March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.

Slides:



Advertisements
Similar presentations
KEK Recent results of beam tests on clearing electrode and grooves 2010/1/191ILC DR WebEx Meeting Y. Suetsugu, KEK.
Advertisements

Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
RedOffice.com Presentation templates Slide No. 1 RFA Detector Data of Electron Cloud Build-up and Simulations Eric Wilkinson Mentor: Jim Crittenden Cornell.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Sep 29 – Oct 3, 2009 LCWA 09 Linear Collider Workshop of the Americas Sept 29 – Oct 4, 2009 Damping Ring R&D updates SLAC Mauro Pivi SLAC Allison Fero.
Single-bunch Instability Simulation in CesrTA Mauro Pivi SLAC and Kiran Sonnad Cornell U. IWLC October 2010 CERN.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Webex Electron Cloud Evaluations for ILC DR Mauro Pivi on behalf of the ILC Electron Cloud Working Group - by Webex - KILC12 – Daegu Korea April 25, 2012.
EC R&D at SLAC, KEK, INFN, CERN –Details from KEK, INFN and CERN EC R&D CesrTA –Examples of RFA and SPU studies –Survey of results on mitigations –Buildup.
ILC damping ring Workshop, Dec 19, 2007, KEK, L. WANG Ecloud simulation 2007 ILC Damping Rings Mini-Workshop December, 2007 Lanfa Wang, SLAC.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Intra-Beam Scattering and Electron Cloud for the Damping Rings Mauro Pivi CERN/SLAC CLIC Collabortion Meeting CERN 9-11 May 2012 Thanks to: F. Antoniou,
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
Observations and Predictions at CesrTA, and outlook for ILC G. Dugan, on behalf of M. Billing, K. Butler, J. Crittenden, M. Forster, D. Kreinick, R. Meller,
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
International Linear Collider R&D on electron cloud (SLAC)
Groove Mitigation and Plans
Mark Palmer for the CESRTA Collaboration
Electron Cloud Effects in SuperB
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
RECENT DEVELOPMENTS IN MODELING
Ecloud in quadrupole & Sextupole
Work In January 2007, we installed 5 chambers in a straight Field Free region of PEP-II Low Energy Ring (LER). Closest bend at ~18 meters upstream: 1 stainless.
Agenda Today: Electron cloud build-up in Wigglers – Theo Demma
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
Agenda Today: CesrTA and SuperKEKB simulations - Ohmi
ILC DR instability simulations
Andy Wolski University of Liverpool and the Cockcroft Institute
CesrTA Experimental Schedule and Priorities
ILC DR instability simulations
ILC DR Working Group on Collective Effect: Electron Cloud
ILC Damping Ring electron cloud WG effort
Electron Cloud Build-up in ilcDR
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
ILC DR instability simulations
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans

March 22, 2011 Characterization of electron cloud at different bunch spacing: 6ns and 3ns. SynRad3D simulations for baseline DR –antechamber under testing –Include photoelectron model Build-up simulations for the baseline DR –with photoelectron distribution by Synrad3D Instability simulations for the baseline DR Write Report on Mitigation Recommendation ILC DR e- cloud Working Group Plans Mauro Pivi SLAC, ALCPG11 Workshop March 2011

March 22, 2011 The Working Group gave a preliminary recommendation for mitigations in October It would be good to make the Executive Summary available for the ILC community: ILC EDMS, Cornell Wiki site, SLAC-PUB, Report Document on Mitigations and Recommendation for ILC DR Mauro Pivi SLAC, ALCPG11 Workshop March 2011

March 22, 2011 IPAC11 paper Then, write a full report produced by the Working Group by September 2011, including: the description of mitigations, the research work, the description of the recommendation process and the recommendation for electron cloud mitigations. Submit to journal?! Report Document on Mitigations and Recommendation for ILC DR Mauro Pivi SLAC, ALCPG11 Workshop March 2011

March 22, Introduction, 5 [?] 1.1Request from AAP, 3 [?] 1.2Working Group, Charges, Deliverables and Milestones, 5 [Guiducci] 1.3Test Facilities contribution to DR 20 [Palmer] 2.0Introduction of the Electron Cloud effect 10 [Furman] 3.0Overview of Electron Cloud Mitigations [Pivi/Palmer] 3.1 Solenoid 10[Kanazawa/Pivi] 3.2 TiN coating10 [Pivi/Suetsugu/Calvey] 3.3 Carbon coating 10 [Calatroni/ Palmer] 3.4 NEG coating 10 [Malishev/Palmer] 3.5 Coating and impedance[Papaphilippou] 3.6 Grooves and Impedance 10 [Suetsugu/Pivi/Calvey] 3.7 Clearing Electrodes and Impedance 10 [Suetsugu/Billing] 3.8 Conditioning 10[Suetsugu/Li] 3.9 Single-bunch Feedback system 10 [C. Rivetta] 3.95 Other mitigations (more or less mature) 8 [Palmer]  Report Document on Mitigations and Recommendation for ILC DR

March 22, Simulations [Pivi] 5.1DR layout and parameters, 10 [Guiducci] 5.2Photon and Photoelectron Production, 10 [Harkay, Dugan] 5.3Build-up simulations Simulation in dipoles and drifts 10 [Furman] Simulation in wigglers 10 [Demma] Simulation in quads and sexts 10 [Wang] 5.4Single-bunch instability simulations 10 [Pivi] Report Document on Mitigations and Recommendation for ILC DR

March 22, Recommendation for the baseline and alternate solutions for the electron cloud mitigation in various regions of the ILC Positron Damping Ring 8.1Set of criteria for a decision, 5 [Pivi] 8.2Mitigation costs, 3 [Suetsugu / Palmer] 8.3Reviews and Meetings, 2 [Pivi] 8.4Methodology for Recommendation, 6 [Pivi] 8.5 Mitigations recommendation: [Pivi/Palmer/Guiducci] Dipole regions, Wiggler regions, Drift regions, Quadrupole regions, 5 9.0Summary 5 [Pivi] Report Document on Mitigations and Recommendation for ILC DR

March 22, 2011 WG Main Deliverables Recommendation for the reduction of the ILC Positron Damping Ring Circumference Recommendation for the electron cloud mitigation in various regions of the ILC Positron Damping Ring. Done March 2010 Done October 2010 Characterization of electron cloud at different bunch spacing: 6ns and 3ns Done October 2010 Report on Recommendation for Mitigations ~January 2012 Mauro Pivi SLAC, ALCPG11 Workshop March 2011