IV Convegno Nazionale Fisica ALICE, Palau, 28.09.2008 Andrea Dainese 1 Cosmics in ITS: tracking & alignment A.Dainese (INFN Legnaro) ITS alignment group:

Slides:



Advertisements
Similar presentations
Outline  motivations  methods: ITS: TPC+ITS(-1 layer) tracks SPD: SPD standalone  tracklets  strategy with data  conclusions Studi di Efficienza dell’ITS.
Advertisements

Multiplicity analysis and dN/d  reconstruction with the silicon pixel detector Terzo Convegno Nazionale sulla Fisica di ALICE Frascati (Italy) – November.
D. Elia, INFN BariALICE Offline Week - June Recent results from SPD beam test D. Elia, R. Santoro INFN Bari ALICE Collaboration - SPD Group.
III Convegno sulla Fisica di ALICE. Frascati 1 Vertex reconstruction and selection strategies for D s detection in Pb-Pb collisions Sergey Senyukov,
Terzo Convegno sulla Fisica di ALICE - LNF, Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group.
TPC status Marian Ivanov. Outlook TPC performance ExB correction Alignment Nonlinearities and edge effects Drift velocity calibration.
Measuring momentum at the TIF David Stuart, UC Santa Barbara June 25, 2007.
October 20th, 2006 A. Mazzacane 1 4 th Concept Software First Results.
ALICE HLT High Speed Tracking and Vertexing Real-Time 2010 Conference Lisboa, May 25, 2010 Sergey Gorbunov 1,2 1 Frankfurt Institute for Advanced Studies,
MC Study on B°  J/  ° With J/      °     Jianchun Wang Syracuse University BTeV meeting 03/04/01.
STAR Collaboration Meeting, Nantes, July2002 SVT Analysis/Status Update Jun Takahashi – University of Sao Paulo.
SSD offline status Offline week CERN, 7 July 2008 Enrico Fragiacomo on behalf of ALICE SSD.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Muon alignment with Cosmics: Real and Monte Carlo data S.Vecchi, S.Pozzi INFN Ferrara 37th Software Week CERN June 2009.
ITS Alignment: Millepede Results S. Moretto, C. Bombonati, A. Dainese, M. Lunardon, A. Rossi.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Offline Wek, CERN, April 2008 Andrea Dainese 1 Status of ITS tracking A. Dainese (INFN Legnaro)
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
Muon-raying the ATLAS Detector
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
Tracking, PID and primary vertex reconstruction in the ITS Elisabetta Crescio-INFN Torino.
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Louis Nicolas – LPHE-EPFL T-Alignment: Track Selection December 11, 2006 Track Selection for T-Alignment studies Louis Nicolas EPFL Monday Seminar December.
T-Station Alignment Infrastructure at LHCb Adlène Hicheur (Ecole Polytechnique F é d é rale de Lausanne) T-Station Alignment group: J.Blouw, F.Maciuc,
Status of global tracking and plans for Run2 (for TPC related tasks see Marian’s presentation) 1 R.Shahoyan, 19/03/14.
1 SDD offline status Francesco Prino INFN sezione di Torino ALICE offline week – March 15th 2010.
Marian Ivanov TPC ExB and V drift calibration and alignment.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Roberto Barbera (Alberto Pulvirenti) University of Catania and INFN ACAT 2003 – Tsukuba – Combined tracking in the ALICE detector.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
CMS Torino meeting, 4 th June, 2007 R. Castello on behalf of Torino Tracker’s group Tracker Alignment with MillePede.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
3rd LHC Detector Alignment WS - CERN, Andrea Dainese 1 Impact of misalignment on track and heavy-flavour reconstruction with the ALICE detector.
Results from the commissioning of the ALICE Inner Tracking System with cosmics Francesco Prino (INFN – Sezione di Torino) for the ALICE COLLABORATION QM.
Massimo Masera, Andrea Dainese, Domenico Elia, Francesco Prino Offline Week – 15/11/2010 ITS offline status.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 Status of Tracker Alignment b-tagging Workshop Nhan Tran (JHU) On behalf of the Tracker Alignment Group.
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
ITS Alignment 15/01/2008 Adam Jacholkowski1 ITS story (since the last meeting) from the alignment perspective (alias – reducing the gap between simulation.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
D. Elia (INFN Bari)Offline week / CERN Status of the SPD Offline Domenico Elia (INFN Bari) Overview:  Response simulation (timing info, dead/noisy.
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
INFN - PadovaBeauty Measurements in pp with the Central Detector 1 Beauty Measurements in p-p with the Central Detector F. Antinori, C. Bombonati, A. Dainese,
Commissioning of the Silicon Strip Detector (SSD) of ALICE Panos Christakoglou a,b for the ALICE Collaboration a NIKHEF b Utrecht University
CALIBRATION: PREPARATION FOR RUN2 ALICE Offline Week, 25 June 2014 C. Zampolli.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
ITS alignment using Millepede:
Hisaki Hayashii (NWU, Japan) for the Belle collaboration
11th ICATPP Conference on
Primary vertex reconstruction with the SPD
First data from TOTEM experiment at LHC
FURTHER STUDIES ON COMMISSIONING DATA
Beam Gas Vertex – Beam monitor
The Silicon Drift Detector of the ALICE Experiment
Studies for Phase-II Muon Detector (|η| = ) – Plans
Workshop “MC for the LHC” - CERN
CMS Tracker Alignment with Cosmic Data and Strategy at the Startup
Preparation for ITS alignment
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
LHCb Alignment Strategy
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The LHCb VErtex LOcator
Presentation transcript:

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 1 Cosmics in ITS: tracking & alignment A.Dainese (INFN Legnaro) ITS alignment group: LNL, PD, TS, CT, TO, Nikhef

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 2 Layout ITS alignment strategy Cosmics reconstruction in ITS Summer cosmics sample for alignment First alignment results: Millepede Iterative residuals minimization Alignment monitoring First attempts of TPC-ITS matching  S.Moretto

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 3 Inner Tracking System (ITS) Silicon Pixel Detector (SPD): ~10M channels 240 sensitive vol. (60 ladders) Silicon Drift Detector (SDD): ~133k channels 260 sensitive vol. (36 ladders) Silicon Strip Detector (SSD): ~2.6M channels 1698 sensitive vol. (72 ladders) SPD SSD SDD ITS total: 2198 alignable sensitive volumes  d.o.f.

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 4 ITS detector resolutions & target alignment precisions Residual: expected misalignment left after applying the realignment procedure(s). Target ~0.7  resol.  ~20% degradation of the resolution SPD (r = 4 & 7 cm) SDD (r = 14 & 24 cm) SSD (r = 39 & 44 cm) nom. resolutions x loc  (y loc )  z loc [  m 3 ] 12  (0)   (0)  2020  (0)  830 residual mis. (shifts) x loc  y loc  z loc [  m 3 ] 10  10  2020  20  2015  15  100 y loc z loc x loc detector local c.s.: x loc ~r  glob, y loc ~r glob, z loc = z glob

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 5 ITS alignment with tracks: general strategy Data sets: cosmics + first pp collisions (and beam gas) use cocktail of tracks from cosmics and pp to cover full detector surface and to maximize correlations among volumes Start with B off, then switch on B (pp)  possibility to select high-momentum (no multiple scattering) tracks for alignment General strategy: 1)start with layers easier to calibrate: SPD and SSD  good resol. in r  (12-20  m), worse in z (  m) 2)global ITS alignment relative to TPC (already internally aligned) 3)finally, inclusion of SDD, which need longer calibration (interplay between alignment and calibration) Two independent track-based alignment methods in preparation: global: Millepede (ported to ALICE for muon arm alignment) local: iterative method based on residuals minimization

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 6 Cosmics! 1st muon in SPD: Feb 17, 2008

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 7 Tracking cosmics in ITS Cosmics tracking in ITS: adapted stand-alone ITS tracking (Torino) enlarged search windows to account for large misalignments start from “fake” vertex built from the two tracklets in inner two layers ESD file with track space-points Tree with Selected Space points Alignment procedures Reconstruction - select tracks (p t, , , #points) - can merge 2 cosmics tracks

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 8 AND Cosmics with SPD trigger Pixel FastOR trigger since May 25: first side C, then also side A Trigger configuration: rate: 0.05 Hz (June)  0.18 Hz (Aug) purity (reconstructed with 3-4 cls/triggered): about 30% about 85% of SPD taking data in August Statistics collected (till Sept 3rd): about 55k good events events with 4-cls in SPD: 30k events with 3-cls in SPD: 25k

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 9 ITS points

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 10 Cosmics statistics (SPD) 220/240 (92%) modules with at least one hit 200/240 (83%) modules with at least 50 hits

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 11 Cosmics statistics (SDD) Low statistics on inner layer (switched on later than outer) Limited statistics on the sides (outer layer: about 50% of modules have sufficient statistics to try alignment)

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 12 Cosmics statistics (SSD) Limited statistics on the side and edges in z aligned in Millepede down to the ladder level: about 55/72 ladders have sufficient statiscs

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 13 SPD Millepede alignment quite advanced Most of the detectors that are currenltly switched on have some alignment Alignment of side detectors may be less realiable  need quick checks with first pp data! SDD Calibration of time offset is in progress (Torino) Use Alignment Monitoring tool for validation (C.Bombonati) Almost ready to be included Survey (modules on ladders) is ready to be used (M.Poghosyan) SSD Included in Millepede since mid-July Alignment exercises usefull to spot / understand possible problems in geometry / hardware Survey (modules on ladders) ready to be used  S.Moretto

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 14 Checking the quality of realignment Main variable: track-to-track  x at y=0 Acceptance overlaps  “extra” clusters Alignment monitoring tool x y

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 15 Millepede SPD realignment:  x at y=0 realigned not realigned Sim, ideal geom: 43  m DATA: 56  m   spatial =15  m   spatial =11  m (Sim) Expected spread

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 16 Millepede SPD realignment: “extra” clusters realigned not realigned Sim, ideal geom: 15  m DATA: 22  m   spatial =16  m   spatial =11  m (Sim) Expected spread

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 17 Alignment Monitoring: SPD Track fit + residuals analysis Check and monitor in time the quality of realignment (try to “guess” high-level or correlated misalignments) MillepedeIdeal sim. x residual [cm] x residual C.Bombonati, A.Rossi  =70  m  =44  m Mille/Sim ~ 70/44 ~ 22/15 extra clusters

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 18 ITS alignment with tracks: iterative local method Alignment params from minimization of track-to-points residuals Local: works on a module-by-module basis Iterations are used to take into account correlations between the alignment params of different modules difficult with SPD alone: only 4 points (modules) per track about 50% worse than Millepede; difficult to account for correlations A.Rossi

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 19 SDD: time0 calibration and alignment Residuals: fit su SPD+SSD residuals su SDD (up, down) Not indep. of misalignment -130  m-10  m C.Garcia, C.Bombonati Complementary procedure: estimate time0 from minimum time (F.Prino)

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 20 TPC-ITS matching with large misalignment/miscalibration Misalignments (internal & TPC vs ITS) and miscalibration (drift velocity, time0, ExB) reduce matching efficiency A set of knobs to enlarge track/cluster errors should allow to recover the efficiency TPC: add systematic errors (drift velocity, time0, ExB) to the track covariance matrix before prolongation to ITS ITS: add misalignment errors to cluster errors (~ 1 mm) Matching efficiency (prel.): TPC+ITS (  4cls) / ITSsa (  4cls) B=0: >90% B=0.5T (enlarged errors): ~85%

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 21 B=0.5 T cosmics in ITS+TPC p T = 1 GeV p T = 0.2 GeV p T = 2 GeV noise SDD ora risolto

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 22 Check of ITS alignment with ITS+TPC tracks, B=0.5 Use Millepede realignment SPD+SSD Track-to-track distance  x pull =  x / √  top 2 +  bottom 2 ITS+TPC SPD+SSD+TPC mean 6  m  = 54  m 3or4 + 3or4 ITS points

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 23 Summary Large sample of cosmics collected during Summer SPD FastOR trigger gave a big boost All alignment machinery (reconstruction, realignment, monitoring) working from the very beginning Good results from Millepede Most of SPD realigned to  10  m need cross-checks with pp, especially on the side Started to include SSD (limited statistics for cosmics) SDD will come soon Next step: ITS-TPC alignment need to understand TPC calibration first...

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 24 EXTRA SLIDES

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 25 Primary Vertex B e X d0d0 rec. track Impact of ITS misalignment on tracking performance Effect of misalignment on d 0 (and p t ) resolutions studied by reconstructing misaligned events with ideal geometry Estimated effect on D 0  K  significance A.D, A.Rossi null residual full full+

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 26 Millepede: cross-checks (3) Use  -acceptance overlaps in SPD (“extra” clusters) Check on simulation with ideal geometry:  (  xy) = 15  m  (  z) = 165  m outer SPD layer: “extra” clusters not (yet) used for realignment  cross-check

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 27 Millepede: cross-checks (3) Use  -acceptance overlaps in SPD (“extra” clusters) Check on simulation with ideal geometry:  (  xy) = 22  m  (  z) = 163  m high-stats sectors selected outer SPD layer: raw realigned