Wind Farm Legal Issues ROGER A. McEOWEN

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Unit 9 – Risk Management Chapter 32, 33, 24, 35, and 36.
Clinical Trial Agreements
Farmland Values and Leasing Key Questions Chapter 20 §What determines the value of farmland? §What are the advantages and disadvantages of owning vs. leasing?
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
Land Subdivision and Zoning Unit: Owning Property Lesson: Land Subdivision and Zoning.
Managing Risk in Academic Placement Agreements Joseph C. Risser, CPCU, ARM-P Director, Risk Management California Polytechnic State University.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
PRESENTED AT: The University of Texas School of Law 2009 WIND ENERGY INSTITUTE 1.
Mary Sobba Agriculture Business Specialist Equitable Leases and Business Agreements.
Section 34.2 Handling Business Risks
Insurance Law CHAPTER 19.
Lecture No. 3 Insurance and Risk.
Chapter 2 Insurance and Risk.
Creating a Renewable Energy Opportunity Plan for Southwest Wisconsin Legal Considerations Michael Allen October 21 st 2011.
Wind Turbine Lease Education Program Ron Haugen Project Director North Dakota State University Extension Service 6/11/2015 Extension Risk Management Education.
Farm and Forest Land Preservation with Conservation Easements.
Energizing Michigan Energizing Michigan WIND ENERGY EDUCATIONAL PROGRAM FOR FARMERS AND LANDOWNERS Professor Stephen B. Harsh Department of Agricultural.
Wind Contracts A Farmer's Perspective Colette McLean Essex County.
Farm Leasing Basics ASAP Business of Farming Conference, February 22, 2014 Eric Mine – Land Loss Prevention Project All Rights Reserved Eric Mine,
Wind Power– Can it make sense in Michigan ? Tom Hewson Energy Ventures Analysis Inc Arlington Virginia March 2003.
Chapter 4 Risk Management BCN 4772 Summer Risk Management What is Risk? What is Risk? Specific types of Risk Specific types of Risk Inflation Inflation.
Small Farm Profitability: Is Wind Energy the Answer? 1
Continuity Clinic Liability Insurance 101 Modified from information on
Insurance Is protection for individuals against possible financial losses Provides protection against many risks such as unexpected property loss, illness.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Wind Turbine Lease Considerations for Landowners Dwight Aakre Ron Haugen February 2010.
Western NC Wind Capacity ASU Energy Center after all exclusion zones: 3,150 MW in west (8% of NC electricity from 2100 turbines) ASU Energy center identified.
Contract to Purchase 1 Contracts to Purchase Real Estate Real Estate I Mike Brigner, J.D.
Shopping for an Automobile Loan What Do I Need to Know? Using Financial Calculators.
Agricultural Conservation Easements John Bonham Carolina Mountain Land Conservancy.
Construction Contracts What You Need to Know March 19, 2015.
Dr. Shannon L. Ferrell Assistant Professor Oklahoma State University Department of Agricultural Economics Oil, Gas, Wind and Agriculture: Can’t We All.
Overcoming Barriers Expanding the Market for Small Wind Energy Systems Small Wind 102: Economics Making the numbers work Small Wind 103: Siting Issues.
LISA CHAVARRIA STAHL, BERNAL & DAVIES, LLP AUSTIN, TEXAS PRESENTED AT: THE UNIVERSITY SCHOOL OF LAW 2008 WIND ENERGY INSTITUTE Wind.
SURFACE AND MINERAL CONFLICTS: THE LANDOWNER AND DEVELOPER PERSPECTIVE Randall J. Feuerstein, Esq. DUFFORD & BROWN, P.C Broadway, Suite 2100 Denver,
Chapter 16. Georgia Real Estate An Introduction to the Profession Eighth Edition Chapter 16 Real Estate Leases.
SHARED EQUITY KITTITAS YAKIMA VALLEY CLT Sarah Bedsaul Director.
Is It Worth It? The Cost of Insurance. Insurance Terms Premium Deductible Underwriting.
Conifer Plantation Management Caring for Your Land Series of Workshops Conifer Plantations Module #4 Timber Sales and Marketing 4-1.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
Copyright 2008 The Prinz Law Office.1 Getting Started with Drafting a License Agreement: A Brief Guide to the Elements and Key Considerations By Kristie.
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
Chapter 2 Insurance and Risk
Copyright © 2011 Pearson Education. All Rights Reserved. Chapter 2 The Insurance Mechanism.
Insurance and Risk 2-1. Copyright © 2008 Pearson Addison-Wesley. All rights reserved. 2-2 Agenda Definition and Basic Characteristics of Insurance Requirements.
Joint Venture Agreements. Joint Ventures Joint Venture (JV) : Two or more construction contractors jointly competing for a particular project pooling.
HIRE PURCHASE FINANCE AND CONSUMER CREDIT
By Rahul Jain. Hire Purchase is a method of acquiring assets without having to invest the full amount in buying them. Typically, a hire purchase agreement.
Joint Liability and Indemnity Several people or companies may contribute to one loss. Each party will pay damages in proportion to the amount of their.
NJSPLS The Character and Nature of Claims Against Land Surveyors Ed Pagan, Jr., Esquire Pagan Affiliates LLC Richard N. Hartman.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 3 Introduction to Risk Management.
Let’s Make a Deal Buying and Selling a Practice. Presented by Denise Robertson, Mills & Mills LLP Denise joined Mills & Mills LLP as an Associate in 2005.
Ch. 18 Insurance Law Pages 318 – 339 Insurance Fundamentals
Housing Legal and Financial Decisions.. Lease Lease – Legal document between the owner of the property and the person wishing to occupy the property.
Engineering, Policy, Finance
 Three things are necessary in order for there to be a contract: an offer, acceptance and consideration  Consideration is something promised mutually.
E BDS Wind Energy Development Issues for Local Governments and Municipal Utilities Presented to: International City/County Managers Association.
Evaluating Oil & Gas Lease Proposals Theodore A. (Ted) Feitshans Department of Agricultural & Resource Economics North Carolina State University
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Defining Hazard & Risk for Land Use Planning Xavier Anderson, New Mexico State Forestry Joy Esparsen, New Mexico Association of Counties.
Copyright 2008 Thomson Delmar Learning. ALL RIGHTS RESERVED. Chapter 4 Public Regulation and Encumbrances Zoning Legitimate police power of government.
Evaluating Conservation Easement, Solar Lease, and Land Lease Proposals Theodore A. (Ted) Feitshans Extension Professor Department of Agricultural & Resource.
5 Productive Reasons To Invest In Home Insurance
In The Clear: Title and Ownership
Contract Review and Processing
Engineering, Policy, Finance
Presentation transcript:

Wind Farm Legal Issues ROGER A. McEOWEN Associate Professor of Agricultural Economics and Extension Specialist, Agricultural Law and Policy, Kansas State University, Manhattan, KS. Member of KS and NE Bars.

Contact Information 305 Waters Hall KSU Manhattan, KS 66506 (785) 532-1519 (O) (785) 293-5108 (H) rmceowen@agecon.ksu.edu

Wind Energy Development Primary Issues Make a serious attempt to determine the intent of the developer Have they developed wind farms elsewhere? Is financing in place? The typical investment approaches $100 million Do they intend to assign the agreement?

Wind Energy Development Primary Issues Carefully examine the structure of the land use agreement Never sign a lease/easement agreement with a developer without first seeking legal counsel Must developer consent to landowner’s property use? Is developer given rights not related to wind energy development? What is the compensation structure? Payment timing Payment frequency Payment for loss of crop cultivation

Wind Energy Development Primary Issues Landowner must stay abreast of liability issues Property taxes H.B. 2579 (intro. on 1/23/04 and referred to House Committee on Taxation on 1/26/04) Liability issues Trespassers Third party usage Environmental/aesthetic issues Nuisance Lawsuits and claims related to developer’s actions

Wind Energy Development Site selection is the key to development and the avoidance of legal problems in the future: Windy (based on windy days and velocity) Near transmission lines Access to roads Few environmental concerns Community support – zoning, use permits, etc.

Zoning Ordinances, Building Codes and Land Use Few ordinances pertain specifically to wind systems Generally few or no codes that restrict the use of a wind turbine Federal regulations exist concerning structure height within 10 miles of an airport

Utility-Scale Wind Turbines 750 KW to 1.5MW Tower heights from 170 to 320 feet Blade diameter 75-100 feet with a weight of between 8,000 and 10,000 lbs. Cost to install is approx. $1 million per MW of installed capacity 1.5 MW turbine can produce 5 million KW/yr (400-500 homes) 6-12 turbines on a section of land

Wind Energy Agreements Payment structure Common fee is a minimum flat payment per turbine plus a royalty (% of revenue) Every aspect is negotiable: Annual percentage (2% first 15 years) Future year escalation (4% second 15 years) Guaranteed minimum ($2,000 per turbine/yr) Annual gross revenue (definition is the key) Sale of electrons? Sale of green credits? Montezuma – 5 turbines, 20 yrs., $300,000

Wind Energy Contracts Landowner will either get a lease document or an easement agreement If lease, it should be long enough for developer to recoup investment (at least 20 yrs) If easement, does it include turbine sites, substations, air space, buffer areas, vegetation restrictions, building restrictions, transmissions, and associated rights of way? If sale of land: Price = FMV + Wind Value

Wind Energy Contract Provisions Term of years – life of turbines Surface rights – ingress/egress Transmission rights Land use restrictions Hunting? Pasture burning? Compensation Assignability – critical for financing Insert clause that ensures the original developer’s liability if assignee defaults under the terms of the agreement

Legal Issues for Landowners How much of the land is subject to the agreement? Length of agreement Am I compensated fairly for the property rights I have given up? Understand the economics and mechanics of wind energy production Tax consequences of wind energy payments Is payment based on wind energy production? Is it a fixed amount?

Legal Issues for Landowners Does the developer want to develop the land or just want a use right? For development, the construction clause should limit construction of wind energy structures to not more than 3 or 4 years with adequate compensation paid to the landowner for use restrictions during that time

Legal Issues for Landowners What events allow the developer to terminate the agreement? Anytime without cause? Can I go to court? Binding arbitration? Do I have any termination rights? If so, how do I exercise those rights? What happens to the structures upon termination? Who pays for removal? How soon do they have to be removed?

Wind Energy Agreements Consider clause language that requires landowner to be treated as favorably as neighbors that execute similar agreements Define “neighbor” carefully

Wind Energy Agreements Require that the agreement be recorded (not just a memorandum of the lease agreement) Eliminates problem of having to find agreement on subsequent sale HB 2280 (intro. KS House 2/2003) would have required recordation of lease agreement. Later amended and died in committee S.B. 331 (intro. KS Senate on 1/22/04 and referred next day to Sen. Comm. On Util.)

Wind Energy Agreements Never agree to confidentiality agreements Have your insurance agent review the agreement Will any USDA land use restrictions be violated? Consider clause requiring developer to indemnify landowner for any lost government payments or for imposition of any penalties

Negotiating a Wind Energy Agreement Common problem: Once proposed and submitted to landowner, company tends to not want to negotiate changes to the agreement’s terms Does landowner have meaningful options? Does landowner have legal representation?

Wind Energy Contract Provisions Indemnification Mitigation of damages Excavation and reclamation E.G., who gets the rock in the Flint Hills that gets excavated? Note: It takes approx. 188 cubic yards of concrete per tower Restoration What happens when the project ends? Is there a need to post bond?

Risk Evaluation for Landowners Long term (25-30 years) Evaluation of developer Evaluation of operator Project ownership and control will change Worst-case scenarios (e.g., tornados) Energy market changes Unrealistic expectations Environmental issues Siting, zoning, permitting Family and neighbor acceptance

Liability and Insurance Landowner faces potential liability if their property poses any threat to the general public. Issues to be dealt with in the contract: Wind turbine throwing a blade Tower collapsing onto neighboring property Set-back requirements Attractive nuisance issues (safety fence?)

Liability and Insurance Homeowner policies Many can be extended to insure against liability brought about by damage or injury caused by a wind turbine Wind turbine can be protected by insurance coverage against damage as a result of fire, lightning, ice or theft

Environmental Concerns Flint Hills Threat to prairie ecosytem? The Flint Hills are the largest remaining tallgrass prairie in the U.S. H.B. 2799 (intro. KS House on 2/10/04 and referred to House Committee on Utilities on 2/11/04 Would place a moratorium on wind turbine development in the Flint Hills

Environmental Concerns Avian issues Prairie chicken (further south) & fragmentation of habitat Bird kills (slower blade rotation kills fewer birds) Altamont Pass, CA litigation against Florida Power and Light

Environmental Concerns Aesthetics Viewscape, viewshed, scenic byways FAA lighting requirements (blinking light) FAA restrictions if located close to airport Noise issues (usually not objectionable) County zoning, conditional use permits

Wind Farming in Kansas Potential for significant economic benefit for rural landowners All agreements must be evaluated carefully by legal counsel Attempt to negotiate any unfavorable terms

THANK YOU! Roger A. McEowen 305 Waters Hall Kansas St. Univ. Manhattan, KS 66506 (785) 532-1519 (ph.) (785) 532-6925 (fax) rmceowen@agecon.ksu.edu