S2E Design Plan Start with Matt’s layout Consider Cave1 + Cave2 constraints Use Elegant for initial spatial layout (X,Y,Z) and transverse optics (beam.

Slides:



Advertisements
Similar presentations
Can we re-use existing magnets to build a 350(450) keV beam line? No.Type 115 deg dipole 1Spectrometer dipole 1NEG solenoid (2.5” ID) 5SW/CW solenoid 1Wien.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Bunch compressor design for eRHIC Yichao Jing and Vladimir Litvinenko FLS2012, Newport News, VA 3/8/2012.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
CLIC Drive Beam Injector Design Update Shahin Sanaye Hajari 1.Institute For Research in Fundamental Sciences (IPM), Tehran, Iran 2.CERN, Geneva, Switzerland.
Aperture Considerations in the FEL Upgrade Accepted design process –generate design  known –set aperture = N  + W N typically 4 to 6 W is “beam handling.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
CSR calculation in ERL merger section Tsukasa Miyajima KEK, High Energy Accelerator Research Organization 8 November, 2010, 13:30 Mini Workshop on CSR.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
Y. R. Roblin Hall A beamline and accelerator status.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
Optimization Objectives Top Level Questions 10 MeV – Incorporate studies on operability, cost etc. 50 MeV – More stringent beam specs  Optimize 50 MeV.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
R. Miyamoto, MEBT Lattice Optimization, ESS AD Beam Physics Internal Review 1 MEBT Lattice Optimization Ryoichi Miyamoto (ESS) For Beam Physics Group,
Bunch Length Measurements Mahmoud Ahmad 1 Stay treat, July 16, 2015.
Beam dynamics simulations with the measured SPARC gun- solenoid field G. Bazzano, P. Musumeci, L. Picardi, M. Preger, M. Quattromini, C. Ronsivalle, J.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Choppers Comparison of three schemes of choppers is made 2.5 MeV and 2.1 MeV beam energies are considered Presented by Boris Shteynas May,
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
HP-PS injection and extraction status W. Bartmann, B. Goddard HP-PS meeting, 20-November 2013.
First evaluation of Dynamic Aperture at injection for FCC-hh
PEPPo a Proof-of-Principle Experiment
Primary Beam Lines for the Project at CERN
Beam dynamics for an X-band LINAC driving a 1 keV FEL
M. Migliorati, C. Vaccarezza INFN - LNF
JLEIC Forward Ion Detection Region
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Yuhui Li How to edit the title slide
CEBAF Injector Overview
Thermal emittance measurement Gun Spectrometer
12 GeV CEBAF.
Upgraded Injector Test Facility
The Cornell High Brightness Injector
Cornell Injector Performance
keV region overview Polarized Source Inverted Gun with 450 kV HVPS
Electron Source Configuration
ELENA Extra Low ENergy Antiproton Ring
A. Freyberg Aug 2016 ECT’16 =>
Test of Booster at UITF Reza Kazimi (12/12/18)
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Injector for the Electron Cooler
Update on ERL Cooler Design Studies
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
MEIC New Baseline: Part 7
Conventional Synchronization Schemes
JLEIC Collider Rings’ Geometry Options (II)
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Option 1: Reduced FF Quad Apertures
Presentation transcript:

S2E Design Plan Start with Matt’s layout Consider Cave1 + Cave2 constraints Use Elegant for initial spatial layout (X,Y,Z) and transverse optics (beam sizes in X, Y) Address longitudinal dynamics with GPT and Elegant Iterate Cave 1 POISSON to model gun and generate 350kV (Er,Ez) GPT to transform initial conditions to Elegant input at S=20cm Solenoids set waists at apertures (15 bend, Wien, Apertures, Cryounit) Chopper optics/layout constrained to 10mrad deflection Wien filter, chopper cavities, buncher and cryounit will get special component attention Beam exiting cryounit TBD : GPT, Elegant, Measurement, FEL model ? Quads set launch from Cave1 to Cave2 Cave 2 Vertical chicane from cryounit CL 42” to HDIce CL 85-3/8” Quads compensate chicane dipoles and set size at HDIce Raster specs set distance range to target Limited space means good idea to thin about diagnostic + target + dump UITC Optics Model Status as of July 28, 2014 (Grames/Wang)

(Horizontal Bend) (Vertical Bends) Matt’s Layout

As-found reference for Cave1 +Wall + Cave2

Cave MHz Chopper Cavity Conditions 300W 200W

y [in]y [cm] Cryounit Height HDIce Target Height Difference Beam Momentum [MeV/c] Vertical Bend Angle [deg][Rad]delta-Z [cm]BL[G-cm]delta-S [cm] Magnet TypesFunctionCurrent Max [A]Hyst Max [G-cm] MBVExisting 5MeV dipole MDLNew 5 MeV dipole ? MBF123 MeV spectrometer MBL123 MeV chicance Cave2 - Vertical Chicane Geometry delta-S delta-Z 42” 85-3/8” Maybe serves as the momentum spectrometer. Thus, chose longer arm (smaller angle). 1mm/2203mm is 4.5E-4 (dp/p<0.05%)

DS Wien=0 Buncher A1 A2 SRF1 SRF2 BL1 BL2 IBC_S IBC_E CAVE1 CAVE2 +5 QUADS (SOLID=OFF, DASHED=ON) First pass Elegant layout – 350keV Gun to Dump  x =  y =4E-8 (probably 2-3x too small) dp/p = 1E-5 (OK at gun, not later…)

Acceleration from 350 keV (0.69 MeV/c) to 10 MeV (10.5 MeV/c) ideally reduces transverse emittance by a factor of about 15. It is doubtful we’ll benefit this amount. Normalized emittance should be constant. Measurement at CEBAF shows it isn’t and no measurement at 10 MeV (yet) Options: use measurement; or simulation or model (if agrees with measurement). FEL … !? P  x (m) xx  y (m) yy  x (norm) (mm-mrad)  y (norm) (mm-mrad)         S2E probably means: S2E Cave1 + S2E Cave2, at least initially

Importance of reasonable dp/p after cryounit Increasing dp/p from Gun value (1e-5) to more typical – arguably challenging (0.5% = 5E-4) (Vertical Bends)

Floor coordinates of model can be generated and used to generate mechanical layout and answer questions related to construction of both caves. If we want we can choose (X0, Y0, Z0) to be survey coordinates. Keep in mind (X,Y,Z) are physical locations and (S) is distance beam travels, i.e S and Z are not the same. Using Elegant model to generate/address mechanical layout

Cave 1 Add gun Twiss output from GPT Add generic hardware layout for better idea of layout and optical strengths needed Calculate options for existing Wien and upgrade Wien operating w/ 350keV beam Benchmark model of chopping optics with calculation Define input conditions to cryounit, i.e. final solution from Gun to Cryounit Update baseline optics in Elegant, make sure this makes sense Fold into GPT for longitudinal study => mechanical lengths (= TOF) important to fold in Cave 2 Choose (extrapolate from measurement) reasonable cryounit output Twiss Optimize optics to reach um spot size (do we speak 1-sigma, 4-sigma, 90% ?) Fold raster spec into layout Geant4 model to assess beam from HDIce to dump? Define BPM resolution to determine how far from target Define minimum “keep out” after HDIce for possible asymmetry detectors Fold into Elegant for transverse study Proposed next steps…