Re-use, recycling and future of demolished buildings in Russia Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko.

Slides:



Advertisements
Similar presentations
Regional Workshop Warsaw, January 2006 STATE UNION OF SERBIA AND MONTENEGRO Basel Protocol on Liability and Compensation Questionnaire No. 2 Ratification.
Advertisements

MIXED NHIC WASTE TIPPED INSIDE WASTE RECEPTION BAY.
Implementation of law in practice Legal adviser Jędrzej Klatka Ministry of Environment expert Polish Chamber of Ecology expert
Pakistan Nuclear Regulatory Authority
1 DEBRIS MANAGEMENT OVERVIEW PRESENTER: GREG KELLER, Disaster Recovery Branch Grants Administrator/Public Assistance Officer (614)
Success Using a Big Carrot and a Little Stick Disposal of Uninhabitable Mobile Homes.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Welcome to the WEEE & TFS Workshop. The Definition of Waste Clare McCallan, Waste Policy Advisor.
Riga City Development Department Presentation by AIGARS KUŠĶIS architect – territorial planner member of the working group of the PDP.
Foreign economic activity participants Foreign economic activity participants – a legal entity or an individual registered as individual entrepreneurs.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
Guiding principles for the Federal acquisition system
1. Turkmenistan GDP Real Growth in % 2 Financial sector reforms Creating conditions for development of small and medium-sized businesses; Transition.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Mechanic’s Lien DENIZE & SARAH. WHAT IS A MECHANIC’S LIEN  A Mechanic’s Lien is a security interest in the title to property for the benefit of those.
EU and cross-border transportation of waste Cologne, June 23rd, 2004.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
1 PUBLIC EXPENDITURE AND AUDIT COMMITTEE Jānis Reirs Member of Public Expenditure and Audit Committee Public Expenditure and Audit Committee.
Construction Specifications Foreman’s Development Series
Re-use, recyling and future of demolished buildings.
Deconstruction: A Local Government Model Wayne Fenton Orange County Public Works, Hillsborough, NC.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects related to Brownfield redevelopment in Lithuania Daiva.
OH NO! WHAT DO WE DO NOW. WHAT DO YOU DO WHEN YOU DISCOVER THAT YOU’VE NOT BEEN DOING SOMETHING THAT YOU ARE REQUIRED TO DO? THE STORY OF RCW WATER.
Customs payments and customs fees. Customs? Customs is an authority or agency in a country responsible for collecting customs duties and for controlling.
1. HOLISTIC PROCEDURE. 5. FUTURE. 4. LAWS & REGULATIONS. 3. RECYCLING & RE-USE. 2. SEPARATION.
Green Recycling Network Toward a Greener Tomorrow... Today!
Supervision and Oversight in Procurement as a Tool of Efficient Project Implementation.
Russian Petroleum Safety Regulations Irina Fodchenko vit. ass., NIFS Startseminar NIFS-sjøsikkerhetsprosjekt Lysebu, januar 2008.
Andrea Massaro, Italy TS 9 F – Real Estate Management FIG Working Week 2010 Sidney, Australia, April 2010.
Asbestos NESHAP Inspection and Safety Procedures Workshop Section Seventeen Legal Perspectives October 2008.
Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
Customs broker. Customs representative (broker) - a legal entity to which a cargo owner ( владелец груза ) entrusts clearance of goods moved across the.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Harcourts Building, Wellington Lambton Quay Properties v Wellington City Council [2014] NZEnvC 229.
Ministry of Land, Infrastructure, Transport and Tourism Method for Ensuring the Implementation of Supervision NAKAE Hajime Architecture & Building Engineering.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Georgian Legislation on Involuntary Land Acquisition and Resettlement and WB OP 4.12 Tbilisi, May 2013 Klavdiya Maksymenko.
Regulation and practice on the use of metal detectors in Estonia Armin Rudi National Heritage Board.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
IDEM Update Air and Waste Management Meeting December 10, 2015 Carol S. Comer, Commissioner Indiana Department of Environmental Management.
Translating Contracts Rob Lunn Website/blog: (Legally Yours From Spain) Talk notes:
Wisconsin DNR Waste and Air Management Regulatory Perspective Non-Refillable Gas Cylinder Recycling Stakeholder Symposium October 2009 David Panofsky,
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Waste Management (End of Life Vehicles) Regulations, 2003 What is the current legal situation and how will these Regulations change things Legal Consultants.
Warsaw University of Technology Faculty of Civil Engineering, Mechanics and Petrochemistry High performance concrete with SCM and recycled.
Protection of tourists' rights in Russia Professor: Sara Landini Travel and Tourism Contracts, 2015 Design of Sustainable Tourism Systems By Irina Sorogina.
Worker Safety & Health Rule for DOE and DOE Contractors Ben McRae Office of General Counsel U.S. Department of Energy.
CONSTRUCTION WASTE RECYCLING Guided by Presented by Lija.M.Paul Anil Joseph Lecturer,CivilS7 Civil SNGCE Roll No:5 SNGCE.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
Export licensing of dual-use and military goods in the Russian Federation.
Contractor’s Exemption Legislative Act No
SPECIALTIES OF LEGAL AND CONTRACT WORK IN EPC/EPC(m)-PROJECTS
Seminar ”Environmental law clinic“ Banjaluka,
Lee Wilson, Wilson Partners Law
Technical Scope of Work
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
PEMPAL, Moscow, October 2016 Natalia Pilets Deputy Head,
9/18/2018 Bids CONTRACTING Khamis…..
Technical Scope of Work
Circular Economy -Public Consultation – Results
“The-best-of-2-worlds philosophy: developing local dismantling and global infrastructure network for sustainable e-waste treatment in emerging economies”
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
The Role of Private Sector in Capital Budgeting
THE FEDERAL LAW «ON STANDARDIZATION IN THE RUSSIAN FEDERATION»
REGULATORY ISSUES Federal Law No. 125-FZ of June 20, 2012 «On the donation of blood and its components». Order No. 183n. dated April 2, 2013 of the Ministry.
Presentation transcript:

Re-use, recycling and future of demolished buildings in Russia Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko Maria Tolkombaeva

Most of the buildings will be demolished sooner or later. In the process of work a lot of waste is formed.

What shall we do with these wastes? land filling recycling

Construction waste Consist of : 63% – crushed brick brick 26% – ferroconcrete items breakage items breakage

Construction wastes 11% – wood wastes and and scrap metal scrap metal

Procedure We need some Demolition permit Demolition permit Regulations for preparation and execution of earth-moving work

Procedure In order to demolish any building you need to implement the following procedure:  prepare the draft for demolition of the building,  get Demolition permit,

Procedure  move the people who are staying in the building and offices  make ready the territory for the demolition,  demolish the building

Procedure  clean up the territory,  remove and recycle construction wastes

Actual problems Customer must be sure that contractor has all the needed documents such as a Permission for operation with wastes

Re-using and recycling The rate of recycling of all dismantled construction material is only 1% There is no sorting of construction rubble at all

There are some open reasons: Lack of information about sources of materials, composition of materials, including information of specification, standards, legislation and performance Lack of information about sources of materials, composition of materials, including information of specification, standards, legislation and performance

High costs of transportation and material storage; High costs of transportation and material storage; Complications with legislation: it is necessary to convert construction rubble from the class of waste to the class of recyclable materials. Complications with legislation: it is necessary to convert construction rubble from the class of waste to the class of recyclable materials.

There are some variants such as facade preservation, but with the replacement of all inside, especially when we are talking about some historical buildings.

National laws and regulations The Federal Law ‘On waste production and consumption’ the ownership of the waste belongs to the owner of the material

An art. 751 of the Civil Code the ownership of the waste belongs to contractors and subcontractors

The Federal Law ‘On technical regulation’ the owner of the waste is the legal entity who is responsible for the areas where the wastes are located legally.

In each case, you need to control the contract because these civil rules are applied only if they satisfy contract terms or requirement

We should right one extra section in the contract: ownership and responsibility for the waste Conclusion

Thank you for your attention! attention!