Www.delta.uni-dortmund.de/~robert 1 First Experiences in Operating the n.c. HOM-damped Cavity with Beam Robert Heine, Thomas Weis & Group Universität Dortmund.

Slides:



Advertisements
Similar presentations
ESLS-RF Meeting 2004 Status of the HOM Damped Cavity Project E. Weihreter / BESSY Project funded by the EC under contract HPRI-CT for the HOM.
Advertisements

ESLS 04 Daresbury Laboratory
RFQ Cooling Studies.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
SPEAR3 short pulse development J. Safranek for the SSRL accelerator physics group* Outline: Timing mode fill patterns Short bunches –Low alpha Bunch length.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
KAGEYAMA, T. Open Meeting for Proto-Collaboration March 19, 2008.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Ivan Bazarov, New Tool for Beam Break-up Simulations, SRF mtg, 9 April CHESS / LEPP New tool for beam break-up analysis y z y x EB injected beam.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
Simulation of Beam Instabilities in SPring-8 T. Nakamura JASRI / SPring-8
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
February 2010 ALBA Synchrotron Light Source Francis Perez.
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
A 350 MHz, 200 kW CW, Multiple Beam IOT Lawrence Ives, Michael Read, David Marsden, R. H. Jackson, Thuc Bui Calabazas Creek Research, Saratoga, CA. USA.
1 Consequences of RF system failures during LHC beam commissioning T.Linnecar AB-RF.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Transverse Damping Requirements
CEPC APDR Study Zhenchao LIU
Bocheng Jiang SSRF AP group
LINAC AG • IAP • Goethe Universität Frankfurt
Considerations on RF systems of SPPC collider and its injector chain
Physics design on Injector-1 RFQ
HOM power in FCC-ee cavities
Cavity-beam interaction and Longitudinal beam dynamics for CEPC DR&APDR 宫殿君
TTC meeting, Feb. 6-9, 2018, Milan Trouble Shorting of CW Operation of Superconducting Linac for Chinese ADS Yuan He, Yongming Li, Xinmeng Liu, Zheng Gao,
CEPC RF Power Sources System
CEPC APDR SRF considerations(3)
Operations Department
PETRA IV System design concept Old and new machine
Harmonic RF systems for ESRF-EBS - Preliminary considerations -
Status of the ASTRID2 RF systems
CEPC Ring RF System Jiyuan Zhai (IHEP) Workshop on the Circular Electron Positron Collider Rome, May 25, 2018.
CEBAF Pulsed Operation for JLEIC Electron Injection
CEPC SRF Parameters (100 km Main Ring)
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Parameters Changed in New MEIC Design
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

1 First Experiences in Operating the n.c. HOM-damped Cavity with Beam Robert Heine, Thomas Weis & Group Universität Dortmund Institut für Beschleunigerphysik und Synchrotronstrahlung Maria-Goeppert-Mayer Straße 2 D Dortmund

2 Contents Preparations for the in-situ beam test Experiences with the cavity & RF-data Development of pressure, current & lifetime CBM measurements and estimations Summary & Outlook

3 Before reconstructionAfter reconstruction Oct until Sep RF-Section with DORIS-Cavity Presented at the Karlsruhe meeting

4 Preparations For A „Small“ Test

5 The cavity was preconditioned up to 30 kW (thermal load, CW) at BESSY and delivered to DELTA (17.May `04). Reconditioning within one day (0-30 kW, 5% duty cycle) (02.Jun. `04) 28 kW CW were reached the next day. Vacuum conditioning at 20 kW CW 28.Jun. `04: First beam stored with EU-cavity up to 25 mA 29.Jun. `04: Vacuum limited 60 mA stored 30.Jun. `04: 100 mA stored. 14.Jul. `04: 130 mA stored. (I max of DELTA) The Inserted HOM-damped Cavity

6 RF Data Shuntimpedance from low power measurements: R s = 3.1 M  (EPAC04, F.Marhauser, E.Weihreter) Shuntimpedance from synchrotron frequency & cavity losses: Shuntimpedance from quantum lifetime: f s = kHz, P loss = kW, f RF = MHz, W 0 = 152 keV (SAW)  U RF = kV  R s = 2.84 M  ± 10% E = GeV, h = 192,  = , I = mA I = 1 mA, P loss = 4.71 kW  = 1 s W o = keV  U RF = 167 kV  R s = 2.96 M  ± 10%

7 RF Data Shuntimpedance from reflected power: Resonator (77±2) mA I = 77 mA,  c = 1.7 W 0 = 152 keV (SAW) U RF = kV  R s = 3.34 M  ± 10%

8 RF Data Quality factor from low power measurements: Q L = 9900 Quality factor from high power measurements Q L = 9200 ± 5%

9 First Weeks of Beam Operation current integrated current lifetime integrated lifetime machine dedicated week 2.36 Ah =71 mAh

10 First Weeks of Beam Operation current integrated current lifetime integrated lifetime user dedicated week 4.78 Ah =174 mAh

11 First Weeks of Beam Operation current integrated current lifetime integrated lifetime user dedicated week 5.63 Ah =227 mAh

12 First Weeks of Beam Operation current integrated current lifetime integrated lifetime user dedicated week 5.65 Ah =245 mAh

13 Pressure Evolution During Operation Pressure dropped nearly one order of magnitude within 4 weeks No multipacting in HOM-dampers with beam

14 First Measurements with the EU-Cavity CBM 55 Threshold at 95 mA. related to a cavity HOM? 27.& 28.Jul. 04 (user week) CBM-No. Ampl [°]

15 Impedance Thresholds of the HOM-damped Cavity in DELTA 130 mA 100 mA CBM65 CBM13 None of the modes maps to CBM 55! MAFIA simulation and mode measurement: F. Marhauser f [MHz] R S [  ] CBM23 CBM105

16 CBM-Measurements with DORIS-Cavity (w. Damper) CBM 53 CBM 65 CBM 42 Filling pattern: 64/192 in 4 Trains of 6 Buckets 15. Sep. 04

17 CBM-Measurements with DORIS-Cavity (w. Damper) CBM 55 Pattern: time 58 Same CBM exited as with EU-Cavity  Pattern induced! Typical structure when CBM 55 excited 16. Sep. 04

18 Summary Successful test with 1.5 GeV up to 130mA (nominal DELTA current) No cavity induced collective mode found Straight forward RF DELTA Reasonable development of vacuum pressure No multipacting in HOM-dampers during beam operation Due to removal of cavity no low energy test by now

19 Outlook All HOM-dampers sent to Zanon for revision Strong interest for a second beam test DELTA No final decision by committees yet

20 Thanks to Collaboration partners & DELTA-group

21 END.