Maintaining Gage Datum: Levels at Gaging Stations.

Slides:



Advertisements
Similar presentations
Culvert Inventory and Assessment Protocol 2015 Field Season.
Advertisements

Levelling Checks.
Applying Profiling Leveling Techniques
DATUMS AND BENCH MARKS Gun Metal Bolt Polished Flint Iron Covers Cover Stone Granite Pillar Gun Metal Bolt Name plate Concrete Firm Rock SECTION FUNDAMENTAL.
Precise Digital Leveling Section 7 Wrap-up and Bench Mark Resets.
LEVELING (a most elevating passtime). The problem: I’m here standing on ground that’s metres above mean sea level I need to know the elevation.
Profile Leveling.
Discharge Measurements Created by: Jake Jacobson, ID WSC Modified by: Jeff Kitchen, CA WSC.
Victor Levesque U.S. Geological Survey Florida Water Science Center Tampa, Florida Documenting Regression Analysis for Index Velocity Ratings.
CIVL 102 Leveling Lab Briefing on Field Work. Instrument error  suppose Instrument error  suppose line of sight not truly horizontal as telescope is.
Flood Analysis of Scioto River Using HEC-RAS/GIS Converting HEC-2 Data for HEC-RAS /ArcView GIS Analysis and Inundation Mapping (A pilot using Big Darby.
Differential Leveling Mr. Conrado Agm 230. Leveling Operations The basic function of the tripod level is to provide the operator with a level line of.
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
Indiana LICA Contractor Certification Training Workshop 2008 Basic Surveying Concepts.
Applying Differential Leveling Techniques. Next Generation Science /Common Core Standards Addressed! CCSS.ELA Literacy. RST.9 ‐ 10.2 Determine the central.
HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE
Principles of Surveying
Profile and Differential Leveling
Differential Leveling
Differential Leveling
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
NWS FORM E-19/E-19A  THE E-19 IS A 10 PAGE “REPORT OF RIVER GAGE STATION”.  THE E-19A IS A ONE-PAGE SUMMARY SHEET.  THE E-19/E-19A CONTAINS INFORMATION.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
DESIGNING BENDWAY WEIRS
How to Calculate a Traverse with the Traverse Calculator
Leveling Chapter 4. Why do we perform leveling surveys? To determine the topography of sites for design projects Set grades and elevations for construction.
Chapter (5) Leveling Introduction:
USGS Overview Workshop on Improved Quality of Data and Data Exchange for Climate Research and Analysis NOAA National Climatic Data Center Bill Hazell,
Levelling Applications:
GUJARAT TECHNOLOGICAL UNIVERSITY BIRLA VISWAKARMA MAHAVIDHYALAYA (ENGINEERING COLLEGE) VALLABH VIDYANAGAR SUBJECT: ELEMENTS OF CIVIL ENGINEERING (CODE )
Precise Digital Leveling Section 5 Leveling Specifications.
Afghan Water Task Progress Report September 7, 2006 EROS Data Center, Sioux Falls, SD Gregg J. Wiche Doug G. Emerson U. S. Geological Survey Bismarck,
Chap 7 – Differential Leveling
Basic Hydrology: Gauge Analysis. Gage Analysis Gage analysis is use of historical records to construct a frequency curve for a gauging station. This frequency.
Chapter 4- Bench Checks1 Chapter 4 Bench Checks. Chapter 4- Bench Checks2 Before construction begins the BMs need to be checked. Why? From Design Phase.
Lesson Applying Differential Leveling Techniques.
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
CTCT PCS900 v1.10 Quick Start Guide Phil Jackson Training Manager March 2010.
How to Navigate a Set of Field Notes….. First the Jargon… Benchmark Backsight Foresight Height of Instrument Elevation Turning Point Station.
How to: Some Basic Principles for Leveling
Surveying 1 / Dr. Najeh Tamim
Levelling Horizontal Line Pull of Gravity Reduced Level Height
BANK DEPOSIT PREPARATION Pacific Area Finance Training February 2008.
SURVEYING FOR INSPECTORS. Course Content Introduction Chapter 1 – Chapter 1 – Field Equipment Chapter 2 – Chapter 2 – Location Survey Chapter 3 – Chapter.
Applying Differential Leveling Techniques
Chapter (5) Leveling Introduction:
DIFFERENTIAL – PROFILE LEVELING
Profile Leveling.
Basic Hydrology & Hydraulics: DES 601
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Surveying a Level Loop Surveying a Level Loop
Unit: Surveying Lesson: Differential Leveling
Engineering Surveying
Leveling Intro to Leveling.
Level Loop (or Closed Circuit)
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Leveling.
Surveying a Level Loop Surveying a Level Loop
Revise No. 1.
Differential Leveling
Leveling.
Example Exercise 3 Bank Reconciliation
Stream Crossing Bootcamp
Presentation transcript:

Maintaining Gage Datum: Levels at Gaging Stations

A visit to Pacific Creek at Moran, WY The gage is referenced to a wire-weight gage attached to the upstream left bank side of the bridge. There are several brass caps or reference marks located around the gage. The gage is referenced to a wire-weight gage attached to the upstream left bank side of the bridge. There are several brass caps or reference marks located around the gage.

Plan View of Gage Site

Reference Marks Should have at least three stable RMs Should have at least three stable RMs They should be independent of each other They should be independent of each other At least one should be located above the maximum potential flood stage At least one should be located above the maximum potential flood stage

Preparation for a level circuit Two-peg test the instrument to verify the collimation error is within |0.003| ft/100. Enter the results in the two-peg test log Two-peg test the instrument to verify the collimation error is within |0.003| ft/100. Enter the results in the two-peg test log Be sure to run tests on both the optical and digital systems of the instrument Be sure to run tests on both the optical and digital systems of the instrument With a steel tape determine that the enamel sections on the Philadelphia or Chicago rod read within ft With a steel tape determine that the enamel sections on the Philadelphia or Chicago rod read within ft

Preparation for a level circuit (cont.) Locate the initial or reference bench mark and the other reference marks or brass caps, clear debris away Locate the initial or reference bench mark and the other reference marks or brass caps, clear debris away Determine where you are going to set up for each shot Determine where you are going to set up for each shot Level the instrument and begin by noting the time and initial elevation Level the instrument and begin by noting the time and initial elevation

Take a backsight on the origin (given elevation) to establish the initial elevation or height of the instrument (HI) for the level. North Fork Teton River near Teton, ID

Then take Foresights (FS) to objects [RMs, RPs, gages, WS etc.] to determine the first elevations. Establish an independent turning point (TP) by taking a FS on a stable object that is not included in the level circuit. North Fork Teton River near Teton, ID

Move and level the instrument. Take a BS to the established TP to determine a second HI. Take FS’s to the same objects to obtain the second elevations. The final FS should be taken on the original RM. North Fork Teton River near Teton, ID

Two criteria for a valid level circuit: Compute closure error of circuit [given elevation of origin minus final elevation of origin]. Closure must be less than or equal to |0.003* √n| where n is number of instrument setups. Distribute closure error to all HIs of level circuit. Compute difference between First and Second elevations for each object of level circuit. Difference in elevations must be less than or equal to |0.005| ft.

Key Points to Anticipate Try to balance the distances from the instrument to all objects of level circuit Try to balance the distances from the instrument to all objects of level circuit Obtain 2 shots on the water surface from different HIs and read the recorder, also noting the time of day Obtain 2 shots on the water surface from different HIs and read the recorder, also noting the time of day Shoot the bottom of the wire-weight while near the water surface Shoot the bottom of the wire-weight while near the water surface Turn on a stable object and shoot items in the reverse order to the point of beginning Turn on a stable object and shoot items in the reverse order to the point of beginning

To Conclude the Level Circuit Verify that the circuit meets OSW criteria. Verify that the circuit meets OSW criteria. Field check level notes Field check level notes Adjust gages if they differ from levels by |0.015| or more. Adjust gages if they differ from levels by |0.015| or more. Write up the reason for and the findings of the level circuit on the note sheet Write up the reason for and the findings of the level circuit on the note sheet Have the level notes checked a second time. Have the level notes checked a second time. Update the station description, level summary sheet, station history and SIMS Update the station description, level summary sheet, station history and SIMS Update the office files Update the office files

Front sheet Back sheet

Level notes and computations

Frequency of Levels OSW Memo is the current guidance – (New levels T&M clarifies 90.10): As a station is started, levels should be run every year for 3 years. As a station is started, levels should be run every year for 3 years. Levels at streamflow gaging stations should be run at least every 3 years. Levels at streamflow gaging stations should be run at least every 3 years. If, after at least 5 sets of levels over a period of at least 10 years, the gaging station is shown to be stable, a lesser frequency of levels may be adopted. If, after at least 5 sets of levels over a period of at least 10 years, the gaging station is shown to be stable, a lesser frequency of levels may be adopted.

Frequency of Levels (cont.) If stability is shown to exist, levels should be run at least every: If stability is shown to exist, levels should be run at least every: - 5 years at regular gaging stations. - 3 years at crest-stage stations. Levels can always be run more frequently. Levels can always be run more frequently. As a station is discontinued, a level circuit should be run. As a station is discontinued, a level circuit should be run. A good routine would be to survey at least 1/3 of the levels each year. A good routine would be to survey at least 1/3 of the levels each year.

Levels at Gaging Stations For more information: Procedures for Running Levels at Gaging Stations, T. A. Kenney, Techniques and Methods 3-A19 Procedures for Running Levels at Gaging Stations, T. A. Kenney, Techniques and Methods 3-A19 Levels at Streamflow Gaging Stations, Levels at Streamflow Gaging Stations, E.J. Kennedy, TWRI, Book 3, Ch. A19 Levels at Streamflow Gaging Stations Levels at Streamflow Gaging Stations A CD-ROM Training Class, K. Michael Nolan, Nathan Jacobson, Robert Erickson, and Stanley Landon OSW Memo (levels frequency) OSW Memo (levels frequency) OSW Memo (side shots) OSW Memo (side shots)