1 W2GPS, Nov 9, 2002 AMSAT OSCAR-E AMSAT AO-E Project Team Dick Daniels, W4PUJ – Project Manager Rick Hambly, W2GPS Tom Clark. W3IWI Report Presented by.

Slides:



Advertisements
Similar presentations
Overview of this presentation: Introduction to the BLUEsat Project What are the objectives of this thesis project Overview of testing and integration.
Advertisements

Radio over Internet Protocol
Tri-Band RF Transceivers for Dynamic Spectrum Access By Nishant Kumar and Yu-Dong Yao.
1 C-C RIDER – A new concept for amateur satellites Tom Clark, W3IWI ______________________________________________________________ 2003.
The ARISS S Band Beacon/Transponder Project. S Band Beacon There is a new S Band beacon and transponder being planned for the ISS-Ham station. This device.
EE302 Lesson 21: Transmission of Binary Data in Communication Systems
DIGITAL COMMUNICATIONS.  The modern world is dependent on digital communications.  Radio, television and telephone systems were essentially analog in.
1 W2GPS, Oct 18, 2003 AMSAT OSCAR-E AMSAT OSCAR-E Project Fall 2003 Status Report Report Presented by Richard M. Hambly, W2GPS 21 st Space Symposium and.
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
ECE 5233 Satellite Communications
Modular Nanosatellites as Amateur Radio Communication Platforms Funded by the New Hampshire Space Grant Consortium Gus Moore; Todd Kerner, KB2BCT; Amish.
1 November 10, 2006Team # 7103 M.E.T.E.O.R. Instrumentation Platform Sponsor: Harris Corporation Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.
AAE450 Senior Spacecraft Design Dorrie Byford Week 1: January 18 th, 2007 Communications Group Leader / Autonomous Rendezvous Team Member / Website Designer.
US Naval Academy LABsats Bob Bruninga, WB4APR AIAA JHU/APL Educational Seminar 10 Nov 2006.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
Communication and Ground Station 12 October 2008.
Club Program for October 2006 By Rick Sohl – K5RIC.
1 SD Recorder OS-TM-V701A for Driving Security Surveillance.
ESTeem Training Class ESTeem Overview. ESTeem Product Categories Licensed Serial – Long Range Application – Exclusive Use of FCC Frequency – PLC Emulation.
1 W2GPS, May 17, 2003 AMSAT AO-E Project Spring 2003 Status Report Presented by Richard M. Hambly, W2GPS AMSAT Forum - Hamvention 2003 Saturday, May 17,
COMS Transceiver – RF DataTech LRT470 Frequency: MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth:
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Tony Monteiro, AA2TX VP, Engineering AMSAT Forum Dayton Hamvention 2011 AMSAT FOX.
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Data Handling—Intro Lesson 23 Spring 2005.
An Enhanced/Permanent Amateur Radio Station Proposal L. McFadin, W5DID K. Banke N6IZW
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
ISS-HAM Slow Scan Television (SSTV) Project A joint AMSAT-NA And MAREX-NA Project.
Bob Bruninga US Naval Academy Small Satellite Program Sponsor: US Naval Academy UNCLASS DoD Space Experiments Review Board.
RUDAK DSP Experimentation June & July 2002 Contributions to this presentation by: KK7P, WD0E, 4X1KX.
PSK31 Digital Mode.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Basic (VHF) Radio Communications
1 W2GPS, May 15, 2004 AMSAT OSCAR-E (“Echo”) AMSAT AO-E Project Spring 2004 Status Report Presented by Richard M. Hambly, W2GPS AMSAT Forum - Hamvention.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
AMSAT-NA Annual Meeting
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
22/06/101 The FUNcube Project RSGB-October /06/102 Introduction Background information about AMSAT and AMSAT-UK Brief history of “OSCAR” satellites.
2.4 GHz CubeSat Communications System Robert Bui Communications Subsystem Lead.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
2010 Olin Project Idea Keith Gendreau Jeff Livas
1 EE 499 Wireless Communications Project by Team 4: Arati NagarkarHemant Samtani Supriya HerwadkarChinmay Shete Shivani KaushalSalil Sawhney.
Digital Transmission Outlines:- Multiplexing FDM TDM WDM
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 U/v Transponder Bill Ress – N6GHz
THE PAST THE PAST 3 SPUTNIK l Sputnik – Oct 4, st satellite. 20 MHz beacon. 47 years ago. l Oscar 1 – Dec 12, st amateur satellite l.
Amateur Satellites Pt. II How to work the easy sats on a budget.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
ARISSat-1 Overview ARISSat-1 Team Space Symposium 2010.
HiSeasNet Modems 1SIO Aug '09. Spectrum analyzers  aka “SpecAn”  Measure energy in a given frequency bands  Axes are frequency (x-axis) and RF energy.
USNA-203 Space Communications International Educational Network … Classroom Experience Navy SERB: 28 Aug 2002 Lt Col Billy R. Smith, Jr., USAF USNA Small.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
Modulation What is modulation?
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 SDX Module Anthony Monteiro
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
CINEMA PDR, UCB/SSL 1 August 22, 2008 CINEMA Communications & Ground Systems Manfred Bester.
Antenna Arrays and Automotive Applications
Chapter4 Transmitter and Receiver Applications AM and FM Radios
8.5 SATELLITE COMMUNICATIONS
Feb. 2, 2004 Prof. Paul Lin 1 CPET The Physical Layer - Signal Encoding & Modems Paul I-Hai Lin, Professor Electrical and Computer Engineering Technology.
Satellite Communications System
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
AMSAT-SA Digital Transponder, telemetry and command system.
EARTH SEGMENT & SPACE LINK
KOMUNIKASI DATA Materi Pertemuan 10.
AMSAT Engineering Program
Communication Systems.
ECE 5233 Satellite Communications
The FUNcube Project – the background
ECE 5233 Satellite Communications
Building The AfriCUBE Transponder.
9-July-2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [DecaWave Proposal for TG3c Alternative PHY]
Presentation transcript:

1 W2GPS, Nov 9, 2002 AMSAT OSCAR-E AMSAT AO-E Project Team Dick Daniels, W4PUJ – Project Manager Rick Hambly, W2GPS Tom Clark. W3IWI Report Presented by Richard M. Hambly, W2GPS 20th Space Symposium and AMSAT-NA Annual Meeting Saturday, November 9, 2002, 08: :00 CST Lockheed Martin Recreation Area (LMRA), Bryant Irvin Road, Fort Worth, TX

2 W2GPS, Nov 9, 2002 AMSAT OSCAR-E and "Eagle" l AMSAT OSCAR ‑ E is a new LEO satellite from AMSAT-NA. l “Eagle” is a new HEO satellite being developed by AMSAT- NA.

3 W2GPS, Nov 9, 2002 AMSAT OSCAR-E (AO-E) l AMSAT-NA is back in the satellite business! »12 years since AMSAT-NA built and launched the original Microsats, AO-16, DO-17, WO-18, and LO-19 in »8 years since AMRAD-sponsored AO-27 was launched in l AMSAT OSCAR ‑ E is a new Low Earth Orbit (LEO) satellite »AMSAT is returning to the practice of designating LEO satellites by sequential characters. This was last done for AMSAT OSCAR ‑ D, which became AMSAT OSCAR ‑ 8. l Space and power are available for one or more optional payloads that will be provided by AMSAT volunteers.

4 W2GPS, Nov 9, 2002 AO-E Historical Background The AMSAT Board, Project Team and SpaceQuest personnel 20 ‑ Apr ‑ 02 l 08-Oct-01 BOD initiated review of “a new small satellite project.” l 17 ‑ Jan ‑ 02: BOD unanimously approved the project. Project team is W4PUJ, W3IWI, and W2GPS. l 08 ‑ Feb ‑ 02: AMSAT ‑ NA entered into agreement with SpaceQuest. l 20 ‑ Apr ‑ 02: BOD review at SpaceQuest. Launch set late ‘03. l 05 ‑ May ‑ 02 Spring AMSAT-DC symposium - AO-E presentation. l 18 ‑ May ‑ 02: Presentation at Dayton Hamvention AMSAT Forum.

5 W2GPS, Nov 9, 2002 AO-E Historical Background l May/June AMSAT Journal - Full details of the project. l Summer 2002 CQ/VHF magazine – Full reprint of the Journal article. l 7-Sep-02: Presentation at AMSAT Forum at Fall Fest 2002, Howard County Fairgrounds, West Friendship, MD. l 5-Oct-02: Project review at SpaceQuest. l Sep/Oct AMSAT Journal – Project update. l 9-Nov-02: Presentation at AMSAT-NA 20th Space Symposium. l Winter 2002 CQ/VHF magazine – Full reprint of the Journal article.

6 W2GPS, Nov 9, 2002 AO-E Introduction l Microsat class spacecraft (~10 kg). l Six (was five) solid aluminum trays stacked to form a 9.5-inch cube structure. l Six solar panels, one on each side. l Antennas on top and bottom. l Similar to original Microsats »AO-16, DO-17, WO-18, LO-19 l Similar to the descendents of that legacy »IO-26, AO-27, MO-30, SO-41. Dick Daniels W4PUJ at SpaceQuest 28_Feb-2002

7 W2GPS, Nov 9, 2002 AMSAT OSCAR-E (AO-E) Summary l Analog operation including FM voice. l Digital operation including high speed APRS. l High downlink power. l Multiple channels using four Rx and two Tx. l Can be configured for simultaneous voice and data. l Has a multi-band, multi-mode receiver. l Can be configured with geographically based personalities. l Has a true circular UHF antenna »Maintains its circularity over a wide range of squint angles. l High data rates on downlinks, up to at least 56Kbps. l Advanced power management system. »Autonomous, self-healing, high efficiency. l Store and forward »Continuous monitoring and geographically defined data forwarding.

8 W2GPS, Nov 9, 2002 AO-E Block Diagram l Four VHF receivers l One Multi-Band Multi-Mode Rx l Two UHF transmitters l Six modems l Flight computer l RAM disk l Batteries l Battery charger and regulators l Wiring harness l RF cabling l RF switching and phasing networks l 56 channels of telemetry l Magnetic attitude control

9 W2GPS, Nov 9, 2002 AO-E Status Update Structure l The physical structure »Receiver tray: 58mm with 2mm base. »CPU tray: 24.8mm with 2mm base. »Charger tray: 24.8mm with 2mm base. »Battery tray: 38mm with 2mm base. »Payload tray: 58mm with 2mm base. »Transmitter tray: 39mm with 9mm base. l One empty module for AMSAT payload. 200 x 220 x 56mm. »Trays available by end of year. »This will allow AMSAT to do payload integration at that time.

10 W2GPS, Nov 9, 2002 AO-E Status Update RF Subsystems l Receivers »Four miniature VHF FM receivers (<40 mW and <50 gm each). »Each receiver has 2-channel capability. »Sensitivity is -121dbm for 12db SINAD. l Transmitters »Two UHF FM transmitters that can be operated simultaneously. »7-12 watts output each. »Frequency agile in 20 or 35 KHz steps, tunable over about 20 MHz. l Wideband Receiver »All-mode, “DC to Light”. Performance limited by broadband antenna.

11 W2GPS, Nov 9, 2002 AO-E Status Update RF Subsystems l Antennas. »VHF 18” whip on top. »UHF Turnstile on bottom. Currently LHCP. Might change. »L and S band whips on bottom. »Broadband HF/VHF/UHF 18” whip on bottom. Design issues remain. »The design is still open within the constraints of the solar panel layout. It is now possible to put antennas in any corner or in the center of any panel on the satellite. l Link Budget »Tx’s adjustable from 1 to 12 Watts with max efficiency at 8 Watts. »Modulation is GMSK at any speed from 300 to 56K baud. »Antenna gains average about 0dbi. (-10dbi to +2dbi). »VHF antenna feeds a BPF with 1.5db loss, then an LNA with 1db NF. Thus, overall Rx performance is -123 dbm for 12db SINAD.

12 W2GPS, Nov 9, 2002 AO-E Status Update Central Processor l Central processor hardware »Will have improved Integrated Flight Computer (IFC) recently developed by Lyle Johnson KK7P. »Two CTCSS decoders. »Audio recorder for WB Rx. »Available for AMSAT testing by Jan. »A prototype CPU is running now. l Spacecraft flight software »The Spacecraft Operating System (SCOS) has been used on all of the Amateur Radio Microsat projects to date. »Harold Price continues to allow AMSAT to use SCOS in AO-E. »Bob Diersing N5AHD has agreed to update the boot loader SW.

13 W2GPS, Nov 9, 2002 AO-E Status Update Power generation and distribution l Six high efficiency Solar Panels »Triple junction MCORE GaAs cells (~27%). »Total power about 20 Watts when not in eclipse (12-14 Watts per side). l Battery Control Regulator (BCR) »autonomous, fail-safe. »Operates at 50KHz with 89% efficiency. l Matched set of six NiCd cells, 4.4 Ah each, nominal 8 VDC.

14 W2GPS, Nov 9, 2002 AO-E Status Update Other Subsystems l Attitude control »Active magnetic attitude control has replaced passive system. »Doug Sinclair VA3DNS has implemented the torquer rod with electronics. »Subsystem is at SpaceQuest for testing. l Ground Control Software »Bootloader »Housekeeping program »Telemetry Gathering and Reporting program. »All need to be written or re-written by AMSAT volunteers!

15 W2GPS, Nov 9, 2002 AO-E Space for Optional Payloads l Advanced Data Communications for the Amateur Radio Service (ADCARS) l L-Band/S-Band Communications System l Robust Telemetry Link l GPS Receiver l Active Magnetic Attitude Control l Audio Recorder Experiment l Low Frequency Receiver l APRS l PSK-31 l Multi-band Receiver/Antenna l High Efficiency Solar Arrays

16 W2GPS, Nov 9, 2002 Advanced Data Communications for the Amateur Radio Service (ADCARS) l Wide-band TDMA single frequency data link for multiple simultaneous users and modes. »voice, data, video, telemetry, etc. l S-band downlink, due to bandwidth requirements. l L-band uplink. l Optional signal regeneration. l Optional integration with on-board systems. »File transfer »Telemetry Apply digital encoding techniques to improve communication links and bandwidth utilization. Channel capacity: where: C = channel capacity, bits/sec B = channel bandwidth, Hz S = signal power, W N = noise power, W »Data communication »MPEG recordings

17 W2GPS, Nov 9, 2002 Robust Telemetry Link Proposal for a FEC-Coded Telemetry Link A short, deep fade that causes a single bit error is enough to destroy an entire frame even if the average Eb/No is high. AO-40’s 11-second frame has multiple deep fades when the antennas are not earth-pointing so every frame is almost guaranteed to have at least one bit error. With FEC the bits corrupted in a fade can be regenerated from the others that are received. It doesn't matter how deep the fades are, as long as most of the frame gets through AO-40 S-band telemetry as received by W2GPS and WB4APR using the 12-meter dish at the US Naval Academy on January 18, The time span is 3.38 seconds, the spin period at that time.