Baudette, Minnesota/Rainy River, Ontario International Bridge

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

HELP !!!!!! International border bridge located over the Rainy River on the Minnesota Trunk Highway 72 and Ontario Provincial Highway 11 This route provides.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Briefing for the Transportation Border Working Group November 8,
Environmental Project Commitments The Alberta Experience
The Ohio Department of Transportation’s work to preserve low-volume bridges in place or to move to trails (and thereby avoid a Section 106 Adverse Effect)
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
Duane Hill, District Engineer
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
1 Detroit River International Crossing (DRIC) New International Trade Crossing (NITC) Transportation Border Working Group April 24, 2013.
SYNTHESIS OF TRANSPORTATION EXCLUSIONS TO SECTION 106 REVIEW April 2015.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Calais, ME-St. Stephen,NB Border Crossing Project A Case Study.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
Cross Border Rail Passenger Service Transportation Border Working Group Buffalo, New York – April 8, 2014.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
MNR’s Role in Public Safety Around Dams –An Overview
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
U.S. Department of Transportation Federal Highway Administration Transport Transports Canada Canada Transportation Border Working Group New York State.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
1 ARKANSAS RECREATIONAL TRAILS PROGRAM August 10, 2012.
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Public Border Operators Association Border Infrastructure Project Updates United States – Canada Transportation Border Working Group Meeting October 27.
Southwestern Ontario Border Wait Time Project Update Mike Barnet, P.Eng Intelligent Transportation Systems Program Ministry of Transportation of Ontario.
Enhancing Partnerships in Support of the Maritime Sector: An Overview of Transport Canada Initiatives 20 th CMC Towboat Conference May 25, 2013.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
1 Update: July 7 th, 2016 Investing in the Rideau Canal Bobs Lake Dam Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Lions, Tigers, Coast Guard Permits – Oh My!
Approaches to Historic Bridge Rehabilitation Case Study #3
STATUS OF GSA NORTHERN BORDER PROJECTS
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Blatnik Bridge Management Study
Highway 14 – Owatonna to Dodge Center District 6 Update
Disaster Recovery.
Infrastructure: Property and Tower Challenges
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
May 8, 2018 Marion Werkheiser, Cultural Heritage Partners
Infrastructure: Property and Tower Challenges
Protecting What We Love Building What We Need – The “H” Factor
Harbour Island Force Main Replacement
The National Environmental Policy Act (NEPA)
Disaster Recovery.
I Street Bridge Replacement Project
Presentation transcript:

Baudette, Minnesota/Rainy River, Ontario International Bridge

Location

Location US and Canadian Customs facilities are at each end of the bridge approach Alignment on US side made challenging by US Customs equipment, City park, substation and archeological sites Alignment on Canadian side expected to be less affected by Customs location, but archeological and other issues may still exist

History This bridge provides access to Baudette, Minnesota and Rainy River, Ontario, a connection between the United States and Canada as well as a full-service, 24-hour Port of Entry Originally built in 1959 by the Cities of Baudette, MN and Rainy River, ON The bridge has a total length of 1,285 feet and accomodates a 2-lane roadway with a width of 24 feet and an open grate steel deck Operated locally as a toll bridge until 1988, when ownership was taken over by the Minnesota Department of Transportation (MnDOT) and the Ministry of Transportation, Ontario (MTO)

Project Purpose The current project was initiated to address structural issues and the long-term need to continue providing a safe and reliable river crossing at this location The bridge is classified as fracture critical (non redundant)

Wooden Walkway

Open Steel Deck

Floor Beam Corrosion

Low Vertical Clearance

Project Details Bridge was found ineligible for inclusion on the Ontario Heritage Bridge List MTO provided a position paper to the MnDOT stating MTO does not consider rehabilitation viable

Project Details Bridge is eligible for the National Register of Historical Places in the United States MnDOT is nearly complete with its rehabilitation study Next steps will be to work through Section 106 of the National Historic Preservation Act and likely Section 4(f) of the Department of Transportation Act

Project Details In the meantime, concurrent work has begun looking at replacement Initial discussions were focused on developing project separately This approach potentially solved some of the bureaucratic concerns, but it created others……

Project Details Current approach is to have MnDOT lead (with close coordination with MTO) the environmental documentation, preliminary design, structure type study and early stakeholder coordination of the project Work is underway to develop a cost-sharing agreement Consultant will be required to either have offices in both the US and Canada, or at least partnering with approved firms on both sides of the border Handling of detail design and construction will be decided in the future

Project Details Presidential Permit not required Congressional Authorized Bridge under International Bridge Act of 1972 Existing owners of congressional authorized bridges may replace, repair or expand their existing bridges without further State Department approval Early consultant effort ongoing Compile agency stakeholder list with contact information Compile list of permits/approvals needed Anticipated duration for obtaining permits/approvals Comparison of design standards/requirements between MnDOT and MTO

Project Details Potential Agency Stakeholders: MN SHPO MN DNR USACE FHWA US Customs US State Department US Coast Guard GSA Ontario Ministry of the Environment Department of Fisheries and Oceans Division of Water Quality Ontario Ministry of Natural Resources First Nations Transport Canada, Navigable Waters Canadian Border Service Agency

Project Timeline A detailed critical path schedule has been developed Schedule shows 300 days of float given a late summer 2013 consultant notice to proceed and letting date of November 2017 Project needs to be let no later than April 2018 to take advantage of Minnesota bonding dollars Current schedule only includes MnDOT processes Need to allow procurement time for detail design consultant

Questions??