A Reliable and Resilient Water Supply and Wastewater Utility for the 21st Century Angela Licata Deputy Commissioner, Sustainability NYCDEP June 7 th, 2013.

Slides:



Advertisements
Similar presentations
Presented by: Ronald O. Nichols LADWP General Manager
Advertisements

Management of New York City’s Watershed Michael A. Principe, Ph.D. Deputy Commissioner New York City Department of Environmental Protection Bureau of Water.
DC Water Town Hall Meeting Series 2013 General Manager George S. Hawkins.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Water is Life: Upgrading Our Infrastructure to Serve You Better.
1 Milwaukee Metropolitan Sewerage District Legislative Audit Bureau November 2003.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
The Future of Infrastructure Investments Carter H. Strickland, Jr. Commissioner, New York City Department of Environmental Protection March 7, 2013.
William Solecki City University of New York – Hunter College
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
CSO Strategies & Financial Management Mayor Gregory A. Ballard City of Indianapolis December 9, 2010.
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
NYC Green Infrastructure Program
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Water Research Foundation Workshop: Benchmarking April 23, 2015.
May 18, 2011 RISING TIDES: West Coast Sea Level Rise Implications for Infrastructure Improvements and Coastal Flood Protection Darryl Hatheway, Sr. Coastal.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Funding Green Infrastructure Solutions: Stormwater Management in Pennsylvania Liz Garland American Rivers ABSTRACT Across the nation, American Rivers is.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
City of Houston Long Range Financial Management Task Force City Financial Overview Part I August 29,
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Incorporating Affordability Concerns in Water and Wastewater Utility Planning September 2013.
Impacts of climate change on the Chicago River system.
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
1 Public Hearing User Rate Adjustments April 8, 2008.
GEFA Loan Programs CDBG Applicants Workshop Michael Roberts Program Manager Water Resources Division December 4, 2015.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
Modernization of Municipal Wastewater Approvals Program Water Environment Association of Ontario – Utility Management Forum October 19, 2015.
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Rates Prop. 218 Hearing February 15, 2011.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
FY 2011 Organizational Initiatives October 12, 2010.
New York City, Sustainability, and Human Rights Ramin Pejan, UN Office of the High Commissioner for Human Rights (former Senior Counsel, New York City.
City of Joliet 2016 Proposed Budget November 30, 2015.
Lyman Welch Water Quality Program Director
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Asset Degradation Modelling at Townsville Water
Creating a SUSTAINABLE Utility
City of Petersburg Water and Wastewater Rates
City of Tucson: Financial Sustainability Plan
City of Sisters, OR 2017 Water & Sewer Rate Study
One Utility’s Path to Climate Change Readiness
Using Energy Conservation, Green Energy, Green Infrastructure and EPA’s CREAT Program, to Reduce Carbon Footprint & Vulnerability to Climate Change Andrew.
Completion Report Summary
FEE INCREASES Public Work Shop June 2, 2018.
Effects of Disasters on Wastewater Treatment and Collection Systems
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

A Reliable and Resilient Water Supply and Wastewater Utility for the 21st Century Angela Licata Deputy Commissioner, Sustainability NYCDEP June 7 th, 2013

2 About DEP: Overview Supply 1.2 billion gallons of water per day to 9.3 million people o 19 storage reservoirs and 3 controlled lakes o 295 miles of aqueduct and tunnels o 7,000 miles of water mains o 109,000 fire hydrants Treat 1.3 billion gallons of wastewater per day o 14 In-city treatment plants; 8 upstate o 96 pump stations $14 billion in active construction and design projects

3 Since 2001 DEP has spent: Drinking Water: $7.7B+ capital investments $4.0B+ operational expenses Wastewater and Sewer: $12.7B+ capital investments $5.1B+ operational expenses Over the past 20 years – CSO capture increased from 30% to 72% annually Sewage is a smaller proportion of overflows, decreasing from 30% by volume in the 1980s to 12% in 2010 DEP Capital Spending Source: New York City Office of the Comptroller, Comprehensive Annual Financial Report, Fiscal Years

4 Mandates and Capital Costs $15.2B (65%) of capital commitments were mandated $2.6B (18%) Capital Improvement Plan is mandated allowing for non-mandated investment in State of Good Repair projects at treatment plants, flooding control, and replacement of water and sewer lines and rate relief? Source: FY2014 Preliminary 10-Year Capital Plan Actual Projected

5 DEP’s Capital Priorities DEP is investing over $10B in Capital Priorities in the next 10 years: o Water for the Future – construction of shafts and tunnels for the Delaware Aqueduct repair $1.7B o Asset management and state of good repair projects $5.1B o Complete sewer connections in Queens $513M and Staten Island $473M o Citywide water main and sewer contracts $831M o Continue green infrastructure related projects $730M o North River cogeneration project $212M o Complete City Water Tunnel No. 3, Stage 2 Manhattan Section connections $208M o Bring Bluebelts to southeast Queens to naturally control stormwater $62M o Protecting wastewater infrastructure and accelerating drainage system build out in partially sewered or unsewered areas $545.3M

6 NYC Rate Increases Water and Sewer ChargesFY 2014 Combined Water & Sewer Rate (per hundred cubic feet) $9.27 Average Annual Single Family Charge (80,000 gal) $991 Average Annual Multi-family Metered Charge (52,000 gal) $644 Multi-family Conservation Program – Residential Unit$944 10% decrease 35% decrease 10% decrease 28% decrease

7 Consumption Declining, Rates Increasing FY13: $3.39/CCF for water, $5.39/CCF for wastewater; $8.78/CCF combined.

8 Continuing the Dialogue on Affordability Affordability Considerations should include: o Income distribution o Poverty rates, unemployment, % of income spent on housing costs and other non-discretionary spending, income and sales tax burden, etc… o Financial Capability Guidance should be revisited through a stakeholder process to fully capture the financial picture of utilities and their ratepayers o Environmental, social, and financial benefits of all water-related obligations to set priorities o Focus limited resources where the community will get the most environmental benefit. Spend wisely to ensure attaining clean and safe drinking water goals

9 Climate Change Planning Climate Change Task Force in Climate Change Assessment and Action Plan Model for the Mayor’s Climate Change Adaptation Task Force and the New York City Panel on Climate Change, formed in 2008 What is working today? Implement adjustments and adaptations to DEP programs and operations. Pre-Sandy study of a representative WWTP, PS, and drainage area Expanded citywide analysis of wastewater infrastructure to be more prepared and protected National leadership: Water Utility Climate Alliance, NY Water Environmental Alliance.

10 Climate Resiliency Study Adaptation can come in many forms: Adjust operations and management Invest in Asset Resiliency Make flexible policies Revise design standards Pursue no-regrets strategies Source: New York City Panel on Climate Change

11 Climate Change in NYC 11

12 Source: New York City Panel on Climate Change NYC Precipitation Trends 12 Inter-annual variability of precipitation has become more pronounced Precipitation seems to be coming in the form of more intense storms

13 Projecting Vulnerabilities Source: MPCC

14 NYC DEP At-Risk Wastewater Facilities

15 WWTP Prioritization Approach Prioritization considered against five metrics: 1.Beaches Impacted 2.Potential Damage Cost of At-Risk Assets 3.Primary At-Risk Assets Associated with Meeting Permits and goals 4.Total At-Risk Assets 5.Capital Plan Opportunities Vulnerability Metrics Operational Metrics Other Metrics

16 Building-Level Vulnerability Assessment  Each facility investigated and analyzed for flood pathways and threshold elevations.  Locations identified as at-risk if associated critical threshold elevations are below the assigned flood elevation (100-yr ABFE inches SLR). Electrical Conduits and Manholes TunnelsGrates Rollup Doors Doorways & Windows Areaways

17 Asset-Level Vulnerability Assessment  Target Assets include All Active: Equipment associated with primary treatment at WWTP and pumping at PS Electrical equipment Pumps and motors  Target asset identified as at-risk if located in at-risk location, situated below the assigned flood elevation (100-yr ABFE + 30-inches SLR), and are not submersible. Electrical assets located underground in the RAS Gallery at 26 th Ward WWTP.

18 Recommended Strategy Allocation for WWTPs

19 PS Prioritization Approach Prioritization considered against seven metrics: 1.Historic frequency of flooding 2.Recurring loss of power 3.Daisy chained or grouped facilities 4.Tributary population 5.Number of critical facilities in service area 6.Beaches? 7.Part of Capital Plan? Operational Metrics Vulnerability Metrics Other Metrics

20 Breakdown of 58 At-Risk PS *NOTE: Gowanus and Ave. V pump stations are at-risk of inundation but have been excluded from further analysis as both are currently under construction. Thus only 56 PS were evaluated.  PS was considered at-risk if the local grade elevation was below the assigned flood elevation (100-year ABFE + 30 inches SLR) PS Type Above Ground Below Ground Total Sanitary Combined14418 Storm112 TOTAL382058*

21 4% Recommended Strategy Allocations for PS And Backup Power Generation

22 Water Quality in New York City Harbor 22 = does not meet water quality standards 75%of Harbor meets pathogen standards for swimming 19% meets standards for boating, fishing 7% of our Harbor is made up of tributaries that do not meet secondary contact standards

23 Wet Weather May Result in CSOs

24 NYC Green Infrastructure 24

25 Right-of-way Bioswale

26 Thank You!