McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8.

Slides:



Advertisements
Similar presentations
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Advertisements

Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.
Developing a Project Plan
RESOURCES Roger D. H. Warburton © Kanabar / Warburton,
12-1 Resource Management Chapter 12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Resource Management Chapter 12.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
Project Management Cost and Resources
Project Management: A Managerial Approach
Software project management (intro) Resource allocation.
6 Resource Utilization Teaching Strategies
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
MANAGING PROJECT RESOURCES
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
Allocating Resources to the Project
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Lean Project Management
Quick Recap.
1 ISE Ch. 8 pt. 2 Resource-constrained scheduling: Computer demonstration EMR Project  The development of a handheld electronic medical reference.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
12-1 Resource Management Chapter 12 © 2007 Pearson Education.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Scheduling Resources and Costs
Chapter 16 – Project Management
Scheduling Resources and Costs
Project Management -- Scheduling Resources and Costs
Scheduling Resources and Costs
Chapter 8 Scheduling Resources.
ENGINEERING MANAGEMENT (GE 404)
Scheduling Resources CHAPTER EIGHT. Scheduling Resources CHAPTER EIGHT.
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Manajemen Industri Teknologi informasi
Scheduling Resources and Costs
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Scheduling Resources and Costs
Presentation transcript:

McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8

8-2

8-3 The Resource Problem  Resources and Priorities  Project network times are not a schedule until resources have been assigned. oThe implicit assumption is that resources will be available in the required amounts when needed. oAdding new projects requires making realistic judgments of resource availability and project durations.  Resource-Constrained Scheduling  Resource leveling (or smoothing) involves attempting to even out demands on resources by using slack (delaying noncritical activities) to manage resource utilization.

8-4 Types of Project Constraints  Technical or Logic Constraints  Constraints related to the networked sequence in which project activities must occur  Resource Constraints  The absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities

8-5 Constraint Examples FIGURE 8.2

8-6 Kinds of Resource Constraints  People  Materials  Equipment  Working Capital

8-7 Classification of a Scheduling Problem  Classification of Problem  Using a priority matrix will help determine if the project is time or resource constrained  Time Constrained Project  A project that must be completed by an imposed date oTime is fixed, resources are flexible: additional resources are required to ensure project meets schedule.  Resource Constrained Project  A project in which the level of resources available cannot be exceeded oResources are fixed, time is flexible: inadequate resources will delay the project.

8-8 A Third Constraint: Physical

8-9 Resource Allocation Methods  Limiting Assumptions  Splitting activities is not allowed—once an activity is start, it is carried to completion.  Level of resource used for an activity cannot be changed.  Activities with the most slack pose the least risk.  Reduction of flexibility does not increase risk.  The nature of an activity (easy, complex) doesn’t increase risk.

8-10 Resource Allocation Methods (cont’d)  Time-Constrained Projects  Projects that must be completed by an imposed date  Require the use of leveling techniques that focus on balancing or smoothing resource demands by using positive slack (delaying noncritical activities) to manage resource utilization over the duration of the project oPeak resource demands are reduced. oResources over the life of the project are reduced. oFluctuation in resource demand is minimized.

8-11 Botanical Garden FIGURE 8.3

8-12 Botanical Garden (cont’d) FIGURE 8.3 (cont’d)

8-13 Resource Allocation Methods (cont’d)  Resource Demand Leveling Techniques for Time-Constrained Projects  Advantages oPeak resource demands are reduced. oResources over the life of the project are reduced. oFluctuation in resource demand is minimized.  Disadvantages oLoss of flexibility that occurs from reducing slack oIncreases in the criticality of all activities

8-14  Resource-Constrained Projects  Projects that involve resources that are limited in quantity or by their availability  Scheduling of activities requires the use of heuristics (rules-of-thumb) that focus on: 1.Minimum slack 2.Smallest (least) duration 3.Lowest activity identification number  The parallel method is used to apply heuristics. oAn iterative process that starts at the first time period of the project and schedules period-by-period any activities scheduled to start using the three priority rules Resource Allocation Methods (cont’d)

8-15 Resource-Constrained Schedule through Period 2–3 FIGURE 8.4

8-16 Resource-Constrained Schedule through Period 2–3 FIGURE 8.4 (cont’d) ES resource load chart

8-17 Resource-Constrained Schedule through Period 2–3 FIGURE 8.4 (cont’d) Resource-constrained schedule through period 2–3

8-18 Resource-Constrained Schedule through Period 5–6 FIGURE 8.5 Resource-constrained schedule through period 5–6

8-19 Resource-Constrained Schedule through Period 5–6 FIGURE 8.5 (cont’d) Final resource-constrained schedule

8-20 Resource-Constrained Schedule through Period 5–6 FIGURE 8.5 (cont’d) New, resource-constrained network

8-21 Computer Demonstration of Resource-Constrained Scheduling  EMR Project  The development of a handheld electronic medical reference guide to be used by emergency medical technicians and paramedics  Problem  There are only eight design engineers who can be assigned to the project due to a shortage of design engineers and commitments to other projects.

8-22 EMR Project: Network View of Schedule before Resources Leveled FIGURE 8.6

8-23 EMR Project before Resources Added FIGURE 8.7

8-24 EMR Project—Time Constrained Resource Usage View, January 15–23, 2005 FIGURE 8.8A

8-25 Resource Loading Chart for EMR Project, January 15–23, 2005 FIGURE 8.A8B

8-26 EMR Project Network View Schedule after Resources Leveled FIGURE 8.9

8-27 EMR Project Resources Leveled FIGURE 8.10

8-28 The Impacts of Resource- Constrained Scheduling  Reduces delay but reduces flexibility  Increases sensitivity of the network  Increases scheduling complexity  May make traditional critical path no longer meaningful  Can break sequence of events  May cause parallel activities to become sequential and critical activities with slack to become noncritical

8-29 Splitting/Multitasking  Splitting/Multitasking  A scheduling technique use to get a better project schedule and/or increase resource utilization oInvolves interrupting work on an activity to employ the resource on another activity, then returning the resource to finish the interrupted work oIs feasible when startup and shutdown costs are low oIs considered the major reason why projects fail to meet schedule

8-30 Splitting/Multitasking FIGURE 8.11

8-31 Assigning Project Work  Factors to Consider in Assigning Work:  Don’t always pick the same people for the toughest assignments.  Choose people with an eye to fostering their development through participation on the project.  Pick people with compatible work habits and personalities but who complement each other.  Team-up veterans with new hires to share experience and socialize newcomers into the organization.  Select people who may need to learn work together on later stages of the project or other projects.

8-32 Multiproject Resource Schedules  Multiproject Scheduling Problems  Overall project slippage oDelay on one project creates delays for other projects.  Inefficient resource application oThe peaks and valleys of resource demands create scheduling problems and delays for projects.  Resource bottlenecks oShortages of critical resources required for multiple projects cause delays and schedule extensions.

8-33 Multiproject Resource Schedules  Managing Multiproject Scheduling  Create project offices or departments to oversee the scheduling of resources across projects.  Use a project priority queuing system: first come, first served for resources.  Centralize project management: treat all projects as a part of a “megaproject.”  Outsource projects to reduce the number of projects handled internally.

8-34 Creating a Time-Phased Budget FIGURE 8.12

8-35 Creating a Time-Phased Budget (cont’d) FIGURE 8.13

8-36 Creating a Time-Phased Budget (cont’d) FIGURE 8.14

8-37 Creating a Time-Phased Budget (cont’d) FIGURE 8.15

8-38 Creating a Time-Phased Budget (cont’d) FIGURE 8.16

8-39 Monthly Cash Flow Statement FIGURE 8.17

8-40 Resource Usage Table FIGURE 8.18

8-41 Key Terms Heuristic Leveling/smoothing Planned value (PV) Resource-constrained projects Resource profile Splitting Time-constrained projects Time-phased baseline

8-42 Critical Chain Project Management (CCPM)  Critical Chain Project Management is a method of planning and managing projects that puts more emphasis on the resources required to execute project tasks.  This is in contrast to the more traditional Critical Path and PERT methods, which emphasize task order and rigid scheduling.

8-43 Why, if there is a tendency to overestimate activity durations and add safety to a project, do so many projects come in behind schedule?  Parkinson’s Law  Self-protection  Dropped baton  Excessive multi-tasking  Resource bottlenecks  Student syndrome (procrastination)

8-44 CCPM in Action 50/50 Estimates  Three Kinds of Buffers  Project – at the end of project to absorb delays  Feeder – where noncritical paths merge with the critical chain to protect critical chain from delays  Resource – where scarce resources are need to insure they are available

8-45 Air Control Project w/o Resources FIGURE A8.1A

8-46 Air Control Project: Gantt Chart w/o Resources FIGURE A8.1B

8-47 Air-Control Project w/ Limited Resources FIGURE A8.2A

8-48 Air Control Project: Gantt Chart w/ Limited Resources FIGURE A8.2B

8-49 Air Control Project: CCPM Network FIGURE A8.3

8-50 Air Control Project: CCPM Gantt Chart FIGURE A8.4

8-51 CCPM: Project Buffer Management FIGURE A8.5

8-52 Critical Chain Project Management (CCPM)  Critical Chain is the sequence of both precedence- and resource-dependent activities that prevents a project from being completed in a shorter time, given finite resources.  If resources are always available in unlimited quantities, then a project's critical chain is identical to its critical path.