Project Manegment (IENG419) Fall:(2010-2011) Research Assistants: Farhad Mousavi & Sadegh Niroomand.

Slides:



Advertisements
Similar presentations
Cyclic Coordinate Method
Advertisements

Computer-Aided Engineering Design
1 times table 2 times table 3 times table 4 times table 5 times table
TODAY IN ALGEBRA 2.0…  Warm Up Task: Exit to AT  Learning Goal 1: 2.3 You will graph linear equations in slope-intercept or standard form  Independent.
MINING EQUIPMENT OPERATOR By Ben Miland. Why this job?  Heavy Machinery  Good Income  The Natural Recourses  Someone has to do it.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
1 Microsoft Project Pro CHAPTER 4 Viewing Project Information.
Accomplishments: Implementation Login form Dictionary Inputs Calculations(Partially Completed) Output(Partially Completed) Made a test database.
Usability Testing for eMAR IHS Bar Code Medication Administration.
Project Manegment (IENG419) Fall:( ) Research Assistants: Farhad Mousavi & Sadegh Niroomand.
Estimating Project Times and Costs
Team Organization Captains – Chris Chaffee + David Hall Project Management – Will Lupher + Backup Logistics (Materials Acquisition, Stockpiling) – Lead.
Chapter 4 Ordinary Concrete. §4.2 Ingredient of Ordinary Concrete Cement4.2.1 Cement Aggregate Water Concrete Admixture.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Seeing Words Seeing Words Mighty Machines bulldozer.
Tables Learning Support
History Alive! Chapter 14 In order for the assignment to work, you will need to view this PowerPoint in its slide show format. Press F5.
CHAPTER 9 Genetic Engineering Engage Activity. Genetic Engineering Be prepared to share your thoughts on the entry task. Remember, when you brainstorm,
K-5 ELA Module 1 Training Understanding the K-5 ELA Vertical Alignment Narrative and Response to Literature Genres CHAPTER 10: Creating Connected Reading.
GSZAJNB818\MSSQLSERVER_SORD,1500 Table – OC_ST_Plan_Transactions_BPF GSZAJNB818\MSSQLSERVER_SORD,1500 Table – vw_Site_Action_Register_BPF Cancelled.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
Open Workbench By Wilmer Arellano Spring This is just an example, you can customize as you like.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
CE 332 – Construction Engineering and Management
By Wilmer Arellano Spring 2010
Chapter 2 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
CIVL300 SUMMER PRACTICE.
Chapter 6 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
Chapter 3 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
ASSIGNMENT NO.-2.
Times Tables.
Managing Human Resources and Labor Relations.
Myob Customer Support Number
Project Management.
Unlocking the Secrets of Mohenjodaro
Engineering Your Future: A Comprehensive Introduction to Engineering
Seeing Words.
BIOLOGY SEPTEMBER 2013 Opening Assignments.
Seeing Words.
CIVL300 SUMMER PRACTICE.
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Windows басқару элементтері
Dial Brother Printer Repair Support Services centre Help Number NZ We fix issue like Brother Printer Drivers Installation, install,
Dial Brother Printer Repair Support Services centre Help Number NZ We fix issue like Brother Printer Drivers Installation, install,
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
ACCOUNTING I Chapter 4 Assignment Sheet
ACCOUNTING I Chapter 3 Assignment Sheet
CIVL300 SUMMER PRACTICE.
Қош келдіңіздер!.
3 times tables.
6 times tables.
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Информатика пән мұғалімі : Аитова Карима.
Chapter 11 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
How well do you KNOW your 2 times table ?
Chapter 4 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Chapter 8 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
Multiplication Facts 3 x Table.
Chapter 1 Functions.
Chapter 5 Kenneth J. McLaughlin, Labor Economics Copyright © 2016 Oxford University Press.
“What are you doing here?”
Presentation transcript:

Project Manegment (IENG419) Fall:( ) Research Assistants: Farhad Mousavi & Sadegh Niroomand

Chapter 4 Assigning Resources to Activities If you followed previous chapters and created the project and also defined resources, so you are ready to assign the resources to the activities.

Assigning Resources to Activities Before starting to assign, for all tasks, from Task Information window, we should change the Task Type to Fixed Duration as you see here

Assigning Resources to Activities This table shows that which resources should be connected to the activities. No.ActivityResource 1Planning - 2Lining Labor 1, Engineer 1 3Excavation Loader, Bulldozer 4Grave Loader 5Molding1 Loader 6Armature1 Loader, Bar 7Molding2 Loader 8Armature2 Loader, Bar 9Concrete1 Loader, Cement 10Concrete2 Loader, Cement 11Curing1 - 12Opening the Mold1 Loader

Assigning Resources to Activities To start, we follow this order: 1 Select an activity 2

Assigning Resources to Activities Now in Assign Resources window, we can select resources to assign to the selected activity. 1 Select You can change units 2