QinetiQ Chris Dorn Lightweight optics for Extreme UV Spectrometer 9 July 2002.

Slides:



Advertisements
Similar presentations
The Science of Solar B Transient phenomena – this aim covers the wide ranges of explosive phenomena observed on the Sun – from small scale flaring in the.
Advertisements

OMEGA : science introduction 1. OMEGA primary goals 2. Science designed specifications 3. Instrument overview 4. Outline of major science outcomes.
Draft Recommendations subtitle here. Recommendation 1 The study groups from this workshop continue to collaborate with the goal of reporting progress.
CHRIS (Compact High Resolution Imaging Spectrometer) sira group sira electro-optics Dr Mike Cutter EO & Technology Business Manager.
Thermal StrategySam Heys, RAL EUV Spectrometer Proto-Consortium Meeting November 28th 2001 Coseners House 1 Thermal Strategy Sam Heys Rutherford Appleton.
RAD 350 Chapter 17Digital Rad Tech. Spatial Resolution – ability to distinguish small items in close proximity with near the same atomic mass density Spatial.
Pre-launch Characterization of the CERES Flight Model 5 (FM5) Instrument on NPP S. Thomas a, K. J. Priestley b, M. Shankar a, N. P. Smith a, M. G. Timcoe.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Solar Orbiter EUV Spectrometer
Solar Orbiter Payload Working Group Mid-term meeting November 2002, ESTEC 1. PDD Activities - Status of PDD inputs - Discussion of each instrument.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
The Field of View of a Thin Lens Interferometer Baseline=2B F F=range from array center to detector  ’’  Nulled here. B B 2Bsin  Bsin  2 Channels.
Using DELPHI for Weak Lensing Measurements: Science Return and Mirror Size Jes Ford, JPL, UNR SURF /21/07 Mentor: Jason Rhodes Co-mentor: David Johnston.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
The Four Candidate Earth Explorer Core Missions Consultative Workshop October 1999, Granada, Spain, Revised by CCT GOCE S 59 Performance.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
990901EIS_RR_Science.1 Science Investigation Goals and Instrument Requirements Dr. George A. Doschek EIS US Principal Investigator Naval Research Laboratory.
Optical characteristics of the EUV spectrometer for the normal-incidence region L. Poletto, G. Tondello Istituto Nazionale per la Fisica della Materia.
Grazing-incidence design and others L. Poletto Istituto Nazionale per la Fisica della Materia (INFM) Department of Electronics and Informatics - Padova.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Hubble Recovery with STS Bryan Palaszewski working with the Digital Learning Network NASA.
Solar orbiter – EUS instrument mechanical design Tim Froud and Doug Griffin.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
R. Jansen TEC-EDM 1 Cosmic Vision Instrumentation ASIC 24-September 2009.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
Early Spacecraft Exploration Early Spacecraft Exploration Mariner 3 & 4  “…these missions are being undertaken because Mars is of physical.
08/31/2006 ~ Mission specific challenges: Data Analysis GRS Interferometry.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
To achieve a level 3 your work must show that: With some help you can gather information to help with designing your project You can draw suitable ideas.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
The Second International Workshop on Ultra-high-energy cosmic rays and their sources INR, Moscow, April 14-16, 2005 from Extreme Universe Space Observatory.
Page 1ENVISAT Validation Review / GOMOS session - ESRIN – 13th December 2002 ENVISAT VALIDATION WORKSHOP GOMOS Recommendations by the ESL team : Service.
Solar Orbiter Mission (ESA) - The near-Sun phase  approach the Sun as close as 48 solar radii (~0.22 AU). At these distances, the angular speed of a spacecraft.
WFIRST 10  m Pixel Pitch Detector Considerations March 10, /10/
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
How to startpage 1. How to start How to specify the task How to get a good image.
An evaluation method of the retrieved physical quantity deriving from the satellite remote sensing using analysis of variance in experimental design Mitsuhiro.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
SNAP Calibration Program Steps to Spectrophotometric Calibration The SNAP (Supernova / Acceleration Probe) mission’s primary science.
NHSC SPIRE Data School – Pasadena 28 th - 30 th June 2010 PACS page 1 SPIRE Imaging Fourier Transform Spectrometer (FTS) Pipeline Data Processing Nanyao.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Thermal Design Matthieu GASQUET Cranfield University / Rutherford Appleton Laboratory Coseners House July 9th 2002 EUS consortium meeting.
SuperNova / Acceleration Probe Thermal System Wes Ousley November 16, 2001.
Lightweight mirror technology using a thin facesheet with active rigid support J. H. Burge, J. R. P. Angel, B. Cuerden, H. Martin, S. Miller University.
06 Oct 05Space Science & Technology Dept1 Solar Orbiter Consortium Meeting 03 Mar 06 Optical Design Of Solar Orbiter Normal Incidence Spectrometer KF Middleton.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Solar X-ray Imager (SXI) Current and Future Requirements 22 May 2001 Steve Hill Solar Causes and Effects... Operational Requirements Improvements for GOES-R+
X-ray Interferometer Mirror Module ISAL Study Pre-work Overview.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
3 rd March 2006EUS Consortium meeting EUS Instrument Overview Eric Sawyer RAL.
OPTICAL SENSORS DESIGNED IN FRAME OF THE AEROFAST PROJECT IN SPACE RESEARCH CENTRE PAS On board instrumentation Pyroelectric sensor Imaging Multispectral.
Denis Tremblay 1, Yong Han 2, Yong Chen 3, Likun Wang 3, Xin Jin 2, Xiaozhen Xiong 2, Lihang Zhou 2 1 Science Data Processing Inc., 2 NOAA/NESDIS/STAR,
2015 GSICS Annual Meeting, Deli India March 16~20, 2015 Xiuqing Hu National Satellite Meteorological Center, CMA Yupeng Wang, Wei Fang Changchun Institute.
Pre-launch Characteristics and Calibration
TEMPO Instrument Update
Maxim Pathfinder Prework 16 August 1999
Early Exploration Mariner 3 & 4
TEMPO Instrument Update
4-3-1 Data Transfer. By the end of this topic you should be able to:-
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
Worldview II Launched October 8, 2009 Altitude: 770 km
Early calibration results of FY-4A/GIIRS during in-orbit testing
THERMAL CONTROL SYSTEM
TEMPO Instrument Update
Presentation transcript:

QinetiQ Chris Dorn Lightweight optics for Extreme UV Spectrometer 9 July 2002

Medium Wave Infra Red (MWIR) Space Telescope Pushing technology harder

Copyright QinetiQ Dead Pixels M1 Railway and station A5(T)Grand Union Canal MWIR Pixels: 35m Orbit: 450 x 1750km, 69° Milton Keynes 12 th August :42 UTC Level 2 processing; stagger bar re-sampling

TopSat A new chapter in optical missions

Copyright QinetiQ TopSat - overview 2.5m target resolution, panchromatic baseline + 3 band colour at 5m 15% system MTF, 50:1 SNR 15km FoV 1 year mission life Near real time operations In-theatre demonstration Launch planned 2004

Copyright QinetiQ Lightweight Optics Variety of materials tested Carbon fibre selected, due to:- –High specific stiffness –“Controllable” CTE –Low cost –Relatively simple process Coatings technologies –Durable –Polishable Zerodur 24 x 28cm, 4300g CFC 28cmØ, 250g

Copyright QinetiQ Results Interferogram of:- –“flat” CFC mirror –unpolished The Spherical Mirror is –more accurate –has been polished ~5.6 kg/m 2 –Topsat 164 kg/m 2 –Hubble 180 kg/m 2

ALCAMIST (Adaptive Lightweight CArbon MIrror SysTem)

Copyright QinetiQ ALCAMIST Faraday Partnership project, Smart Optics 55cm adaptive mirror CFC faceplate 19 actuators Greater understanding of:- –CFC mirrors –Manufacturing issues –Practical problems

Copyright QinetiQ Timeline EUS Phase B start Now Launch MWIR LW mirrors ALCAMIST

Copyright QinetiQ Post Meeting Notes/Comments Following our attendance at the Cosener’s House meeting, several issues, questions, actions and comments arose:- –Some further work is recommended to define the physical dimensions of the science module, so that only viable optical designs are investigated. –Further work is recommended on the realistic electrical noise environment within the detector and ADC (including quantisation noise). By setting an acceptable signal to noise ratio, the suitability of optical designs can be evaluated. –Consideration should be given to novel observation strategies that are limited by the data transfer and instrument power limitations, while simplifying the thermal management situation. Eg. looking away from the sun or use a shutter to reduce solar input. –The operating temperature range for a “typical” carbon fibre (eg. EX1515/M46J) has been qualified for space at +120°C to -170°C. Our materials specialists suggest that +200°C is probbaly achievable with that resin/matrix system, however, they have not been tested at such temperatures. The advatnageof composite materials is that the resin and matrix can be selected for the expected conditions and several alternative resin/matrix systems are available that have been tested to significantly higher tempeatures. The ALCAMIST technology allows a mirror to be adjusted over this temperature range, hence maintaining optical requirements. A short test programme to demonstrate this and suitable coatings would ensure that this technology was available for consideration in the design. –With optical systems, there are 2 main design routes; fixed and adaptive. Engineering a “fixed” optical system (on a 2m scale) that remains within tolerance over such a wide operating temperature range and within a realistic mass budget is extremely risky. By following the adaptive or “smart structure” route, the changes in the optical system can be sensed and corrected. This trades mass for technical complexity, but careful selection of mature technologies will minimise this. An ALCAMIST style mirror can also provide the raster scan function. –My contact details;