Roma 16 maggio 2006 Commissione I Detector status Pisa commitments Analysis Laboratory tests TileCal Status report (ATLAS-Pisa)

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Roma 17 Maggio 2005TileCal 1 Tilecal Status report Stato dell’esperimento Responsabilita’ di Pisa Attivita’ in corso: commissioning, calibrazioni, analisi.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
1 physics reaction of interest (parton level) lost soft tracks due to magnetic field added tracks from in-time (same trigger) pile-up event added tracks.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Top Turns Ten March 2 nd, Measurement of the Top Quark Mass The Low Bias Template Method using Lepton + jets events Kevin Black, Meenakshi Narain.
Kevin Black Meenakshi Narain Boston University
An Online Calorimeter Trigger for Removing Outsiders from Particle Beam CalibrationTests Denis O. Damazio José Manoel de Seixas Signal Processing Lab –
05/11/2006Prof. dr hab. Elżbieta Richter-Wąs Physics Program of the experiments at L arge H adron C ollider Lecture 5.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Trieste 20 settembre 2006 Commissione I Detector status Pisa activities Analysis Laboratory tests TileCal Status report (ATLAS-Pisa)
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Intercalibration of the CMS Electromagnetic Calorimeter Using Neutral Pion Decays 1 M. Gataullin (California Institute of Technology) on behalf of the.
Search For the Higgs H o ->ZZ*->bbll Philip Davis (NMSU) Mentor: Dr. Teuscher (U of T) Aided by Christophe Le Maner (U of T)
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Status of ATLAS and preparation for the Pb-Pb run QM 2009, Knoxville Jiří Dolejší Charles University Prague for the ATLAS collaboration.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
25 sep Reconstruction and Identification of Hadronic Decays of Taus using the CMS Detector Michele Pioppi – CERN On behalf.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
ATLAS Tile Hadronic Calorimeter:
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Study on search of a SM Higgs (120GeV) produced via VBF and decaying in two hadronic taus V.Cavasinni, F.Sarri, I.Vivarelli.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
The ATLAS Tiles Hadronic Calorimeter
2000/9/23 JPS meeting in Niigata1 Measurement of single gamma and  0 with PHENIX EMCal (I) H.Torii Kyoto Univ./RIKEN for the PHENIX Collaboration. Sep/23/2000,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Abstract Several models of elementary particle physics beyond the Standard Model, predict the existence of neutral particles that can decay in jets of.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Régis Lefèvre (LPC Clermont-Ferrand - France)ATLAS Physics Workshop - Lund - September 2001 In situ jet energy calibration General considerations The different.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
The ATLAS Tile hadron calorimeter The ATLAS Tile hadron calorimeter Ana Henriques/CERN on behalf of the ATLAS collaboration ANIMMA 2015, April Content:
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
Marcello Barisonzi First results of AOD analysis on t-channel Single Top DAD 30/05/2005 Page 1 AOD on Single Top Marcello Barisonzi.
Status of the Higgs to tau tau analysis Carlos Solans Cristobal Cuenca.
FSC status and plans Pavel Semenov IHEP, Protvino
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Particle detection and reconstruction at the LHC (IV)
The Beam Test at Fermilab:
Venkat Kaushik, Jae Yu University of Texas at Arlington
Higgs → t+t- in Vector Boson Fusion
Introduction The aim of this talk is to try to get a feeling on the expected degradation of performance of a calibration once we move from MonteCarlo.
CMS ECAL Calibration and Test Beam Results
Plans for checking hadronic energy
Rick Salcido Northern Illinois University For CALICE Collaboration
Forward-Backward Asymmetry Study in
Presentation transcript:

Roma 16 maggio 2006 Commissione I Detector status Pisa commitments Analysis Laboratory tests TileCal Status report (ATLAS-Pisa)

Roma 16 maggio 2006 Commissione I TileCal installation Barrel installed (end Oct. 2005) and instrumented, commissioning in progress. EBC installed, in place (1 Feb. 2006), being instrumented, gap scintillator installed. EBA being installed, Lar cylinder in place, will be ready for commissioning end May.

Roma 16 maggio 2006 Commissione I Barrel (1) Barrel is cabled All the FE electronics has been mounted and is working DAQ is moving smoothly from the portable (MOBIDAQ) to the final one (RODs) First Cosmic Ray data has been taken with MDT using a limited azimuthal region (power supply/cooling problem)

Roma 16 maggio 2006 Commissione I An event MDT/Tile

Roma 16 maggio 2006 Commissione I Barrel (2) Still some problems are delaying the barrel commissioning: –Cooling pipes just arrived –LVPS have been fixed but However the system has not been extensively tested. We are aware that other faults could show up. –HV trips on drawers (7% of drawers have occasional trips) have been understood (humidity+dust), a working solution has been proposed (slowly blow dry air). Still investigating the origin of the problem.

Roma 16 maggio 2006 Commissione I EBC almost in place

Roma 16 maggio 2006 Commissione I EBC + EBA EBC installation completed (1/2/06) –Geometry within tolerances. –Commissioning is proceeding (control and trigger cables, piping…) –Moved “near” the Barrel. Tile/Lar relative position are off by 12mm in z wrt nominal. Impact on B-field have been analysed. Decision was made to position EBC as near to barrel as possible. EBA in nominal position –EBA is being assembled in the pit. On schedule, expected ready by end May 2006.

Roma 16 maggio 2006 Commissione I EBC being completed

Roma 16 maggio 2006 Commissione I EBC almost in place

Roma 16 maggio 2006 Commissione I EBA being installed

Roma 16 maggio 2006 Commissione I Pisa responsibilities We are well represented in all this activities. Iacopo Vivarelli online tools (tests on commiss.) Chiara Roda co-convener of JetEtMiss group Anna Lupi TileCal software Andrea Dotti online monitoring (presenter) Nino Del Prete TileCal IB chair

Roma 16 maggio 2006 Commissione I Activities at CERN (2006) 1. trigger cabling LB (July-August) (techs) 2. Test all LB (LVPS, HV tests, FE) (Jan-Dec) (Iacopo, Francesca, Maria) 3. Barrel timing with laser (Sept./Nov) (Iacopo, Paolo) 4. DAQ/Monitor (Aug./Dec). (Chiara, Andrea) 5. Cosmics Run (standalone, with MDT and/or Lar) fall 2006 (all) 6. Installation/commisioning EBC, EBA (The same amount of work as for LB) (know how from LB)

Roma 16 maggio 2006 Commissione I Other activities in Pisa Physics studies: VBF Higgs : H   bar Jet calibration Comparison G4/CTB Low energy pions in CTB Laboratory measurements: (PMT/Fibres) synergy with the Computer Science Dpt of Univ Pisa

Roma 16 maggio 2006 Commissione I hh E T miss H VBF (120 GeV)    hh BR (tau  hadrons) : 65% ; BR(   hh) : %  VBF H  = 300 fb Signal signature : - 2 high pt forward jets, - 2 central tau jet, - E T miss 4 jets & E T miss Backgrounds: QCD (~9 mb), Z/  * +jets (1700 pb), ttbar (550 pb) Crucial the tau identification: collaboration with Milano, Freiburg, Toronto V.Cavasinni, F.Sarri, I. Vivarelli

Roma 16 maggio 2006 Commissione I CutSignal efficiency Events QCD efficiency Events Z+jets efficiency Events Ttbar efficiency Events 4jet (2 tau), E t miss > 45 GeV 4.4% Pt tau (45,35)1.14% Pt forward (60,40) 0.72%  forward0.37%  Cuts0.25% M jj (700 GeV)0.22% Jet veto (30 GeV) 0.2% Mass window0.15% SUMMARY ATLFAST 30 fb -1 In progress Validation with full simulation started

Roma 16 maggio 2006 Commissione I Jet calibration The H1 method : jet energy is the sum of weighted cell energy. QCD 2 jets events has been used to compute weights using “topoclusters” and cone algorithm (R=0.7). The method/weights prooved to be good also for calibrating jets with different cones (R=0.4) and different samples (t-tbar) and seems to work well also for CTB data. This algorithm is robust and stable and is implemented in ATHENA.

Roma 16 maggio 2006 Commissione I Similar good results using the same weghts obtained with a Cone0.4, ttbar events, and CTB data

Roma 16 maggio 2006 Commissione I Very Low Energy CTB CTB has collected data at low energy (3-9 Gev/c) It is important to measure the calorimeters response to a low energy pion (a jet = many low energy pions) It is difficult for many experimental problems: particle identification (e, pion, mu) the beam has a parasitic high energy muon component energy calibration is still not properly understood The work is still in progress. (M. Canneri, V. Cavasinni, F. Sarri, I. Vivarelli)

Roma 16 maggio 2006 Commissione I CTB set up for VLE Our aim: obtain the purest pion sample from VLE data. The VLE beam is made of electrons, pions and muons (μ at the same η of the run and off axis). Electrons are easy to separate. ALL sub-detector are exploited for the muon selection MDT/RPC

Roma 16 maggio 2006 Commissione I LE Muon identification in TileCal (likelihood) (P i (E) energy distr. in Tile layer i) MC DATA Pions The shape of L allows a rejection of muons. MC do not quite reproduce data (more later).

Roma 16 maggio 2006 Commissione I Energy ε for μ off axis ε for μ by likelihood μ-contamination e-contamination (GeV) (%) (%) |likelihood|<30 (%) [μ (1-ε mu lik )] /π (%) /π ± ± ± ± ± ± ± ± Efficiencies and contamination Electrons are easily identified by beam Cerenkov. Muons can be identified using L or by MDT etc. In progress

Roma 16 maggio 2006 Commissione I A CTB “TAU jet” 3 pion of 7 GeV superimposed in LaR TILE

Roma 16 maggio 2006 Commissione I Test beam data, Energy deposit: G4 vs EXP, muons (1), the em scale (V.Kazanine) MOP value EXP: 3340±60 MC : 3399±6 Energy deposition in the calorimeters (log and lin scales) Lar+Tile

Roma 16 maggio 2006 Commissione I Energy deposit: G4 vs EXP, pions (1) All cells in TileCal are used while in LAr only the cells within ±0.2 eta and ±0.2 phi LAr window (eta = 0.25, phi = 0) are used; The cut on the energy at cells is E cell > 2 sigma noise; Energy deposition in the calorimeter is the sum over selected cells; The energy deposition at Cryo is approximated as : Total energy deposit. The correction on energy deposition at Cryo is included. Lar+Tile

Roma 16 maggio 2006 Commissione I Francesca Sarri, Giulio Usai PMTs STABILITY We have measured in our lab the gain, QE, noise etc of 24 PMT (the same used in TileCal), illuminated with continuous light simulating LHC at L=10 34 cm -2 s -1. Led light yield monitored by two photodiodes. Surprisingly the gain of all PMT increased with time at a rate of about % per month. No instrumental effect was found. Moreover the precise Cs calibration in different CTB periods confirms the effect also quantitatively

Roma 16 maggio 2006 Commissione I Almost 14 months (April05-May06) V nom := Gain(V nom ) = 10 5 Gain(V) ~ V  Light source changed, because of LED and LED driver broken at the end of Jan’06. Status up to 2006 Labo:  Vn/Vn = -.41±0.13 (3mnts estimate) (measured untill Jan’06) Cs Calibration (at theCTB):  Vn/Vn = -.36±0.04 (3mnts)

Roma 16 maggio 2006 Commissione I Summary: NOV’05-JAN’06 Average slope of 15 PMTs, NomVol drop estimate in 3 months Average slope of 15 PMTs, PMT/PHD rise estimate in 3 months. mean : % rms : 0.22 % mean : 1.6 % rms : 0.8 % NomVol drop (%) PMT/PhD (%)

Roma 16 maggio 2006 Commissione I The curved fibre ageing 50 cm N. Del Prete, Francesca Sarri

Roma 16 maggio 2006 Commissione I Fibre ageing Step motor Shutter PMT At each step, the PMT current is measured. Then the wheel is positioned in the different locations for more precise measurements. The precision in the ratio Fibra1/Fibra2 is about sistematics under study

Roma 16 maggio 2006 Commissione I Backup slides

Roma 16 maggio 2006 Commissione I Monitor and Presenter Presentations on the progress of the monitoring working group presented at CHEP06 by A.Dotti and W.Vandelli.

Roma 16 maggio 2006 Commissione I RPC We use the RPC in order to try to understand the fake by MDT on electron events (many events have more than 13 hits in MDT). They could be muons that are outside Tile calorimeter acceptance. RPC

Roma 16 maggio 2006 Commissione I RPC geometry Zone of inefficiency for muons by Tile Only the bottom half of the RPC (negative y) is working in the runs

Roma 16 maggio 2006 Commissione I Pions : sADC_Cherenkov2<620 && N hits in TRT <4 && not μ (mouns: signal in MDT or MuonWall or MuonTag) E Tile in the cone 0.19< η <0.61, all φ; E Lar in the cone 0.19 < η <0.61, -0.1< φ < 0.1 Energy Distributions for pions Pions at 9 GeV

Roma 16 maggio 2006 Commissione I red : full AODs, black fast AODs. In progress: -Validate ATLFAST with full simulation -New parametrization for tau-ID (with the Toronto Group) QCDSIGNAL

Roma 16 maggio 2006 Commissione I Same weights applied also to the ttbar events, Rome sample

Roma 16 maggio 2006 Commissione I The same weights (determined in QCD MC events) work well for different cone definitions, for different samples and also (preliminary) on Combined Test Beam data. This method seems more robust than the “standard” ATLAS jet calibration

Roma 16 maggio 2006 Commissione I First steps on CTB comparison: G4 vs EXP Vassili Kazanine (Budker Institute Novosibirsk, a former (and future) FAI in Pisa) The simulation of calorimeters in G4 has been the subject of previous studies (Anna, Andrea) using TileCal standalone (TB vs G4). Now G4 simulation of CTB is available and Vassili has taken up the issue of comparing data and MC. The energy scale seems to be under control and the total energy deposition in Tile+Lar is well reproduced, but: the energy in Lar is predicted too large and in tile too small once more we have the problem of the longitudinal shower shape not correctly predicted by G4.

Roma 16 maggio 2006 Commissione I Richieste: ME Stato delle spese ad oggi: ME: assegnato 109 k€ speso ad oggi 55K€ (51%) manca ancora il contributo tecnici per commissioning (7 mu) E’ richiesta la presenza continua al CERN di Vivarelli e Dotti. Questo non e’ compatibile col finanziamento attuale. Abbiamo richiesto una integrazione di 6 mu per arrivare a fine anno.

Roma 16 maggio 2006 Commissione I DAQ A new, friendly, DAQ system was built using a CAEN Brigde (V1792) which interface VME to a PC where the DAQ system runs through ROOT. A student (Marco Raglianti) from the Computer Science Department has designed this nice and simple system as part of his “tesi di tirocinio”. The Bridge has become a powerful development system. C++ programs can be fully tested, in ROOT, and then compiled and run on single board PC in VME. What is missing are VME units (ADC etc.): we use old CAMAC units that we have interfaced to VME. Often these units are faulty...

Roma 16 maggio 2006 Commissione I Preliminary. The precision of the method is OK. The problem is the mechanical stability (LED position, optical couplings etc.). Time (h) rms =