unnecessary disturbance by reducing unnecessary roads in important habitat. A Field Development Plan should address sensitive area avoidance or mitigation, potential road, utility, and well locations, road classes, plans for interim and final reclamation. None of the road shortcuts are necessary. Plan the main road system prior to development. (Photo Simulation)

In important wildlife areas and during critical wildlife use periods consider: -Seasonal restriction of public vehicular access in new development areas such as dead-end, well access roads or designated portions of the field. -Operator enforced speed limits during critical seasons. -Using shuttle vans and buses to transport drilling rig workers and field service personnel. Reduce Vehicle Traffic Frequent vehicular use… creates dust which degrades habitat, produces noise which disturbs wildlife, causes direct mortality from collisions, and requires higher class roads to accommodate increased traffic.

Cover all “production” related pits and tanks to exclude wildlife, regardless of pit or tank size. Migratory birds can drown in small volumes of water and other fluids. Violations of the Migratory Bird Treaty Act can result in substantial penalties. Wildlife Exclosures Tanks with wildlife exclosure covers. Searching for dead birds in an open tank. Unfortunate Results:

BMPs Must Be Correctly Designed, Monitored, and Maintained In this photo, there is oil in the pit and the net is down. It is not enough to use BMPs, they must also be properly designed, constructed, and maintained to ensure they are functioning properly. Constant monitoring, inspection, and enforcement are required to ensure BMPs remain necessary and effective. This net was placed above the pit to prevent migratory waterfowl from landing in the pit in the unlikely event oil was accidentally discharged into the pit. (Oil is not permitted in pits.) The net has fallen down due to its poor design, construction, and a lack of maintenance and is no longer effective at preventing wildlife access.

Potential habitat mitigation area Productive Energy Area Off-Site Habitat Mitigation In some cases, the cumulative impacts of development to wildlife habitat may necessitate taking actions to enhance local or off-site habitat. Habitat mitigation helps to reduce the impacts of habitat loss or fragmentation until full, final reclamation at the end of the oil and gas field life. Photo of an energy production area and an area of wildlife habitat that could be improved to compensate for energy development.

Wildlife Monitoring Each colored dot represents one deer with a GPS collar that records three times per day.  The blue dots represent the locations of a tagged mule deer around a winter drilling operation. Monitoring deer populations during winter drilling operations. Photo overlay is a summertime photo. Monitoring wildlife populations is critical to confirming that our mitigation is necessary and effective. It also provides the justification for taking new actions or avoiding unproductive actions.

Final Reclamation Final reclamation begins when well production ends. Ensure the site is recontoured, stable, and fully revegetated. If reclamation is done correctly, over time, the habitat will restore itself. Remember, oil and gas development is not a permanent use of the land. Area of Reclaimed Well Location This reclaimed well pad has been recontoured (reshaped) to the pre-drilling contour, revegetated with native species, and over time will blend with the surrounding seamless landscape.

Final Reclamation Monitoring Questions to ask: Is the site stable from wind and water erosion? Has the native plant community reestablished itself over time? Has habitat been restored to proper species composition, size, and structure?  Dryhole Marker In this photo, the native plant community is slowly reestablishing itself on the reclaimed well pad. The dryhole marker indicates the old well location. (Avoid the use of surface dryhole markers that can serve as raptor perches.)

In Summary: Minimize the Footprint of Energy Development To reduce wildlife habitat fragmentation, loss, and degradation, consider: lower class roads smaller pads interim reclamation of roads and well pads

Hawk nest   Hawk nest Rabbit  Deer on Well Pad