Bridge Related Research at the University of Surrey An Overview by Prof Gerry Parke UniS.

Slides:



Advertisements
Similar presentations
Rejuvenating Aging Port Infrastructure ADVANCED PREDICTIVE MODELLING PROACTIVE APPROACH TO ASSET MANAGEMENT PROJECTS (supported by Australian Research.
Advertisements

CONREPNET A project 50% funded by the EU Partners: BRE, UK Gifford, UK CT Koulutos, Finland Freyssinet, France BBRI, Belgium IETcc, Spain STU-K, Czech.
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
Division of Operation and Maintenance Engineering Wear prediction of grinding mill liners Farzaneh Ahmadzadeh, Jan Lundberg
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
Nottingham Centre for Infrastructure Bridge Engineering Research Dr John S Owen.
CE REPAIRS AND REHABILITATION OF STRUCTURES
Slide 1 © CSIR Etienne K.Ngoy, I. Campbell, R. Paskaramoorthy School of Mechanical, Industrial, and Aeronautical Engineering University.
1 NDT OF CONCRETE. 2 CUBE TEST INDICATES ONLY POTENTIAL STRENGTH INDICATES ONLY POTENTIAL STRENGTH SUBJECT TO UNINTENTIONAL DEVIATIONS SUBJECT TO UNINTENTIONAL.
Bridge-related research at the University of Bristol John H.G. Macdonald.
How long will your concrete bridge last?
CONDITION APPRAISAL AND REMEDIAL TREATMENT CIRIA Research Project RP692 MASONRY AND BRICK ARCH BRIDGES:
Design of Connections by Toby Mottram
Increased load capacity of arch bridge using slab reinforced concrete T.G. Hughes & M. Miri Cardiff School of Engineering Arch 04, Barcelona, Nov ,
A new assessment method for masonry arch bridges (SMART) Clive Melbourne, Adrienn Tomor School of Computing, Science and Engineering, University of.
PROJECTS WITH POTENTIAL FUNDING
CONCRETE PROTECTION MATERIALS & TECHNIQUES CE 402 DONE BY AHMED AL-HAWAS FAYEZ AL-SAIKHAN.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
The nature of concrete can be determined through petrographic examinination.
Office of Research and Engineering Finite Element Analysis Carl R. Schultheisz.
REPAIR MANUAL Dr. Mohammed Maslehuddin Research Institute
Office of Highway Safety Bridge Inspections Dan Walsh.
Teacher: Mark Casto Lab Assignment: Progressive Collapse of RC Structures Principal Investigator: Mehrdad Sasani.
PROBABILISTIC MODELLING OF CONCRETE STRUCTURES DEGRADATION B. Teplý, P. Rovnaníková, P. Rovnaník, D. Vořechovská Brno University of Technology, Czech Republic.
Probabilistic Assessment of Corrosion Risk due to Concrete Carbonation Frédéric Duprat Alain Sellier Materials and Durability.
Cluster “LIFETIME” Cluster “LIFETIME” projects: LIFECON (Coordinator VTT, Finland) EUROLIFEFORM (Coordinator Taylor Woodrow, United Kingdom) INVESTIMMO.
Advanced Polymer Composites in the Civil Infrastructure
Composite Materials Dr. Jing LI
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
INSPECTION OF PRESTRESSED CONCRETE ROAD BRIDGES BY ULTRASOUND 3D TOMOGRAPHER SYSTEM Eng. Guy Rapaport Infrastructure & Transport, Finland.
Reliability Analysis Procedures for Infrastructure Facilities Andrzej S. Nowak University of Nebraska - Lincoln Outline  Causes of Uncertainty  Load.
École Polytechnique Fédérale de Lausanne (EPFL),
CRESCENDO Full virtuality in design and product development within the extended enterprise Naples, 28 Nov
GOLD Guaranteed Operation and Low DMC SEAMLESS AIRCRAFT HEALTH MANAGEMENT FOR A PERMANENT SERVICEABLE FLEET Birmingham (UK) December 05, 2007.
Pavement Preservation Preventive Maintenance
REPAIRS AND REHABILITATION OF STRUCTURES UNIT – II
Application of the Direct Optimized Probabilistic Calculation Martin Krejsa Department of Structural Mechanics Faculty of Civil Engineering VSB - Technical.
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
Msc. eng. Magdalena German Faculty of Civil Engineering Cracow University of Technology Budapest, Simulation of damage due to corrosion in RC.
Hoan Bridge Failure Analysis Hoan Bridge Failure Analysis Wisconsin Department of Transportation City of Milwaukee, WI December 13, 2001 City of Milwaukee,
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
I. M. DMYTRAKH and V. V. PANASYUK Karpenko Physico-Mechanical Institute, National Academy of Sciences of Ukraine 5 Naukova Street, Lviv, 79601, UKRAINE.
Probabilistic Design Systems (PDS) Chapter Seven.
Nanometers? Tiny sensors embedded in concrete will collect physical and chemical data Presented By: Ghada Mohamed Abd ElFattah By: Deborah Snoonian, P.E.
Sensor Technology for Non Destructive Assessment of Corrosion in Structural Steels J. Ernesto Indacochea & Ming L. Wang, Civil & Materials Engineering.
NDE in Industry. Why do NDE? Integrity Management Safety – input into safety cases Life prediction – input to corrosion and fracture mechanics calculations.
Materials and the properties products Dr. Norman Swindells, CEng, FIMMM Ferroday Ltd, UK 21/04/2015(c) Ferroday Ltd 2015, Vico Equense 1.
Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland.
Institute of Building Materials Research Conservations Repair and Polymer Composites RWTH Aachen University, Germany “Who`s managing the quality in the.
High Performance Concrete. Content Introduction What is High Performance Concrete? Application Objectives General Characteristics Advantages Limitations.
S.KAVITHA 09J11 Guided by: DR.G.CHITRA.  The loss of stiffness caused by corrosion regained by FRP application  Confine concrete and improve the compressive.
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
CIVI 6061-Strengthening of bridges using FRP
How long will your concrete bridge last?
Presented To: Dr. Ashutosh Bagchi
JCSS Model Code Fatigue, inspection and reliability
CONCRETE PROTECTION MATERIALS & TECHNIQUES
DURABILITY OF CONCRETE STRUCTURES RURAL POLYTECHNIC TARIHAL
Project COMP10: Designing for Blade Aeromechanical Integrity
REPAIR AND REHABILITATION OF STRUCTURES
Monitoring Steel Corrosion Challenges
How long will your concrete bridge last?
4th Annual Construction Law Summit
Updating the failure probability of miter
The Engineering Integrity Society
Standards, Best Practice Guidances and Thresholds
ASSESSEMENT AND REHABILITATION OF STRUCTURES
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
FIBER REINFORCED CONCRETE
Presentation transcript:

Bridge Related Research at the University of Surrey An Overview by Prof Gerry Parke UniS

Composite Materials & Structures Research UniS

Composites Research at UniS Extends from micro to macro scale Involves researchers from several disciplines –Chemistry –Materials Science –Mechanical and Civil Engineering Covers processing, characterisation, structural behaviour and durability aspects

Principal Research Groups Polymers, Colloids & Interfaces Laboratory based in Physics and Chemistry Composite Materials and Structures Group based in School of Engineering Strong interaction between groups manifested through common interests and projects

Polymers, Colloids & Interfaces Laboratory Electron and proton-beam processing of thermosetting polymers High-performance matrix resins Fibre-matrix Interactions Composite repair and toughness enhancement Simulation of the forming of a woven fabric where wrinkling occurs

Composites Research Group Fundamental behaviour and properties of individual constituents and simple elements –Single fibres, cloths –Laminates –Notches, Joints Damage mechanics, lifetime prediction, process modelling, smart technology are principal research themes Excellent facilities for fabrication, mechanical testing and numerical simulation

Composites Research Group Static, dynamic, fatigue and long-term characteristics of composite systems –Concept development –Model and prototype testing –Numerical analysis and parametric studies Strengthening and upgrading in construction Development of design guidance –Limit State approach –Reliability analysis

Damage and Fracture in Woven Fabric Composites Experimental and analytical study Complex localised damage zone at notch tip

Use of Fibre Optic Sensors to Detect Damage in Composites

Development of Advanced Composite/Concrete Units

CONCRETE Two plies of +/- 45 o GFRP manufactured from XLTM65U prepreg 4mm plywood plate Eight plies of 0/90 o CFRP from XLTM65U prepreg Cross-section of Tee beam of Composite/Concrete Construction

Development of Advanced Composite/Concrete Units

Pre-stressed Composite Plates for Upgrading of RC structures

Design of composite shells

Risk and Reliability Assessment of Bridge Structures and Stocks Marios Chryssanthopoulos School of Engineering University of Surrey

The Problem Deterioration of an aging bridge stock Increasing traffic loads and frequencies Limited resources Routine Preventative Essential Years Expenditure

The Problem Deterioration of an aging bridge stock Increasing traffic loads and frequencies Limited resources Routine Preventative Essential Years Expenditure

Chloride induced deterioration

Uncertainty and Performance Incomplete knowledge Future occurrence Idealised modelling Causes of Uncertainty Time-varying performance

Structural Reliability Analysis Input Uncertainty Output Performance Performance Frequency System Model

Reliability Assessment of RC bridges Cause –De-icing salt Deterioration Processes –Chloride ingress –Corrosion of reinforcement –Concrete cover delamination Modelling - Spatial - Simulation - Reliability - Case Studies

Reliability Assessment of RC Bridges Cause –De-icing salt Deterioration Processes –Chloride ingress –Corrosion of reinforcement –Concrete cover delamination Modelling - Spatial - Simulation - Reliability - Case Studies

Probabilistic Input Deterioration –Effective diffusivity, chloride quantity, critical chloride corrosion threshold, corrosion rate Materials & Geometry –concrete compressive and reinforcement yield strength, section dimensions Loading –Dead and Superimposed Dead – Live (static + dynamic amplification factor) Modelling - Spatial - Simulation - Reliability - Case Studies

Spatial Analysis Grid Squares Bridge Zones Zone 2 Deck joint failed Deck joint intact Motorway Zone 5 Zone 4 Zone 3 Zone 5 Zone 6 Different cover depths on bent faces Airborne Chlorides Zone 1

Typical Simulation Output Low chloride environment after 20 years Medium chloride environment after 20 years Severe chloride environment after 20 years Key Corroding for :-  >15 years   5-10  <5 years  no years Modelling - Spatial - Simulation - Reliability - Case Studies

Typical Simulation Output Deterioration profile for an identified zone

Modelling - Spatial - Simulation - Reliability - Case Studies Time-Varying Reliability Analysis Failure margins Monte Carlo Simulation Evaluation of Reliability

Modelling - Spatial - Simulation - Reliability - Case Studies Case Study - Zone from a RC Bridge Identified Zone Failed or intact deck joint Road spray if traffic passes under bridge

Modelling - Spatial - Simulation - Reliability - Case Studies Time-Varying Reliability Profile

Conclusions Spatial approach can improve deterioration prediction capability Spatial deterioration can be integrated with limit state reliability analysis Members/structures may be compared through time-varying reliability profiles Further work on deterioration models/data

Spatial Deterioration Modelling The Pros: Improved knowledge of current condition Improved modelling of future condition Predict future inspection and maintenance requirements (preventative?) –Produce long term financial/work plans Remove a degree of subjectivity/uncertainty

Spatial Deterioration Modelling The Cons: Increased (upfront) expenditure on: –Data collection (traffic management, possessions etc) –Spatial analysis –Develop supporting Bridge Management Systems Black Box management: –Ensure that experience and judgement play a role –Danger of overlooking local unforeseen phenomenon through the use of generic models

S-N approach Fracture Mechanics approach Fatigue Loading Semi-analytical pdf’s cycle counting methods Typical limit states Material uncertainties Model uncertainties Correlation effects Fatigue Assessment of Steel Bridges

Example application: Fatigue life assessment after inspection and repair Fatigue treatment based on Fracture Mechanics Probabilistic models from JCSS-PMC NDE and different types of invasive action (load truncation and/or weld toe grinding) 25m30m25m 5m Detail location Cover plate detail

VariableDistributionType adad POD*Inspection agag UniformRepair a fail DerivedMixed SrSr Rayleigh Load S max Gumbel Fatigue assessment: Random Variables (2) * POD for MPI used in case study

Inspection and crack detection at T=30y Alternatives considered: 1.Load truncation (LT) 2.Weld toe grinding (G) 3.Load truncation + weld toe grinding (LT+G) Fatigue assessment: scenarios

I: Inspection, D=Detection IA: Invasive Action, LT=Load Truncation, G=Weld Toe Grinding Fatigue assessment: typical results

Future Research Can we justify Managed Deterioration within Bridge Management? Integrate with Inspection and Monitoring Develop Bridge Management Systems to support improved modelling and inspection updating Use within an Asset Management Regime taking into account WLC, LCA and Social Aspects Integrate into Asset Value of Structures

The Deterioration of Reinforced Concrete: A Trillion Dollar Problem Dr Mike Mulheron, School of Engineering

Nuclear Magnetic Resonance

T  s 1ms1ms 1  s 10ms 10  s 100ms 10s 1s Chemically bound water Water in small pores Water in large pores Bulk water By analyzing the response decay time, T 2, we can get information concerning the local environment in which the protons exist. Relaxation Analysis

NMR T analysis used to follow the development of cement paste pore structures… Relaxation Analysis 2 1 hr. 4 hr. 1 day 8 day 28 day Peak position  pore size. Peak height  relative proportion.

Gradient Echo MRI

4 slices per mm  positional accuracy  250  m. Water ingress into cement

Hydrophobic Surface Treatments Concrete surfaces are generally easily wetted and so have a tendency to absorb water into the pores of poorly cured cement pastes.

12 minutes 80 minutes 18 days Silane ingress Uptake Dynamics of Silane

2 days 12 hrs 4 hrs 0.5 hrs Water ingress Treatment cured at 50°C for 4 days. Post-treatment Effectiveness

Water ingress 2 days 12 hrs 4 hrs 0.5 hrs Treatment cured at 20°C for 28 days. Post-treatment Effectiveness

Surface Applied Corrosion Inhibitor

Subsequent Redistribution with Time ingress

Chloride ion Profiles in Cement

Other Bridge Related Research at the University of Surrey UniS  Assessment of riveted bridges.  Technology transfer study from offshore to bridge sector on system reliability assessment.

Other Bridge Related Research at the University of Surrey UniS  Development of system reliability methodology for bridges.  Damage tolerance assessment of bridges using system reliability methods (Korean Government).

Other Bridge Related Research at the University of Surrey UniS  Integration of proactive health monitoring data into reliability based management of bridges (University of Surrey Scholarship).  Contributing to the development of educational and training packages on risk and reliability for industry and universities.

Other Bridge Related Research at the University of Surrey UniS Thank you all for listening Prof Gerry Parke