Clean Water Project.  Completion of the south conveyance tunnel (SCT) is important to meet the requirements of a CT DEP Combined Sewer Overflow (CSO)

Slides:



Advertisements
Similar presentations
Rock Creek Sewer Separation & Water Main Replacement – CSO 031, 037, 053 and 058 Presented to CWEA / WWOA / CSAWWA 2011 Tri-Association Conference Collections.
Advertisements

Onondaga County CSO Abatement Gray Project Update.
Steve White Urban Water Council US Conference of Mayors
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
STORM DRAINS & SANITARY SEWERS. STORM DRAINS WHAT IS A STORM DRAIN? Drains in the ground that conduct water that collects during and after rain and snow.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
EVOLVING CRITERIA FOR STORMWATER MANAGEMENT by Nancy U Schultz, PE, D.Wre. CH2M HILL with many thanks to Jon Schladweiler at
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Fox Valley OperatorsAssociationCMOM Capacity Management Capacity ManagementOperationMaintenance January 2011 C apacity M anagement O peration & M aintenance.
Massachusetts Water Resources Authority Frederick A. Laskey Executive Director 20 Years of Change: Boston Harbor Pollution Abatement Project Timelines.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
Combined Sewer Overflow Program : City of Minneapolis Experience Combined Sewer Overflow Program : City of Minneapolis Experience By - Obafemi Obayemi.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
Response to LDEQ Consolidated Compliance Order and Notice of Potential Penalty.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
Keith Dorn Jesse Mefford Hunter Shealy ceramics.org.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Spokane River Forum 23 May 2011
Utility Extension Project
Green City, Clean Waters: Philadelphia Green Schoolyards
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
CSO’S: PARTNERSHIPS CAN SAVE MONEY AND PROVIDE SOLUTIONS Eric S. Petersen Partner Hawkins Delafield & Wood LLP New York, NY United States Conference of.
CMMA 2010 Owners Session George Robinson II, M.B.A., C.B.A. Commissioner.
Risk management process
Blackstone River Users Conference September 16, 2011.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Effect of Climate Change on Sewer Overflows in Milwaukee WEFTEC 2012 October 2012 Bridging the gap between climate change research and the risk of overflows.
MARCH 1 Risk Management Why carry out Risk Assessment? l Is the project too risky? l Threat intensity? l Improve decision making l Clarification of terms.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Updated Estimates of Impervious Area, Equivalent Residential Units, IA Rate, and Customer Bill Impacts AOBA October 27, 2008.
COMMUNITY IMPROVEMENT DISTRICT Downtown Dutchtown Business Association 1.
Mission 5 By Poseidon's Goldfish (Ellie, Shin Be, Mike and Dyson)
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Connecticut Department of Energy and Environmental Protection.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
Water is way more complicated than H 2 0 Be prepared to come up with some questions when you see a big ?
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Fixing Our City’s Old Sewers How the state is helping In early 2015, New Jersey issued new permits to the 25 communities and sewage treatment plants that.
Beargrass creek. What is a watershed? Where does the water go after a rain event? How does AHS shed water and where does it go? What is an impermeable.
Funding Great Lakes Sewage Infrastructure: Why It’s Critical to Improving Water Quality July 25, 2012 Adam Krantz Managing Director, Government & Public.
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Performance-Based Management for Brownfields - Best Practices and Approaches November 2006 Eliana Makhlouf, Ph.D., P.E. Marsh Environmental Practice.
Sanitary Sewer Overflow (SSO) Consent Decree Update Commissioner Meeting May 18,
Briefing regarding the new State General Stormwater Pollution Control Permit.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
What Is Collateral? Collateral is an asset that is pledged by a contractor to secure a surety bond. It is a form of asset that is readily convertible to.
Presented by Tom Heinemann, CH2MHILL October 2, 2013
Contractor Review and Prequalification
MSD’s Second Annual “Can You Dig It?”
SPU Modeling & Monitoring
Can kill fish and other wildlife
Natural Environment: 0% Impervious Surface Built Environment:
LHC Outfall Sewer.
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Commission Agenda Item # 17
Sacramento Environmental Commission January 2019.
Presentation transcript:

Clean Water Project

 Completion of the south conveyance tunnel (SCT) is important to meet the requirements of a CT DEP Combined Sewer Overflow (CSO) consent order and Storm Sewer Overflow (SSO) consent decree. It will be designed and constructed over an estimated three years.  CSOs from the southwestern part of Hartford will be captured and directed to the SCT, and later SSOs from West Hartford and Newington will be captured and routed to the SCT. This work will relieve the South Branch of the Park River drainage area and reduce the storage otherwise required of the new deep rock tunnel.

 Risk (1) – Discovery of Large Caverns limits site possibilities  Consequence of occurrence - 4  Re-site tunnel  Increased Overall Cost  Increased Time  Likelihood of occurrence – 1  Unlikely to find Limestone under Hartford: Caverns require Limestone  Cost/Time Reserve  20% cost Reserve  40% time Reserve

 Risk (2) – Access to Land for Testing  Consequence of occurrence  Delays in Siting Decisions - 3  Increased Overall Cost  Increased Time  Likelihood of occurrence – 4  Large number of property owners  Weather Uncertainty  Cost/Time Reserve  5% cost Reserve  10% time Reserve

 Risk (3) – Delays due to Addendums ◦ Consequence of occurrence - 2  Delays Award Date and therefore construction ◦ Likelihood of occurrence - 5  Common Occurrence  Cost / Time Reserve  30% cost Reserve  10% time Reserve

 Risk (4) – Lawsuits Challenging Contractor Selection ◦ Consequence of occurrence - 5  Delays Award Date and therefore construction ◦ Likelihood of occurrence – 1  Cost / Time Reserve  20% cost Reserve  20% time Reserve

 Risk (5) – Unknown Conditions (“Unknown Unknowns”)  Consequence of occurrence - 2 ◦ Plan Redesign / Change Orders ◦ Higher Cost ◦ Longer Duration  Likelihood of occurrence – 5  Cost / Time Reserve  25% cost Reserve  25% time Reserve

 Risk (6) – Large Tunneling Equipment Failure  Consequence of occurrence - 4 ◦ Delays ◦ Higher Cost  Likelihood of occurrence - 1  Cost / Time Reserve  10% cost Reserve  50% time Reserve

 Subject to penalties by DEEP  Higher Risks associated with Overflows  Increased Pollution of public waterways  Backed up Houses

 Budget Overruns resulting from delays  Increased cost associated with Unknowns  Penalties for late completion

ScoreConsequenceDefinition 5Very HighProject Failure 4HighSignificant (75%) degradation in project benefits 3ModerateModerate (50%) degradation in project benefits 2LowSmall (25%) degradation in project benefits 1Very LowMinimal (or no) degradation in project benefits ScoreLikelihoodDefinition 5Very HighAlmost certain (>70%) 4HighMore likely than not (>50%) 3ModerateSignificant (>30%) 2LowUnlikely (>5%) 1Very LowVery unlikely (<5%)

 Lots of Test Pits  Public Information Campaign  Attorney Review  Objective Bid Scorecards  Cost and Time Reserves  Bonding of Contractors