Lean project management Johann Packendorff Ek dr, docent Kungl Tekniska Högskolan Skolan för Industriell teknik och management.

Slides:



Advertisements
Similar presentations
Building the Balanced Scorecard
Advertisements

Lean Manufacturing.
Project management Information systems for management1 Project Management.
Develop an Information Strategy Plan
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Philip J. Harkins-Linkage Implementation : Michael Malamatinas-Nike Hellas 10 Tactics for Leading in Hard Times.
JIT, TPS, and Lean Operations
A Maturity Model for Project Portfolio Management
Partner reward – a help or a hindrance to effective business development? Peter Scott Peter Scott Consulting
Baldrige Performance Excellence Program | 2015
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Strategy, Balanced Scorecard, and Strategic Profitability Analysis.
Just-in-Time and Lean Systems
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
INDUSTRIAL & SYSTEMS ENGINEERING
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Budgeting.
Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on down, simply by spending his money.
Engineering Management MSE507 Lean Manufacturing "There is only one boss: the customer. And he can fire everybody in the company, from the chairman on.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Managing Projects
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
Trade Management Sourcing & Optimising Strategies Module 8.
Chapter 19 OPERATIONS AND VALUE CHAIN MANAGEMENT © 2003 Pearson Education Canada Inc.19.1.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Overview of Lean Six Sigma
JIT and Lean Operations
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
ME2018 Leading temporary organizations and projects Course introduction.
Systems Analysis and Design in a Changing World, 6th Edition
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Value Analysis/ Flow Analysis
Lean Manufacturing Takeaways SCLC / ECC Spring Meeting April 26 th, 2007.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
Logistics and supply chain strategy planning
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
Philosophy and Key Concepts
Lean Manufacturing Chapter 15 pp June 29, 2012.
Software Engineering Saeed Akhtar The University of Lahore Lecture 8 Originally shared for: mashhoood.webs.com.
1. 2 Total quality management is a set of management practices throughout the organization, geared to ensure the organization consistently meets or exceeds.
STRATEGIC MANAGEMENT & BUSINESS POLICY 13TH EDITION
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
The Value Driven Approach
Lean Accounting and Productivity Measurement
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Introducing Project Management Update December 2011.
Strategic Planning Workshop  Presented by: Jason P Aubee.
Information, Analysis, and Knowledge Management in the Baldrige Criteria Examines how an organization selects, gathers, analyzes, manages, and improves.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
10-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Cross-Cutting Capabilities: Lean Operations,
© The Delos Partnership 2005 Dairygold Workshop Strategic Sourcing Process.
Copyright © 2013 Nelson Education Ltd. PowerPoint Presentations for Cornerstones of Cost Accounting First Canadian Edition Adapted by George Gekas Ryerson.
Projects, Programmes and Best Practice. Geoff Reiss.
Driving Value from IT Services using ITIL and COBIT 5 July 24, 2013 Gary Hardy ITWinners.
Productive and Lean Improvement Initiatives Team Champions Training 26 th July, :00 – 13:00 Parkland Hospital.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Lean Manufacturing. Lean Enterprise - A business system for organizing and managing product development, operations, suppliers and customer relations.
The Strategy Map Presentation Templates
Lean Manufacturing Series
Identify the Risk of Not Doing BA
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Presentation transcript:

Lean project management Johann Packendorff Ek dr, docent Kungl Tekniska Högskolan Skolan för Industriell teknik och management

Development trends Management Line-based operations Projects Line-based operations Project-based operations Line-based operations Industrialized Project operations Projects ?

Towards project portfolio management Mass manufacturing Project management MTM Toyota system TQM Lean manufacturing Scientific management Gantt schedules MBO Network planning Matrix organizations Critical chain PMBOK Certifications Project portfolio management OPM3 PM as core competence Lean eng. Stage-gate models Risk management PM offices

Benefits from Portfolio Management Alignment –Projects are aligned with business objectives Value –Focus on projects that deliver value to customers and shareholders Strategic –Focus on projects that increase the strategic capability Timeliness –More projects are completed on time and budget Balance –Portfolio has the right balance of high, medium and low risk projects Right Number –Portfolio has the right number of projects plus Develops Trust, Shared Vision and Communication with the Business Portfolio spend decreased by 10-40%(META) Portfolio spend decreased by 10-40%(META) Portfolio value maximised -increased by 2x to 3x (META) Portfolio value maximised -increased by 2x to 3x (META) Source: Portfolio Management for New Products, Cooper, Edgett, Kleinschmidt (Perseus Books, 2001)

Where does your organisation stand in relation to Portfolio Management? Excellent 1. Projects are aligned with business objectives 2. Portfolio contains very high value projects 1 Poor 3. Spending reflects the business strategy 4. Projects are done on time 5. Portfolio has good balance of projects 6. Portfolio has right number of projects Source: Portfolio Management for New Products, Cooper, Edgett, Kleinschmidt (Perseus Books, 2001) p149

Maturity levels for Portfolio Management… INITIALREPEATABLEDEFINED MANAGED OPTIMISING Ad Hoc Initiatives are selected for investment based on ad hoc processes. No overview is maintained of all investments Business cases may be needed for initiatives: Typically based on simple financial metrics. Business cases are considered in isolation. Once approved, there is no consistent or effective management and tracking of benefits. Making Lists Business cases are needed for most initiatives. Business cases are scored and assessed primarily on financial measures. An investment approval lifecycle is established and followed. But there are no effective processes to track the outcomes of investments and to manage the investment portfolio as a whole. Portfolio View Business cases are essential for all initiatives. The whole portfolio is captured and outcomes are tracked and reported, using basic measures of financial value, alignment, risk and initiative health. Refined Metrics Robust metrics of financial value, alignment, risk and health are established. Initiatives are categorised. Scorecards are used to summarise portfolio composition and health. Project selection is integrated with resource management. Portfolio management is pro-actively used as a means of aligning the portfolio to business strategy, through a cyclical investment process. Dynamic Execution There is feedback and continuous improvement. The portfolio is continuously monitored and adjusted to maximise its value. Portfolio management is no longer tied to cycles. Dynamic portfolio management is the accepted process. Initial tool implementation and investment capture. Extended metrics and scoring. Dynamic analysis and measurement. Value Capability

Key PMI Standards People Organizations Projects

The Symptoms We Regularly See Arising From Poor Portfolio Management Can’t kill projects Leads to.. Too many projects, resource collisions Quality of execution suffers Underestimation of risks and costs Projects not aligned to strategy Over budget Projects Late Business needs not met Lack of confidence (in IT) Results in.. Benefits not received Situation Reluctance to say no to projects Lack of Capacity Focus Projects are “sold” on emotional basis -- not selected No strong review process Overemphasis on Financial ROI No clear strategic criteria for selection

The ”evil circle” for project workers 1. Neglect of capacity issues Competition and rationalisation 2. Assumptions of organisational slack 3. Assumptions of high individual capacity 4. Too much work ordered to individuals 5. Success out of heoric action Market Organisation Individual Project

Lean Project Management

Points of departure Value = A capability provided to the customer at the right time and at an appropriate price, as defined in each case by the customer. Features of the product of service, availability, cost and performance are dimensions of value. Waste = any activity that consumes resources but creates no value.

Value-adding time Typically 90-95% of total lead time is non-value added Examples of non-value adding activities: - Overproduction - Excess inventory - Defects - Waiting - Underutilized people - Excess motion - Transportation

Lean manufacturing A manufacturing philosophy which shortens the time line between the customer order and the shipment by eliminating waste.

Lean Manufacturing

Order-to-Delivery Cycle Distri- Distri- bution and bution and Customer Customer Service Service Custo-merPlacesOrderOrderEntryEngi-neeringDesignSched-ulingManufacturing Lead Times Purchasing Manufacturing Cumulative Lead Time Order-to-Delivery Cycle

Lean manufacturing focuses on eliminating waste in processes Lean manufacturing is not about eliminating people Lean production is about expanding capacity by reducing costs and shortening cycle times between order and ship date Lean is about understanding what is important to the customer

Lean thinking Specify value - can only be done by the ultimate customer Identify the value stream - exposes the enormous amounts of waste Create flow - reduce batch size and WIP Let the customer pull product through the value stream - make only what the customer has ordered Seek perfection - continuously improve quality and eliminate waste

Non-blaming culture Problems are recognized as opportunities - It is OK to make legitimate mistakes - Problems exposed due to trust People are not problems, they are problem solvers - Find solutions, do not ask ”who did it” and ”how shall we punish him/her?”

View on profits Old way: Price = cost + profit New way: Price – cost = profit

Uncovering Production Problems QualityProblems MaterialShortages MachineBreakdowns WorkloadImbalances WorkerAbsenteeism Out-of-SpecMaterials QualityProblems In-ProcessInventory l We must lower the water level! Visible Production Problems are Only 5% of the Total!

Implementation success factors Prepare and motivate people Employee involvement Share information and manage expectations Identify and empower champions Strategic alignment of lean initiatives Ask WHY? At least 6 times Deep commitment to excellence Atmosphere of experimentation Wise and realistic measurement and reward systems Implement pilot projects and market quick wins

Evicence of progress Smaller lot sizes Increased capacity/throughput Higher inventory turns More available floor space Improved workplace organization Improved quality Reduced inventories Reduced lead times Greater gross margin Improved participation and morale

(1) Waste from overproduction (2) Waste of waiting time (3) Transportation waste (4) Inventory waste (5) Processing waste (6) Waste of motion (7) Waste from product defects Waste--Operations

Individual effectiveness Wheelwright & Clark (1992)

Three kinds of time 1.Calendar time: The actual duration of a task from start to finish 2.Work time: The percentage of the calendar time that resources are available 3.Value-added time: The amount of work time that is actually value-added, i.e. that something is done during that time that the customer will gladly pay for.

Principles of lean project management 1.Precisely specify the value of each project 2.Identify the value stream for each project 3.Allow value to flow without interruptions 4.Let the customer pull value from the project team 5.Continuously pursue perfection

1. Precisely specify the value of each project Value is anything that a customer will gladly pay for Internal and external customers An activity on a project is value-added if it transforms the deliverables of the project in such a way that the customer recognizes the transformation and is willing to pay for it. Get rid of excessive hidden features, excessive complexity. Use one-page project summaries.

2. Identify the value stream for each project Every task within a project should be directed toward creating deliverables (i.e. outcomes with a customer value). The sequence of activities producing the project’s deliverables is the project’s value stream. Value stream mapping – focusing on assumed high-waste segments

3. Allow value to flow without interruptions A started project represent accumulating value Projects that are kept queuing or waiting represents waste. Projects are resource constrained, not time constrained. Think ”critical chain” instead of ”critical path”! Do not start projects ASAP, start them when there are available resources. Starting a project sooner does not mean it will end sooner. Construct reservation systems for key resources. Use dedicated resources, calculated buffers, identify bottlenecks. Never use FIFO, always make priorities. Use just-in-time decision making, just-in-time information flows and urgent stand-up-meetings

Critical path thinking Identify logical task flow in order to see what path of activities is the longest. By making sure all activities on the critical path is performed on time, the project as a whole will be delivered on time. Activities should be given time estimations and the started ASAP in order to keep the deadline. Problem: Resources often forgotten, high risk of delay when overloading resources

Critical chain thinking After identifying the critical path, one must also consider the resources necessary to perform these activities. The critical chain is the longest path through the project after resource leveling, i.e. making sure that each resource are used no more and no less than its availability. In the critical chain, buffers are used to handle variations – if not you must estimate each activity at its worst case duration. Otherwise there will be collisions => bottlenecks => delays

The critical path uncovered

Resource leveraged critical path

Resource leveraged critical path with 50% duration reduction and buffers

Buffer management

Buffer management at portfolio level

Obstacles to the value flow Functional departments. Lack of resources (caused by bad resource planning or project collisions) imply bottlenecks, queues and waiting times. Executive gate meetings and sequential approval cycles. Fire fighting and expediting. Changing requirements. Managerial interference i.e. organizational problems causing both waste and human irritation!

4. Let the customer pull value from the project team Each deliverable in a project has a downstream customer. That customer must be identified and activated as a demanding recipient of the deliverable. Tasks are linked to each other, not dependent. Customers are involved in the execution of the task from the beginning and are expected to provide frequent review and feedback Customers are expected to participate in stage- freeze-processes

5. Continuously pursue perfection Continuous efforts are required for the maintenance of a lean project management system. Teams must be persistently intolerant to waste.

For each theme Introductory lecture, ended by a set of discussion questions Set of articles published at the course homepage or handed out in paper format Hand-in of group report, containing (1) literature review, (2) group’s opinions/answers to discussion questions Plenary discussion seminar, all groups expected to be able to make short presentations and participate actively, following the instructions of the lecturer Of the five questions in the final written exam, at least four will be identical with discussion questions raised during the course

Discussion questions for April 13th Each group shall make short summaries of the literature and be prepared to present this summary in class (about 4 pages) Give examples of the seven wastes as applied to (1) a construction project, (2) a corporate training project Formulate five arguments for, and five arguments against, the application of lean thinking to project management Consider the five principles of lean project management in this lecture. For each principle, identify at least two success factors to make the principle work in practice If you succeed to implement lean project management, what would be the unwanted consequences of this success – i.e., what do you not want to happen? All summaries and answers/reflections to questions shall be handed over to Johann in paper format at the beginning of the seminar. Use the standardised cover form!!!