Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

Chapter 17 Project Management McGraw-Hill/Irwin
Chapter 13 Project Scheduling: PERT/CPM
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
Operations Management Session 27: Project Management.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
MGMT 483 Week 8 Scheduling.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Project Scheduling. SEEM Project Scheduling (PS) To determine the schedules to perform the various activities (tasks) required to complete the project,
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
ME 380 Project Planning. Critical Path Method (CPM) Elements: Activities & Events Feature: Precedence relations ActivityDurationPrecedence A4- B5- C3A.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Management CPM, PERT, Crashing – An Illustrative Example
Real-World Project Management Chapter 13. Characteristics of Project Management Unique one-time focus –Difficulties arise from originality Subject to.
Network Problem CPM & PERT
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
PROJECT MANAGEMENT Approaches
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Planning with PERT and CPM Chapter 14
Session 25 University of Southern California ISE514 November 17, 2015 Geza P. Bottlik Page 1 Outline Questions? Exam results – very good 19 grades improved.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Chapter 7 : Risk Management – part 2
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
IE 366 Chapter 6, Section 10 Project Planning and Scheduling.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PERT and CPM.
Basic Project Scheduling
Project Planning & Scheduling
Project Management and scheduling
Project Planning & Scheduling
Basic Project Scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Project Management Operations -- Prof. Juran.
Chapter 16 – Project Management
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Presentation transcript:

Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical Path Method“ PERT: „Project Evaluation and Review Technique“

PERT/CPM 4 Phases: Planning of activities Sequencing of activities Time, resource and cost management Controlling

Planning/Sequencing of Activities Representation of activities using arcs Representation of events using nodes An „event“ is a point in time where some activities end and others begin. Each activity is uniquely determined by its start event and its end event.

Planning/Sequencing of Activities Rules for setting up PERT/CPM networks: Rule 1: Each activity is represented by one and only one arc. Rule 2: For each pair of nodes, there is at most one activity connecting these nodes (if necessary, use dummy activities to express precedence relations)

Planning/Sequencing of Activities Rules for setting up PERT/CPM networks: Rule 3: To ensure correct modelling of precedence relations, always consider the following when adding an activity to a PERT/CPM network: a) Which activities must end exactly before the new activity can begin? b) Which activities immediately follow the new activity? c) Which activities can be carried out simultaneously?

Example Set up a PERT/CPM network consisting of the activities A-L, such that the following conditions are satisfied: 1. A, B and C (the first activities of the project) may start simultaneously. 2. A and B precede D. 3. B precedes E, F and H. 4. F and C precede G. 5. E and H precede I and J. 6. C, D, F and J precede K. 7. K precedes L. 8. I, G and L are the terminal activities of the project.

Example Indicate how each of the following additional relations can be incorporated in the network 1. A and B precede G. 2. D precedes G. 3. C precedes D.

Critical Path Calculations Forward pass: compute earliest times for events Backward pass: compute latest times for events Compute slacks and find critical path Activities on the critical path are referred to as „critical activities“, all others as „uncritical activities“

Critical Path Calculations E i...earliest time for event i, i.e., the earliest starting time for all activities rooting in i (usually: E 0 =0) t ij... Duration of activity (i,j) Forward pass: for all activities ending in j:

Critical Path Calculations L i...latest completion time of all activities ending in node i (usually L n =E n, with n the last event in the project) Backward pass: for all activities starting in i:

Critical Path Calculations The slack for an event is the difference between its latest and its earliest times. The slack for an activity (i,j) is L j -E i -t ij. A critical path for a project is a path through the network such that all the activities on this path have zero slack.

Example Consider the following project network. Assume that the time required for each activity is a predictable constant and that it is given by the number along the corresponding arc. Find the earliest time, latest time and slack for each event as well as the slack for each activity. Also identify the critical path!

Properties of Critical Paths A project network always has a critical path, sometimes there is more than one. All activities having zero slack must lie on a critical path, whereas no activities having slack greater than zero can lie on a critical path. All events having zero slack must lie on a critical path, whereas no events having slack greater than zero can lie on a critical path. A path through the network such that the events on this path have zero slack need not be a critical path (because one or more activities on the path may have slack greater than zero!).

PERT-Adding Uncertainty to Project Networks In reality, activity durations are not deterministic For each activity, three estimates are provided in PERT: a) most likely estimate b) optimistic estimate c) pessimistic estimate Additional assumptions: A 1: The spread between a and b is 6 standard deviations. A 2: The probability distribution of each activity time is (approximately) a beta distribution.

PERT-Adding Uncertainty to Project Networks These assumptions lead to the following formulae for expected value and variance of activity times:

PERT-Adding Uncertainty to Project Networks To calculate expected value and variance of the project time, additional assumptions have to be made: A 3: The activity times are statistically independent random variables. A 4: The critical path (calculated using expected times) always requires a longer total elapsed time than any other path. Using these assumptions, expected project time equals the sum of the expected activity times along the critical path. The variance of the project time is the sum of the variances of the activity times on the critical path.

PERT-Adding Uncertainty to Project Networks To make probability estimates for events occurring before a specified time, one additional assumption has to be made: A 5: The probability distribution of project time is (at least approximately) a normal distribution. The larger the project network, the more reasonable this assumption will be!

Example Consider the following project network. The PERT three-estimate approach has been used, and it has led to the following estimates of the expected value and variance of the time required for the respective activities: The scheduled project completion time is 22 months after the start of the project. a) Using expected values, determine the critical path for the project. b) Find the approximate probability that the project will be completed by the scheduled time. c) In addition to the critical path, there are five other paths through the network. For each of these other paths, find the approximate probability that the sum of the activity times along the path is not more than 22 months.

CPM-Adding Time-Cost Tradeoffs Two points are provided for each activity in CPM: a) The normal point (activity time and cost under normal circumstances) b) The crash point (activity time and cost when activity is carried out as fast as technically possible) Additional assumption: Linear time-cost relation

CPM-Adding Time-Cost Tradeoffs Notation: D ij...normal time for activity (i,j) C Dij...normal (direct) cost for activity (i,j) d ij...crash time for activity (i,j) C dij...crash (direct) cost for activity (i,j) LP formulation: x ij...time for activity (i,j) Slope of cost function for activity (i,j):

CPM-Adding Time-Cost Tradeoffs LP formulation: y k...(unknown) earliest time for event k (which is a deterministic function of x ij )

Example Consider the following project network. The CPM method of time-cost trade-offs is to be used to minimize the cost of completing the project within 15 weeks. The relevant data (in weeks and thousands of dollars) are as follows: Formulate a linear programming model for this problem!