Innovative PPP Financing: Performance Based Annuity Water PPPs Workshop GoMP and ADB Bhopal February 27, 2009 IDFC LtdIndia PPP Capacity Building Trust.

Slides:



Advertisements
Similar presentations
OECD GLOBAL FORUM ON SUSTAINABLE DEVELOPMENT FINANCING WATER INFRASTRUCTURE FOR ALL.
Advertisements

STATE REVOLVING FUNDS: THE INDIAN CONTEXT PARIS 2003.
Water Services for the Poor – the Manila experience Global Forum on Sustainable Development Paris, France December 18, 2003.
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Rudolf Frauendorfer Asian Development Bank
OECD Water Programme Sustainable Financing to Ensure Affordable Access to Water and Sanitation EUWI Finance Working Group World Water Week Stockholm, Aug.20.
Public Debt Management with emphasis on PPP 1 Ministry of Finance 08 th Dec 2014.
International Models for Affordable Housing: Lessons from the United Kingdom The Euromoney Egypt Housing Finance Conference - 25 May 2009 Trowers & Hamlins.
Company LOGO Performance- or Output-Based Procurement (PBP): Basics and Applications in Bank Projects Patricia Baquero
Sustaining Secure Water for Rural communities- Prospects for Future ? Rajindra de S Ariyabandu Sri Lanka
Lesson 8. 1.Estimate the amount of debt needed to achieve the firm’s goals. 2.Understanding the balance sheet and operating statements. 3.Make the needed.
A Delegated Management Model to Improve Water Supply Delivery within Informal Settlements: Lessons learned from Nyalenda, Kisumu. Alain MOREL Sr Water.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Cross-Border Infrastructure: A Toolkit Universal Service Session on Regulation & Accountability Max Bradford Castalia The views expressed here are those.
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
Financing Urban Public Infrastructure
Econ – Chapter 13 – Outline #1. I. Savings and Financial System = An economic system must be able to produce capital if it is to satisfy the wants and.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
Business in Contemporary Society Factors Affecting the Operation of Business.
ECONOMIC AND FINANCIAL INSTRUMENTS IWRM for River Basin Organisations.
A Microfinance Solution for Water, Sanitation, and Health in Peri-Urban and Rural Areas Presented at the Fifth World Water ForumDr. Richard E. Thorsten.
Source of Funds Roads Implementation Program –Tied Work –Preferred Supplier –Open Market External Market –LGA –Other Government Departments –Utilities.
14 Financial and Economic Aspects 1/13 Content of Lecture 14.1 Costs of solid waste collection, sorting and processing 14.2 Benefits of managing solid.
Public-Private-Partnerships and Finance Patrick Legros* ECARES, ULB * Part of work in progress (Dewatripont-Estache-Grout-Legros)
Payment Mechanisms for PPP Development off PPP and Implementation Possibilities in Latvia Conference, September 2008.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 Mgmt 371 Chapter Twenty Basic Elements of Control Much of the slide content was created by Dr, Charlie Cook, Houghton Mifflin, Co.©
The Challenges of Managing Microinsurance Schemes in Uganda Objective to analyze the challenges of managing micro- insurance schemes in Uganda. (i) Introduction.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
WHAT’S CHANGED POST THE FINANCIAL SUSTAINABILITY INQUIRY? FMG Seminar 27 March 2009 Presented by John Comrie.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Selecting and Designing Concession / PPP Projects Martin Darcy.
Public Private Partnerships (PPPs) and The World Bank
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Krakow, Poland September 24-26, 2014 Results-Based Financing Approaches.
Designing and Implementing an Output- Based Aid (OBA) Project in the Bank Patricia Veevers-Carter, Program Manager Global Partnership on Output-Based Aid.
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
Mainstreaming OBA in the Bank: Urban and Energy Examples Patricia Veevers-Carter Program Manager Global Partnership on Output-Based Aid (GPOBA) Finance,
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
Small Water Utilities Improvement and Financing Project Leila H. Elvas Country Team Leader WSP Philippines.
Urban water supply The privatization process in Mozambique
1 Private Sector Roles in Delivering Public Services: Policy Options for Developing Cities Penelope Brook The World Bank.
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Financing Alternatives in WSPs Patrick Nduati Mwangi, WASPA Conference, September 2011 Water and Sanitation Program.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Chapter Goals... Explain the role of finance for businesses in terms of capital expenditure and revenue expenditure Explore internal finance options –
Understanding finance. Investment and Saving Investment: In an economic sense, an investment is the purchase of goods that are not consumed today but.
Seminar on Public Private Partnerships February PPP Experiences – Challenges and Way Forward Administrative Staff College of India.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Ratio Analysis…. Types of ratios…  Performance Ratios: Return on capital employed. (Income Statement and Balance Sheet) Gross profit margin (Income Statement)
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Finance Citi Funded Entrepreneurship Training Program UNIVERSITY OF DUBAI Dr. Zahi Yaseen.
© 2010 South-Western, Cengage Learning, Inc. All rights reserved.
Market aggregating models – scaling an EE portfolio
State of efficiency in the WASH sector Status quo is not an option
ESCO MODELS IN INDIA Click to begin.
«Water Sector Reform in Kenya »
Financial Appraisal of Project
progress of the water reform in bulgaria
Analyzing and Structuring Financially Sustainable Investments
Water Utility Performance
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Presentation transcript:

Innovative PPP Financing: Performance Based Annuity Water PPPs Workshop GoMP and ADB Bhopal February 27, 2009 IDFC LtdIndia PPP Capacity Building Trust (ICAP)

Significance of the Sector  ADB’s report “Asia Water Watch 2015” estimates that a minimum investment of $8 billion will yield a $54 billion annual return.  Re 1 invested in “access to water” yield Rs. 6 in health, livelihood and education benefits.  10th Five year plan took note of Millennium Development Goals MDG was set in September 2005 at General Assembly in UN the MDGs are a set of numerical and time-bound targets to measure achievements in human and social development To achieve these ends, access to water is most important means  India need Rs. 74,000 Crores for basic urban services by 2020

Financing water  Traditionally it was public financed  Since 1991, alternatives are being explored Municipal Bond Pooled financing Commercial Borrowing PPP  E.g. Revolving Water Community Funds: providing interest free loans to Community Based Organizations (CBOs) Repayments used for additional connections or other schemes (hence revolving)

Need for alternative financing  Cash crunch at ULBs the lack of reliable sources of equity funds in purely public schemes and the  lack of depth in local debt markets which precludes sourcing long-term financing to render tariffs afford afford-able Private investment in public projects getting difficult

Water Project Development  In house: Traditionally done by departments of government  Outsourced Contract for construction and separately for the maintenance Public Private Partnership on BOOT, DBFO formats  Annuity based  User Fee based Community based PPP involving public at actual usage level during O&M phase. Involves payments to the private sector

Input, Processes, Output and Outcomes  Inputs are the resources consumed in producing and delivering a service—such as labor, technology, or physical materials.  Process, which are in place to carry out the service delivery  Outputs are the immediate results of the service provider’s activities—such as the number and quality of the health, education, or infrastructure services provided.  Outcomes are the ultimate effects of services on the community—such as improvements in health or in educational attainment. Outcomes may be influenced by factors other than the activities of the service provider, which distinguishes them from outputs.

The trade off  Payment after output Developer’s need for finance has already passed Less attractive to private partner  Payment before outcome No incentive to early and/or quality output Completion risk with Authority  Initial payment is required for the developer to tie up raw material supply Care must be taken that developer is not barraging hard with supplier

Responsibility of Contractor 2 Responsibility of Contractor 2 Responsibility of Contractor 3 Responsibility of Contractor 3 Responsibility of Contractor 1 Responsibility of Contractor 1 Project Development: Conventional Concept Design Installation Operation Maintenance Conventional Approach So, what are the problems ? 1.Authority has no control on the construction time – Hence, time – overrun 2.Authority has no control on the cost – Hence Cost-overrun 3.Authority has to pay entire cost by the end of the construction – constraint on cash flow 4.Operational involvement 1.Multiple contractors 2.Admin overhead

Contractor’s Cash Flow Construction Period Operations Period $ $ $ $ $ $ $ $ $ $ $ $ $ $ Investment (Outflow) Reimbursement (Inflow) $ $ Authority’s cash outflow Conventional Approach The cash out flow for O&M remains the challenge for the Authority

Conventional approach: What is overlooked ?  The attention is only to the capital cost and not Life-Cycle-Cost (Contractor tend to ensure such quality of construction that it would demand sever maintenance!)  Focus on only part of the story  Subsequent to the commissioning of the system, ULBs were not ready to take on added tasks Not fully equipped, No full trained manpower Hence low collection And strained finances

Responsibility of Contractor 2 Responsibility of Contractor 2 Responsibility of Contractor 3 Responsibility of Contractor 3 Responsibility of Contractor 1 Responsibility of Contractor 1 Concept Design Installation Operation Maintenance Developer’s Responsibility Developer’s Responsibility Conventional Approach PPP Approach So, what about that? 1.Authority only conceives the project 2.Developer would design to required specs 3.Developer to invest money and recover during O&M period 1.Either as User Fee or 2.As Annuity 4.Developer assumes risk of Cost & Time overrun and operations Project Development: PPP

Developer’s Cash Flow: Annuity/User Fee Construction Period Operations Period $ $ $ $ $ $ $ $ $ $ $ $ $ $ Investment (Outflow) Recovery (Annuity/User Fee) $ $ Authority’s cash outflow (In case of Annuity) $ $ $ $ $ $ $ $ $ $ PPP Approach In performance based Annuity, each payment is linked to achievement of performance milestones (pre-specified maintenance standards)

In a Nutshell ConventionalPPP Design RiskAuthority’sDeveloper’s Cash Flow RiskAuthority’sDeveloper’s Cost and Time Over run Authority has no control over it Developer has inherent incentive to control time & cost Operations Period Authority invests substantial time and manpower Independent Engg-monitoring Developer bears the risk of operations Performance Standard The contractor is already paid for, hence no control Future payments to developer are linked to the performance Revenue (Demand) Risk Rests with Authority PPP (Annuity)- with Authority PPP (User Fee) – with the developer

Developer’s Cash Flow-PBDPS Construction Period Operations Period $ $ $ $ $ $ $ $ $ $ $ $ $ $ Investment (Outflow) Recovery (Annuity/User Fee) $ $ Authority’s cash outflow (In case of Annuity) $ $ $ $ $ $ $ $ $ $ PPP Approach Apart from during operations period, the payment is made during construction period also. However linked to pre-specified maintenance standards $ $ $ $ $ $ Recovery (Annuity/User Fee) Authority’s cash outflow (In case of Annuity)

Operational Framework: PBDPS  Detailed (output) specifications for construction;  Detailed maintenance standards (processes) and  In terms of service delivery parameters (user perceived value)  Private developer’s performance to be assessed on specified performance indicators  Hence, involves regular monitoring

Monitoring Mechanism: Option 1 Source: Check List for OBA, Warrick Smith, World Bank

Monitoring Mechanism: Option 2 Source: Check List for OBA, Warrick Smith, World Bank

Using Performance Based Contracts  Clearly set objectives Reached through mutual consent Transparency and honesty Due Diligence  Scope Minute details to be covered beforehand Service Area: Include a map in the agreement  Duration of the Agreement Realistic assessment Scope for fair returns Lease (10-15 yrs) and Concession (20-30 yrs)  Early Termination Triggers Avoid general one-sided clauses favouring authority Source: Guidelines on Performance-based Contracts, OECD

Due Diligence  the utility's current and proposed service area;  current characteristics of service (quantities supplied, metered and paid for);  basic inventory of the assets of the utility as well as of their condition;  if any, current performance standards and the record of achievement thereof;  human resources;  tariffs (level and structure, subsidy arrangements and disconnection arrangements); and  general financial performance. Source: Guidelines on Performance-based Contracts, OECD

Selection of performance indicators  Which indicator best describes developer’s performance Input based- Quality of material, workmanship Output based- user experience, quality of service delivery etc Whether really under control of Developer  Not too many of those; only the most crucial ones  Detailed procedure to measure the indicators  Whether, developer is allowed to invest in equipments needed to measure indicator (waste water reduction)  How much time is required to achieve the targets Too short: difficult/impossible to achieve Too long: wherewithal of the utility to monitor, very limited visible improvement, political risk  Flexibility to accommodate unforeseen-mutually agreed terms  Not only penalties but also incentives  Cross-subsidy: inherent self imposed obstacle to improvement Source: Guidelines on Performance-based Contracts, OECD

Performance Indicators: examples  Financial Performance collection efficiency profitability, current ratio (current assets/current liabilities); operating ratio (operational expenses including or not depreciation/operational revenues); accounts receivable; salary or energy costs as a % of total operating costs; annual income; debt service coverage ratio (relevant in cases where the utility's activities are financed by the proceeds of a loan) Source: Guidelines on Performance-based Contracts, OECD

Performance Indicators: examples  Operational: number of staff (measured against an indicator such as number of person served, area, pieces of equipment, etc.); unaccounted for water; pipe breaks (measured against an indicator such as time period and/or length of the pipe system); reduction of consumer's complaints (billing error, meter malfunctioning, quality of service, etc.); type of consumers’ complaints; response time to consumer's complaints; and metering coverage and metering effectiveness. Source: Guidelines on Performance-based Contracts, OECD

Performance Indicators: examples  Operating Performance: average hours of service; population served; average water production; average water consumption; average pressure in the distribution system and water quality; and water quality indicators. Source: Guidelines on Performance-based Contracts, OECD

Output Based Aid: Andhra Pradesh  The scheme involves a public-private partnership between the Naandi Foundation, a local Indian NGO, Water Health International, a water purification technology provider, and the village councils  A project supported by the Global Partnership on Output-Based Aid (GPOBA) is piloting a project providing safe drinking water to 12,500 poor households in 25 villages in three coastal districts of Andhra Pradesh: Guntur, Krishna, and West Godavari.

Output Based Aid: Andhra Pradesh IndicatorDescriptionCross Check 1 25 UV water Purification Plans/CSWSs installed Construction & Installation of complete CSWS Completion Report for each plant available from the Independent Verification Agent 20% 2 Registration of households Paid Subscription Fees Minimum 500 BPL households registered for paid usage of water; subscription fee received from such households 60% 3 3 months of billed user fee cum of water sold continued usage of paid water by a min 500 BPL Households Billing Records 20%

Target Parameters Parameter Current Status Short Term (0-3 years) Medium Term (3-7 years) Long term (7 + years) Technical Frequency of water supply 2 – 3 days a week for few hours 5 days a week for few days Daily water supply for few hours 24 X 7 water supply Coverage (Population) <50%70%80%90% MeteringNil70% metering100% metering UFW Control30 to 70%< 30%< 20%< 15% Sanitation Coverage < 50%75%90%100% Consumer Redressal System Nil Develop consumer redressal system Response time: < 3 day Response time: < 1 day

Target Parameters ParameterCurrent Status Short Term (0-3 years) Medium Term (3-7 years) Long term (7 + years) Financial Recovery of O&M Costs <40%75%100% Recovery of Full Cost -25%40% 75% in 10 th year Accounting Systems Development No separate accounting system Development of accounting system Implementation Periodic maintenance and review Institutional Framework Sector Database Not available Development & implementation Periodic updation TrainingAdhoc basis 30% of staff trained 100% of staff trained Monitoring & training contd

Thank You

Canals, Bulk Supply Lines Last Mile Connectivity Spectrum Dams, River-lift etc Generation Public Transmission Distribution PPP Conventional Finance New Approach Public PPP Public PPP/Commu nity based

ULBs challenges: The vicious circle Poor Revenue Collection Poor O&M standards Poor Perceived value of service Low Willingness to pay Strain on Finance for newer connections Low Control on leakages and theft

Water Supply Sector: Issues  Political Aspects Water usage charges – a politically sensitive issue While charging user-fees, gross under-pricing of water  Operational Aspect (ULB level) Commercial inefficiencies of ULBs; Sub-optimal service-provision and asset-utilisation and Reactive maintenance;  Private participation a tricky issue financial viability issues, revenue (demand) risk fully passed to the private lack of adequate and reliable database  Community Aspects Still considered as a ‘free good’ by the citizens and; Low willingness-to-pay citing poor service levels- ‘chicken and egg’ problem.

Monitoring  Self sampling reports by developer  Surprise, spot check- audit by authority

Annuity Types  Equal Periodic Amounts Spread equally over the useful life of the assets/concession period.  Front Loaded Higher amounts in initial periods and equal periodic amounts in later part.

Karnataka  ADB-funded North Karnataka Urban Sector Investment Program (NKUSIP) at 25 towns of northern Karnataka  Primarily water supply, UGD, storm water drains (SWD), & roads  PPP- Performance Based Deferred Payment System: PBDPS  The developer is responsible for good quality construction and preventive maintenance over the period of contract  Critical aspect of regular, pro-active O&M is addressed,  Entire market risk not be passed on to developer ULBs could partly retain the same while the project would provide funds for maintenance from the ADB-assistance and earmarked devolution from the GoK.  Project structured with larger upfront payments, so that repay most of the loan in the initial period, reducing his financing costs and also the overall costs of the project.