AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.

Slides:



Advertisements
Similar presentations
SAGD ELift Applications
Advertisements

ADX 150 – Engine Repair ADX 170 – Climate Controls
Mate Grinder MATE European Dealer Meeting Advantages of Automatic Controlled Punch and Die Grinding More regrinds, accurate material removal Protect.
Winter 2015 ECEn 490 Lecture 10 Prototyping 1 Prototyping and Design Standards.
P15503 Electrophotographic Cascade Test Rig System Level Design Review Dalton MeadBridget Kearney Mike WarrenRuishi Shen Tom WossnerZack Foggetti.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Intuitive Design Inc. New Product Development Progress March 25, 2006 Prepared for: Company Management Team Dave Leis.
Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Expect More. World’s leader in pressure technology NA Sales Training Rev B – 10/10/13.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew.
Pearson Education Ltd. MindStudio
Rational Unified Process
MSD-I Project Review Modular Motion Tracking Sensors 1.
CS CS 5150 Software Engineering Lecture 5 by Stephen Purpura Matching Process to Risk.
Conceptual Design.
Health Informatics Series
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: Feb 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
¾-1/2” Red. Union 3/8”OD ACSM Inlet Configuration 0.1 lpm to ACSM with PM 1 passing thru aerodynamic lens 2.9 lpm to external Pump* Sheath Flow 6 lpm dry.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System.
AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System P
TEAM: JEFF PHILIPPART, TEAM MEMBER NAMES REMOVED WHIRLPOOL CAPSTONE STEAM GENERATION PROJECT.
Microsoft ® Office Project Portfolio Server 2007.
1 Portfolio Simulation / Forecasting: Selecting improvement initiatives to maximize “points of leverage“ May 1, 2006 Alan Poirier Director, Analysis Metrics.
S/W Project Management
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
Systems Level Design Review P15010: Arc Wheelchair Swing Maggie Bates, Sean Kennelly, Owen Breese, Elizabeth Cutolo.
Agenda Project Background Updated Requirements Chamber design
Austin Frazer Eileen Kobal Ana Maria Maldonado Marie Rohrbaugh Moog Gas Evacuation Systems Design Review.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro P13411.
Why Listings ‘Expire’. Price – Without proper pricing, a property will take a longer time to achieve a sale and will yield substantially less dollars.
ASSISTED VENOUS DRAINAGE
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
High Temperature Waste Pasteurizer Brian Kilger Kyle Cohn Kyle Weston Stephanie Mauro Parabolic curve P13411.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Status of the Advanced LIGO PSL development LSC meeting, Baton Rouge March 2007 G Z Benno Willke for the PSL team.
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
P16081: SYSTEMIC CIRCULATION MODEL Jacob Zaremski – Lead Engineer Mallory Lennon – Project Manager John Ray – Communications Manager Fabian Perez – Purchasing.
1. 2 Quiz Preparation l Have Quiz sheet ready. l Top Center: QUIZ 2 l Upper Right: »Name (L, F, MI), »Today’s date 8/28/12 »Lab day, time »section number.
MSD Total Supplier Performance and Inventory Control
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Tata McGraw CHAPTER 4 Product and Service Design.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
Motor Assisted Wheelchair Design Review 10/01/15.
DESIGN OF PRODUCTS AND SERVICES Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
RuggedPOD Proto 1 bugs SDS team Wolfe Engineering.
R. I. T Mechanical Engineering Design Concepts and Selection Design Project Management Rochester Institute of Technology Mechanical Engineering Department.
SportsNet - Contingency Plan
P15051: Robotic Eye System Design Review
Tandem Bike Storage Proposal
ProLine & ProLine+.
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Bonneville Power Administration Aerial Line Cart Progress Report
P17452 Dresser-Rand System Health Monitor System Level Design Review
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Presentation transcript:

AAT Injector Nozzle Test Chamber P15681 Calibration Fluid Exhaust System Zach Huston, Hayden Cummings, Adam Farnung, Tim Nichols, Robert Moshier, Andrew Heuser

Agenda Updated Requirements Concept Generation Concept Selection Plan for Sub-System Design Phase Action Items

Customer Requirements

Engineering Requirements

House of Quality

Functional Decomposition

System Architecture

Benchmarking No longer Feasible Potentially Feasible Feasible Option

Market Comparison Centrifugal vs. Blow/Pull Through Mist Collectors

Morphological Analysis

Pugh Matrix

Functional Pugh Chart Gloves in chamber best meet containment criteria Angle test requires additional analysis Laser can be eliminated from concept

Functional Pugh Chart Sub-basin best meets Liquid Drainage criteria LED light bar best meets Visibility criteria

Concept Generation Wanted to focus on Reducing the mist in the chamber Increasing the drainage rate Reduce operators fluid contact time

Initial Concepts – Reducing Mist Initial ideas were scrapped due to Time it could take to purge chamber fully The ability to capture all of the atomized fluid Internal components being in the way All components moving in unison

Increasing Drain Rate Key Features ●“False” or “Drop” floor ●Slots to allow for better drainage ●Angled basin to prevent pooling ●Angled to allow better drainage Things to keep in mind ●With more openings in the base - Weaker structurally using current material

Reducing Contact Time Key Features ●Sealed interlock - no direct contact with inside of chamber ●Glove holes for attached gloves ●Both testing done in 1 location ●Pump system only on interlock - can open inner door to have suction during testing Things to keep in mind ●Ergonomics of using the gloves - can they reach everything ●Ease of attaching nozzle to test fixture through gloves

Additional Ideas ●Improved lighting (LED) ●Contrast backdrop - easier visibility of angles ●Camera with defined allowable angles for spray

Concept Selection Key Features ●Interlock - top loaded ●Pump on interlock ●Bottom interlock door - opened for testing ●Glove hole for access to inside of chamber ●False floor - for increased drainage ●Angled basin - eliminates the pooling of liquid ●Camera with back drop and LED lighting Challenges ●Incorporating all fluid lines into the airlock ●Allowing enough slack to remove testing block for set up of the nozzle

Risk Assessment

Cycle Time Analysis

Feasibility Analysis Robert - Test Location Zach - Ergonomics Hayden - Test Visibility Tim - Purge Vacuum Adam - Purge Time Andrew - Make vs. Buy

Feasibility Analysis: Test Location Designing to a single location for all testing Looking at potential impact of changing flow test location Looking at potential new fixture designs to allow both tests Incorporating nozzle block off into angle test block

Feasibility Analysis – Ergonomics Current layout outside spectrum of acceptable work height New system height determined as a function of the link length proportion mannequin Assume operator performing light work

Feasibility Analysis: Ergonomics

Feasibility Analysis: Test Visibility Picture – with no vacuum, chamber becomes clouded and hard to see into Need to look at the maximum vacuum we can pull during testing Want to be able to maximize the visibility in the chamber Testing to be done (Trial and Error) to find the optimal vacuum needed Testing will answer the question if we want to pursue alternate ideas to increase visibility

Feasibility Analysis: Time vs. Chamber Size Need to address the time it could take to fully pump out a chamber of all air and fluid Need to be conscious of cycle time

Feasibility Analysis: Vacuum Feasibility

Feasibility Analysis: Make vs. Buy Address the issues of purchasing an item versus making it Need to evaluate specs of a purchased item versus specs of an item we can make Evaluate the need to meet specifications for given products Determine if the item will be bought or made

Project Schedule

Plan for Testing Baseline Test Procedure (“Control Group”) -Acquire test chamber from AAT -Acquire cal fluid (possibly used from their tests) -Acquire reject nozzle from AAT -Purchase pump -Find an adequate test location -Prepare testing setup including fluid reservoir, fluid pump, hoses,power supply, nozzle, and chamber. -Run Test for Original System: 1.Connect nozzle 2.Close and seal system (including upper cover) 3.Pump cal fluid through nozzle, into chamber 4.End test 5.Open front doors and (disconnect) remove nozzle 6.Take air ppm measurements

Plan for Testing Prototype Testing Procedure (Treatment Group) -Build our new test chamber -Find alternate testing location to avoid cross-contamination from “Control Group” -Prepare testing setup including fluid reservoir, fluid pump, hoses,power supply, nozzle, and new chamber. -Run Test for Prototype System: 1)Connect nozzle and mount inside of air lock 2)Close air lock 3)Through glove, open inner door of airlock 4)Pump cal fluid through nozzle, into chamber 5)End test 6)Through glove, close inner airlock door 7)Purge airlock 8)Open outer airlock door and (disconnect) remove nozzle 9)Take air ppm measurements

Action Items Get system level design approved Team 10/1/14