TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia

Slides:



Advertisements
Similar presentations
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Advertisements

UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
DNV Climate Change Services AS: Trine Kopperud 05 May 2011 DOEs perspective: DOE Liability in context of PoA Workshop on Programme of Activities under.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
PoA Challenges & Opportunities
BASELINE STANDARD UNFCCC secretariat workshop
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
Regional Distribution
PoA AFTER Cancun - READY TO TAKE OFF NOW
Zertifizierung Project Cycle – Programme of Activities 7th CDM Joint Coordination Workshop Jun Wang; TÜV NORD CERT GmbH
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
“Workshop on PoA: Challenges and Road Ahead” Session 10: - Should liability be shared by DOE and PP/CME - Perspectives of DOEs DOE/AIE Forum | Werner Betzenbichler.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
ICAO Symposium on Aviation and Climate Change, “Destination Green”, 14 – 16 May 2013 Destination Green Overview of the United Nations’ offset mechanisms.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
UNFCCC secretariat Overview of the PoA and business models Training-Workshop on the “Uganda Municipal Waste Compost Programme” 21st -24th Oct 2013, Mukono.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O BJECTIVES AND D ESCRIPTION OF THE CDM O PERATIONS P LAN.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
Programmatic CDM Joergen Fenhann DFC 9. August 2011.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
ISO 9000 Certification ISO 9001 and ISO
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF V IETNAM R ENEWABLE E NERGY D EVELOPMENT P ROGRAM (REDP) O PERATIONS.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Presentation title Session 2: The CDM Project Cycle Post-registration changes Renewal of crediting period Training-Workshop to support the “Uganda Municipal.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
CFL Lighting Scheme CDM based “Bachat Lamp Yojana” Initiated by.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 9.1 „Application of Sampling in.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
1 st Management Review Meeting on 1 st Sept,2010 “Bachat Lamp Yojana” 3223.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CFL Lighting Scheme – Bachat Lamp Yojana CDM Requirements.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
UNFCCC Secretariat From PoA to NAMAs - Co-existence (opportunities and challenges) Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
Best Practices for Preparing PoA- DD and CPA-DD UNFCCC Workshop on PoAs, 7 May 2011 Dr. Christoph Sutter CEO, South Pole Carbon Asset Management Patrick.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
TÜV SÜD Industrie Service GmbH Workshop on PoA under the CDM: challenges and the road ahead - Bonn 8/9 May 2011 Session 8.1 „Additionality in the context.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
“Workshop on PoA: Challenges and Road Ahead” Session 2: Challenges in implementation of PoA policy and procedures - Experiences and challenges from the.
Clean Development Mechanism
Q&A sessions at UNFCCC SB26
CDM Activity Cycle under the Marrakech Accords
Joint implementation programmes of activities (JI PoA)
Presentation transcript:

TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia

TÜV SÜD South Asia TÜV SÜD: Corporate Overview Overview Requirements Challenges

TÜV SÜD South Asia 3 May 2015 Corporate Overview Leading one-stop global solution provider for product quality and safety testing & inspections, engineering support, management system certification and training solutions Sales revenue of € 1.60 billion in FY 2010 Founded over 140 years ago in Mannheim, Germany Today about 13,000 employees located in over 600 locations worldwide Global headquarters in Munich, Germany Regional Headquarters: Asia Pacific - Singapore; America - Danvers (Massachusetts)

TÜV SÜD South Asia 3 May 2015 TÜV SÜD: Corporate Overview Overview Requirements Challenges

TÜV SÜD South Asia Overview – Acronyms PoA = Programme of Activities CPA = CDM Program Activity CDM PoA DD = CDM Programme of Activities Design Document CDM CPA DD = CDM Program Activity Design Document CME = Coordinating Managing Entity 3 May 2015

TÜV SÜD South Asia 3 May 2015 Overview Unlimited number of CPAs – As a single CDM project More than one country Inclusion of CPAs at any point of time Can be implemented by many entities/owners

TÜV SÜD South Asia 3 May 2015 Overview One approved baseline and monitoring methodology for all CPAs Demonstration of additionality Unambiguous identification All CPAs end when PoA ends All CPAs are monitored as per monitoring plan

TÜV SÜD South Asia 3 May 2015 TÜV SÜD: Corporate Overview Overview Requirements Challenges

TÜV SÜD South Asia 3 May 2015 Requirements – registration Program life for 28 years (60 years for AR programmes) Each CPA crediting period either 10 or 21 years but limited to remaining life of PoA CPA is not part of any other approved CDM/ VER project MUST issues to be checked by DOE Additionality of the PoA Eligibility criteria for inclusion of a proposed CPA in the registered PoA, including criteria to be used for demonstration of additionality of a CPA CER registered/ issued in the name of managing entity and distributed among the participants according to contract Consistency between CDM-POA-DD and the PoA specific CDM-CPA-DD to be used for inclusion of a CPA in the registered PoA Program life for 28 years (60 years for AR programmes) Each CPA crediting period either 10 or 21 years but limited to remaining life of PoA CPA is not part of any other approved CDM/ VER project MUST issues to be checked by DOE Additionality of the PoA Eligibility criteria for inclusion of a proposed CPA in the registered PoA, including criteria to be used for demonstration of additionality of a CPA CER registered/ issued in the name of managing entity and distributed among the participants according to contract Consistency between CDM-POA-DD and the PoA specific CDM-CPA-DD to be used for inclusion of a CPA in the registered PoA

TÜV SÜD South Asia 3 May 2015 Requirements – Inclusion of CPAs in Registered PoA Completed CDM-CPA-DD for one CDM Programme Activity (CPA) The coordinating/managing entity shall forward the CPAs to DOE for inclusion CME should ensure all the requirements determined in the PoA and its specific CDM-CPA-DD are met The CME may forward more than one CDM-CPA-DD at one time This DOE shall scrutinize the information in the CDM-CPA-DD against registered CDM-PoA-DD and documentation requirements. Completed CDM-CPA-DD for one CDM Programme Activity (CPA) The coordinating/managing entity shall forward the CPAs to DOE for inclusion CME should ensure all the requirements determined in the PoA and its specific CDM-CPA-DD are met The CME may forward more than one CDM-CPA-DD at one time This DOE shall scrutinize the information in the CDM-CPA-DD against registered CDM-PoA-DD and documentation requirements.

TÜV SÜD South Asia 3 May 2015 Requirements – Inclusion of CPAs in Registered PoA CPA should comply eligibility criteria specified in the CDM-POA-DD, including, as appropriate, the demonstration of the additionality of the CPA Calculations of baseline emissions and estimated emission Confirmation that the CPA is neither registered as a CDM project activity nor included in another registered PoA If consistency/integrity is confirmed, DOE shall include the proposed CPA(s) in the registered PoA by uploading the CDM-CPA-DD to the CDM Executive Board. Such uploads shall be grouped and not occur more frequently than once per month CPA should comply eligibility criteria specified in the CDM-POA-DD, including, as appropriate, the demonstration of the additionality of the CPA Calculations of baseline emissions and estimated emission Confirmation that the CPA is neither registered as a CDM project activity nor included in another registered PoA If consistency/integrity is confirmed, DOE shall include the proposed CPA(s) in the registered PoA by uploading the CDM-CPA-DD to the CDM Executive Board. Such uploads shall be grouped and not occur more frequently than once per month

TÜV SÜD South Asia 3 May 2015 Requirements – Inclusion of CPAs BLY PoA CPA should comply eligibility criteria specified BLY-PoA DD

TÜV SÜD South Asia 3 May 2015 Requirements – Inclusion of CPAs BLY PoA Justification of applicable methodology Demonstration of Additionality at CPA level in line with the requirment of BLY PoA SSC-CPA s have to follow the monitoring plan as described in BLY-PoA section E.7.2 SSC-CPAs needs to develop project implementation handbook covering all requirements as stated in BLY-PoA section E.7.2 Justification of applicable methodology Demonstration of Additionality at CPA level in line with the requirment of BLY PoA SSC-CPA s have to follow the monitoring plan as described in BLY-PoA section E.7.2 SSC-CPAs needs to develop project implementation handbook covering all requirements as stated in BLY-PoA section E.7.2

TÜV SÜD South Asia Requirements - request of issuance The coordinating/managing entity shall: (a)Maintain all monitoring reports of all CPAs in accordance with the record keeping system identified in the CDM-POA-DD (b)Make available all monitoring reports requested by a DOE for verification purposes; The DOE shall: (a)Identify those CPAs that it shall consider for verification in accordance with the method/procedure to be used for verification under the PoA and determined in the CDM-POA-DD (b)Make all monitoring reports received immediately publicly available on the UNFCCC CDM website (c)Systematically verify and certify the correct implementation and operation of the record keeping system. The coordinating/managing entity shall: (a)Maintain all monitoring reports of all CPAs in accordance with the record keeping system identified in the CDM-POA-DD (b)Make available all monitoring reports requested by a DOE for verification purposes; The DOE shall: (a)Identify those CPAs that it shall consider for verification in accordance with the method/procedure to be used for verification under the PoA and determined in the CDM-POA-DD (b)Make all monitoring reports received immediately publicly available on the UNFCCC CDM website (c)Systematically verify and certify the correct implementation and operation of the record keeping system. 3 May 2015

TÜV SÜD South Asia 3 May 2015 TÜV SÜD: Corporate Overview Overview Requirements Challenges

TÜV SÜD South Asia 3 May 2015 Challenges Determining and verifying baseline Substantiation of additionality for different regions involved among CPAs. Accounting for national & state policies/assessing additionality Single/overlapping crediting periods Unique identification of location Uniform monitoring for all CPAs Uniform record keeping for all CPAs Monitoring and verification of emissions reductions Adequate coordination and communication Determining and verifying baseline Substantiation of additionality for different regions involved among CPAs. Accounting for national & state policies/assessing additionality Single/overlapping crediting periods Unique identification of location Uniform monitoring for all CPAs Uniform record keeping for all CPAs Monitoring and verification of emissions reductions Adequate coordination and communication

TÜV SÜD South Asia 3 May 2015 Thank you Vijayanand TÜV SÜD South Asia