1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch.

Slides:



Advertisements
Similar presentations
1 Introducing the Specifications of the Metro Ethernet Forum.
Advertisements

1 Review Notes concerning Review Notes concerning Forward Frame Service & Process Data Operation/Procedure
Monitored Data CSTS, CCSDS W April 2013 Bordeaux, France John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
Monitored Data CSTS, CCSDS W October 2013 San Antonio, Texas, USA John Pietras Global Science and Technology, Inc., Greenbelt, MD, USA.
Slide: 1 The Implementation of Ada 2005 Synchronized Interfaces in the GNAT Compiler Javier Miranda Hristian Kirtchev Edmond Schonberg Presentation cover.
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
1 June 2010 Cross Support Transfer Services (CSTS) Overview.
The Web Warrior Guide to Web Design Technologies
Buffered Data Processing Procedure Version of Comments MG / CCSDS Fall Meeting 2012 Recap on Previous Discussions Queue overflow processing.
1 Data Concurrency David Konopnicki 1997 Revised by Mordo Shalom 2004.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Service Layer Session Management Group Name: WG2-ARC Source: IDCC, LGE, ZTE Meeting Date: TP16 Agenda Item:
TERM PROJECT The Project usually consists of the following: Title
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Module 8: Server Management. Overview Server-level and instance-level resources such as memory and processes Database-level resources such as logical.
Publishing a Macromedia Flash Movie – Lesson 131 Publishing a Macromedia Flash Movie Lesson 13.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
1 CSTS WG CSTS WG Prototyping for Forward CSTS Performance Boulder November 2011 Martin Karch.
Status and way forward with Publishing DICOM in XML Cor Loef Chair ad hoc group on Publishing DICOM in XML.
OpenEMR: Using the Calendar Based on OpenEMR 4.1 Laboratory Informatics Institute January 2014.
Cross Support Services Area Cross Support Transfer Services Working Group Strawman Forward Frame CSTS Specification Technical Note (June 2010) John Pietras.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Yang Shi (Richard), Yong Zhang IETF 74 th 26 March 2009, San Francisco CAPWAP WG MIB Drafts Report.
1 W.Hell (ESA) November 2014 SLE Pink Books SLE Pink Books Summary of the Updates November 2014.
Control Groups Workshop State of Indiana Instructor: Gerri Williams 2/6/2013.
Cross Support Services Area Cross Support Transfer Service Working Group Monitored Data Cross Support Transfer Service: Scope and Format of Monitored Data.
BLISS Problem Statement Jonathan Rosenberg Cisco.
DTS & CSTS REPORT 15 April 2005 Athens, Greece CSTS - 1 DTS & CSTS WG STATUS REPORT, End of Spring 2005 Meeting Yves Doat Chairman 15 April 2005.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Comments from Simplified PROCESS-DATA Exercise John Pietras CSTSWG Berlin May, 2011.
2 Objectives You should be able to describe: Object-Based Programming Classes Constructors Examples Common Programming Errors.
Tracking Data CSTS v March - 3 April 2014 Noordwijkerhout, Netherlands John Pietras Global Science and Technology, Inc, Greenbelt, MD, USA.
1 W.Hell (ESA) March 2015 Service Specification Framework Service Specification Framework Changes since Red-2 March 2015.
1 W.Hell (ESA) March / April 2014 CSTS Specification Framework CSTS Specification Framework Changes since San Antonio March / April 2013.
Cross Support Transfer Services - Tracking Data Service 0.10 (in progress) March 2015 London, United Kingdom John Pietras Global Science and Technology,
1 Y.Doat (ESA) March 2015 Guidelines Status Guidelines Status CSTS Framework March 2015.
Section 3.2 Solving Equations using Multiplication and Division.
Alarm Handling Oliver Holme 7 th November Guidelines & Strategies All provide recommendation to use Framework Classes Standard severities/behaviour/colours.
CSTS Generic Procedures Assessment of the Current Status and Proposal for Next Steps M.Goetzelmann
Update of SAM Implementation ALICE TF Meeting 18/10/07.
ATML Test Description Orlando, FL January ATML Test Description2 September 2006 Agenda Status Feedback from Candidate evaluation Review standard.
Functional Resources in Service Management and Service Package Execution CSSA Cleveland, Ohio October 2012 John Pietras GST, Inc.
Data Processing Procedures CSTS Teleconference M. Götzelmann.
Object-Oriented Application Development Using VB.NET 1 Chapter 11 Using Multiple Forms with Problem Domain Classes.
MD CSTS prototype status 2012 : MD user (NASA) based on NASA Fw development MD provider (CNES) based on ESA Fw development NASA/ESA Fw interoperability.
Draft-ietf-pce-stateful-pce-07 draft-crabbe-pce-pce-initated-lsp-03 Stateful PCE - update Ina Minei Ed Crabbe Jan Medved Robert Varga Siva Sivabalan.
Computer Science: A Structured Programming Approach Using C1 Objectives ❏ To understand the basic properties and characteristics of external files ❏ To.
1 Y.Doat (ESA) April 2012 Object Identifiers Object Identifiers CSTS Framework Annex C April 2012.
9 Copyright © 2011, Oracle and/or its affiliates. All rights reserved. Scheduling and Bursting Reports.
Object-Oriented Application Development Using VB.NET 1 Chapter 15 Assembling a Three-Tier Windows Application.
Powerpoint Templates Page 1 Powerpoint Templates Unit Testing Ari Seppi
1 Transfer Service Specification Issues CCSDS September 2005 Meeting Atlanta.
Education Service Center, Region 20 | FOR-C
Chapter 7 Text Input/Output Objectives
Chapter 7 Text Input/Output Objectives
ESAW Workshop 2009 Martin Götzelmann, VEGA Yves Doat, ESA/ESOC
Multiplication table. x
Chapter 7 Text Input/Output Objectives
Delegates and Events 14: Delegates and Events
Service Specification Framework
DG Environment, Unit D.2 Marine Environment and Water Industry
Assembler Design Options
IEEE R Comment Resolution
To the ETS – PNG Continuation: Online Training Course
Example of A* A (4,0) 4 OPEN: (A4) CLOSED: ().
System Problem Resolution Practices
Working together Marc Thauront Brussels 28 January 2009.
Expand Brackets Low C C B
Guide: Certify results Version of Ladok by the latest update:
Item 9 Validation in UOE data collection
Presentation transcript:

1 May 2011 CSTS WG: CSTS WG: CSTS Specifications Framework RID Status Summary R1 Boulder 31 Oct 2011 Martin Karch

2 May 2011 RID Status ( )

3 May 2011 RIDs Implemented RID-IDTitleCommentAgreedStatus FF-02three-phase operation Annex E delivered (JVP) YImplemented TJR-13PDU ValidationYImplemented TJR-07 Easy-to-interpret diagnostic information YImplemented JVP-41 Data Processing procedure does not define Abort behaviour YImplemented JVP-03 Remove non-managed parameters from Annex H YImplemented JVP-76ASN.1 DirectiveQualifier Directive Id -> Published Identifier YImplemented JVP-78 multiple instances of BDD procedure YImplemented JVP-80 Additional changes in PROCESS-DATA operation YImplemented FMB-12BDD Procedure issues Figures deliveredto be checked Implemented

4 May 2011 RIDs Implemented RID-IDTitleCommentAgreedStatus JVP-81 ABORT and TERMINATION handling JVP to check if ‘TERMINATING’ issues already covered by TR- 13 YImplemented JVP-82 Typographical errors in Notification Proc. YImplemented JVP-83Terminology incorrectYImplemented JVP-84 Duration Type specification YImplemented TJR-19 Navigating our ASN.1 definitions to be checked Implemented YD-01 Requirements for Operation External types YImplemented YD-02Peer-Abort Diagnostic to be checked Implemented JVP-22 Expand Cyclic Report procedure Concepts JVP: “PublishedNames Concepts Sections docx.doc to be checked Implemented JVP-85Additional PD comments Based on JVPs presentation "AddtionalPROCESS- DATA_comments.ppt“ in Berlin (20.05) to be checked Largely Implemented Pages 11, 12, and 13: Not yet processed.

5 May 2011 RIDs To Be Processed RID-IDTitleProcessedAgreedImplem. JVP-47 Data Processing procedure too specific to Telecommand type of operation Berlin: low priority for forward procedures JVP-46 Ambiguous Resetting behavior Berlin: Depends on JVP-47 MG-01 Clear buffer consistency Berlin: To be processed together with JVP-47 TJR-20 User Side State Tables for CSTS FW To be discussed during Boulder meeting