General Information Name: GRR Test Geothermal Area County: AnyCounty, NV Technology: Geothermal Federal Funding: Yes (Exploration) Project Status Current.

Slides:



Advertisements
Similar presentations
1 | US DOE Geothermal Programeere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Program Categorical Exclusions Doug.
Advertisements

Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Environmental Project Commitments The Alberta Experience
AN M3 EAGLE LLC PROPOSAL. Acting Field Manager Coeur d’Alene Field Office (208)
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
1 The National Environmental Policy Act in the Oil & Gas Industry.
Major Federal & State Approvals Environmental Business Council of New England Land-Based Wind Energy May 29, 2008 Ruth H. Silman, Esq.
RAILROAD COMMISSION OF TEXAS OIL & GAS INDUSTRY REGULATORY JURISDICTIONS Gaye Greever McElwainAnn Marie Callery RRC Public OutreachTCEQ Small Business.
Page 1 Copyright © ALL Consulting, All Rights Reserved January 3, 2003ALL Consulting Overview of Coal Bed Natural Gas Best Practices and Mitigation.
Local Control of Mining Rights Counties Often Have Comprehensive Land Use Plans –These may be implemented through zoning –Often require construction permit.
DMME RAP Meeting September 24, EIA Regulation – Outline 9VAC15-20 “Guidelines for the Preparation of Environmental Impact Assessments for Oil or.
Unit 4: Tourism and the Environment.  Natural environment being destroyed because of greed.  Wetlands, marshes, forests disappearing for buildings,
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Guidelines for the Exploration and Development of Geo Power Paul Morgan Colorado Geological Survey for the Colorado Geothermal Working Group Final 2011.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Chapter 45 Environmental Protection and Global Warming.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
1 Bureau of Ocean Energy Management Assessing Historic Properties and Cultural Resources in the Main Hawaiian Islands Dave Ball, MA, RPA Pacific Region.
Brown Redevelopment Field Tierra, Willie, Diamond.
Jeopardy $100 Land + SeaTrash/MinesPollutionWater Miscellaneous $200 $300 $400 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100 $500 $400 $300 $200 $100.
Section 3: Mining Regulations and Mine Reclamation
New Mexico Uranium Exploration & Mining BLM Uranium Workshop August 12, 2008 Salt Lake City, Utah Holland Shepherd, Program Manager Mining Act Reclamation.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Wildlife Agencies Government Organizations that Work for Wildlife.
ENVIRONMENTAL RESOURCES HAMPTON BAYS 2011 GEIS FINAL DRAFT Mary Jean Green HBCA Board Member.
DOE ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP Natural Resource Trusteeship John J. Bascietto
3D Technology and the Section 106 Process Matt Diederich Archaeologist Oregon State Historic Preservation Office (SHPO) Oregon Heritage Programs Division.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
Lynne Welsh Massachusetts Department of Environmental Protection.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption Jeff Bowman, TEEX.
DOE ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP BIOTA PROTECTION Stephen L. Domotor (202)
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
ENVIRONMENTALS LAWS AND ACTS. 1 Established air pollution regulation for key pollutants enforced Set goals and standards for the quality and purity of.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Energy Policy Act – 2005 West-Wide Energy Corridors.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Guide to Permitting Electric Transmission Lines in Wyoming Wyoming Renewable Energy Coordination Committee Presented to Western Governors Association October,
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Barriers and Challenges to Developing Renewable Energy Projects
WHAT DO ALL THESE PLACES
Section 3: Mining Regulations and Mine Reclamation
ENVIRONMENTAL AWS & TREATIES
State and Local Regulation in Oil & Gas
Section 3: Mining Regulations and Mine Reclamation
SEQRA as a Tool to Review Energy Projects
Section 3: Mining Regulations and Mine Reclamation
Section 3: Mining Regulations and Mine Reclamation
Common Control Self-Declaration form
National Act Regulated by EPA
Objectives Describe seven important potential environmental consequences of mining. Name four federal laws that relate to mining and reclaiming mined land.
Resource Conservation and Recovery Act of 1976
Section 3: Mining Regulations and Mine Reclamation
Dr. Jim Thomas Desert Research Institute
WHAT DO ALL THESE PLACES
Chapter 45 Environmental Protection and Global Warming
Presentation transcript:

General Information Name: GRR Test Geothermal Area County: AnyCounty, NV Technology: Geothermal Federal Funding: Yes (Exploration) Project Status Current Project Phase: Well Field Development Estimated Gross Production: 25 MW Estimated Net Output to Grid: 20 MW Ownership Information Surface Owner: Federal Manager: U.S. Forest Service Mineral Owner: Federal Manager: Bureau of Land Management Edit Continue PROJECT INFO Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

General Information Name: Location: Technology: This project has received federal funding: Yes No Select all project phases that have received federal funding: Exploration Well Field Power Plant Transmission Continue GRR Test Geothermal Area Geothermal AnyCounty, NV PROJECT INFO ? ? ? ? Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Project Status Current Project Phase: Estimated Gross Production:MW Estimated Net Output to Grid:MW(after any losses, such as due to well field pumping) Continue 30 Well Field Development 25 PROJECT INFO ? ? ? ? Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Surface Ownership Information Which best describes the surface location of this project? Project is entirely on private land Project is entirely on federal land Project is entirely on state land Project is entirely on tribal land The land ownership is mixed Which federal agency manages the land surface? Bureau of Land Management U.S. Forest Service Bureau of Reclamation Department of Defense ? ? ? ? Continue PROJECT INFO Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Surface Ownership Information Which best describes the surface location of this project? Project is entirely on private land Project is entirely on federal land Project is entirely on state land The land ownership is mixed For each project phase, select a surface owner ? ? ? ? Continue Project PhaseSurface Owner ExplorationNone specified Well FieldNone specified Power PlantNone specified TransmissionNone specified Access (e.g. roads)None Specified PROJECT INFO Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Mineral Ownership Information Which best describes the mineral ownership of this project area? The mineral rights are entirely privately owned The mineral rights are entirely federally owned The mineral rights are entirely state owned The mineral ownership is mixed Which federal agency manages the mineral rights? Bureau of Land Management U.S. Forest Service Bureau of Reclamation Department of Defense ? ? ? ? Continue PROJECT INFO Home Project Info Leasing Exploration Well Field Power Plant Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Ownership The following describes the land and mineral ownership for the location of the exploration activities to be conducted Lease There is a federal lease in placeYes (only listed if both surface and mineral are federally owned) Land Use Planning The proposed exploration activity does not need to be included in a land use plan Continue EXPLORATION Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply ? ? ? ? ? ? Update Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit Project PhaseSurface OwnerMineral Owner ExplorationFederal (USFS)Federal (BLM)

Activities One or more of the proposed exploration activities will be invasiveYes The developer plans to complete the Exploration Pre-Application Process Yes The project will use ground water for exploration activitiesYes The exploration well will be cased longer than 60 daysYes The exploration permit requires a modificationYes The initial survey indicates a potential geothermal well fieldYes Continue EXPLORATION Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply ? ? Update Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? ? ? ? ? ? ?

? ? Continue EXPLORATION SearchDocument CenterPermit ListBookmarksHelpSave & Exit Update Construction for Well Field Activities The following questions must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. The exploration activity requires transporting construction Yes equipment or materials on state roads The exploration activity will encroach on a state or local right of wayYes The exploration activity will cause storm water to disturb soilYes The exploration activity requires demolishing an existing structureYes The exploration activity requires an exception from local zoning regulationsYes ? ? ? ? ? ? ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction

Environmental Evaluation The activity includes a major federal action Yes Continue EXPLORATION ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit Update

Federal Nexus Surface OwnershipFederal (USFS) Mineral OwnershipFederal (BLM) Federal Funding for Exploration: Yes Resources Tribes and cultural resources Flora and fauna Previous land uses Water resources Air quality Geological resources Aesthetic resources Waste and/or hazardous waste Continue EXPLORATION ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction Update SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Tribal and Cultural Resources The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Is there potential for the activities to cause effects on historic properties? (Sec 106 subsection?) YesNo Is there concern about impacts to Native American or Native Hawaiian Interests? YesNo Continue EXPLORATION ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit

Flora and Fauna Resources The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Are protected species present at the activity location? (If no – ends here) YesNo Is there potential for the activity to take migratory birds or eggs? YesNo Are nesting or wintering bald or golden eagles present at the activity location? YesNo Is there potential to impact marine mammals or their habitats? YesNo Continue EXPLORATION ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ?

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity affect farmland or livestock? YesNo Will the activity affect military lands? YesNo Will the activity affect navigable waters? YesNo Will the activity affect airports? YesNo Will the activity involve contaminated lands? YesNo Continue EXPLORATION ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? Previous Land Uses ? ?

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity affect waters of the United States? YesNo Will the activity require a point source discharge of a pollutant? YesNo Will the activity require the dredge and fill of wetlands? YesNo Will the activity impact a source water protection zone? YesNo Will the activity discharge to the groundwater? YesNo Is the Discharge regulated under the state groundwater protection program or underground injection control (UIC) program? Ground Water ProtectionUIC Continue EXPLORATION ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? Water Resources ? ?

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Are there paleontological resources on the site? YesNo Will there be impacts to significant geological resources? YesNo EXPLORATION Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit Geologic Resources ? ? ? ? Continue

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity require use of an underground storage tank? YesNo Will the activity require use of an aboveground storage tank? YesNo Is a non-excluded hazardous waste discovered at the activity site? YesNo Will the activity generate a non-excluded hazardous waste? YesNo Will the activity dispose of solid waste? YesNo EXPLORATION Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit Waste and/or Hazardous Waste ? ? ? ? ? ? ? ? ? ? Continue

Water Supply State level questions here Edit Continue EXPLORATION ? ? ? ? ? ? Home Exploration Leasing Well Field Power Plant Transmission Operation Project Info Land Environmental Resources Water Supply Activities Construction SearchDocument CenterPermit ListBookmarksHelpSave & Exit

? ? ? ? Continue WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Ownership The following describes the land and mineral ownership for the location of the exploration activities to be conducted Lease There is a federal lease in placeYes (only listed if both surface and mineral are federally owned) Land Use Planning The proposed exploration activity does not need to be included in a land use plan Update ? ?

Activities The developer plans to complete the Well Field Drilling Pre-Application Process Yes The project will use the well for production; and re-inject all of the produced fluidYes The existing drilling permit requires a minor changeYes ? ? WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Update ? ? ? ? Continue

? ? WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Update Construction for Well Field Activities The following questions must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned well field activities. The drilling activity requires transporting construction Yes equipment or materials on state roads The drilling activity will encroach on a state or local right of wayYes The drilling activity will cause storm water to disturb soilYes The drilling activity requires demolishing an existing structureYes The drilling activity requires an exception from local zoning regulationsYes ? ? ? ? ? ? ? ? Continue

WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Update Environmental Evaluation The activity includes a major federal action Yes ? ?

Continue WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Update Federal Nexus Surface OwnershipFederal (USFS) Mineral OwnershipFederal (BLM) Federal Funding for Exploration: Yes Resources Tribes and cultural resources Flora and fauna Previous land uses Water resources Air quality Geological resources Aesthetic resources Waste and/or hazardous waste ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

Continue WELL FIELD Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply Update Tribal and Cultural Resources The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned well field development activities. Is there potential for the activities to cause effects on historic properties? (Sec 106 sub-section?) YesNo Is there concern about impacts to Native American or Native Hawaiian Interests? YesNo ? ? ? ?

Flora and Fauna Resources The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Are protected species present at the activity location? (If no – ends here) YesNo Is there potential for the activity to take migratory birds or eggs? YesNo Are nesting or wintering bald or golden eagles present at the activity location? YesNo Is there potential to impact marine mammals or their habitats? YesNo Continue ? ? ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? WELL FIELD Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity affect farmland or livestock? YesNo Will the activity affect military lands? YesNo Will the activity affect navigable waters? YesNo Will the activity affect airports? YesNo Will the activity involve contaminated lands? YesNo Continue WELL FIELD ? ? ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? Previous Land Uses ? ? Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity affect waters of the United States? YesNo Will the activity require a point source discharge of a pollutant? YesNo Will the activity require the dredge and fill of wetlands? YesNo Will the activity impact a source water protection zone? YesNo Will the activity discharge to the groundwater? YesNo Is the Discharge regulated under the state groundwater protection program or underground injection control (UIC) program? Ground Water ProtectionUIC Continue WELL FIELD ? ? ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit ? ? ? ? Water Resources ? ? Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Are there paleontological resources on the site? YesNo Will there be impacts to significant geological resources? YesNo WELL FIELD SearchDocument CenterPermit ListBookmarksHelpSave & Exit Geologic Resources ? ? ? ? Continue Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities. Will the activity require use of an underground storage tank? YesNo Will the activity require use of an aboveground storage tank? YesNo Is a non-excluded hazardous waste discovered at the activity site? YesNo Will the activity generate a non-excluded hazardous waste? YesNo Will the activity dispose of solid waste? YesNo WELL FIELD SearchDocument CenterPermit ListBookmarksHelpSave & Exit Waste and/or Hazardous Waste ? ? ? ? ? ? ? ? ? ? Continue Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

Water Supply State level questions here Edit Continue WELL FIELD ? ? ? ? ? ? SearchDocument CenterPermit ListBookmarksHelpSave & Exit Home Leasing Exploration Well Field Transmission Operation Well Field Project Info Power Plant Land Activities Construction Environmental Resources Water Supply

POWER PLANT Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Project Info Land Activities Construction Environmental Resources Water Supply Update ? ? ? ? ? ? Power Plant Activities The Facility is a cogeneration facilityNo The facility is an independent power producer that exclusively sells to wholesale customersYes The facility will require a CPCN from a state public utility regulatory authorityYes Continue

POWER PLANT Home Leasing Exploration Well Field Transmission Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Project Info Land Activities Construction Environmental Resources Water Supply Update ? ? ? ? ? ? Power Plant Construction for Power Plant Activities The power plant construction requires transporting construction Yes equipment or materials on state roads The power plant construction will encroach on a state or local right of wayYes The power plant construction will cause storm water to disturb soilYes The power plant construction requires demolishing an existing structureYes The power plant construction requires an exception from local zoning regulationsYes The facility involves construction of a power plantYes The power plant requires a county use permitYes The power plant will provide non-municipal drinking waterYes The power plant construction will require building a new structure, Yes grading land or plumbing ? ? ? ? ? ? ? ? ? ? ? ? Continue

TRANSMISSION Home Leasing Exploration Well Field Operation SearchDocument CenterPermit ListBookmarksHelpSave & Exit Project Info Land Activities Construction Environmental Resources Water Supply Update Transmission ? ? ? ? Power Plant Activities The facility will negotiate an interconnection agreementYes The transmission will be located within the NIETCYes The transmission line is over 200 kV, outside an incorporated city, Yes and not required to be underground. ? ? Continue

PERMIT LIST Home Leasing Well Field Power Plant Transmission Operation Project Info SearchDocument CenterPermit ListBookmarksHelpSave & Exit SectionPermitAgencyContactStatus Exploration 4-FD-aNotice of Intent to Conduct Geophysical Exploration BLM Nevada Winnemucca District Office 5100 E. Winnemucca Blvd. Winnemucca, NV John D’Amo District Geothermal Lead (715) Triggers 4-NV-a Exploration Show: All | Triggered | Not Triggered DRAFT: 6/26/2013