How to Use a Mitigation Bank Cast of Characters Permittee Reviewer (Golf Villas) (THE WMD) Banker Agency (Xanadu) (DEP or WMD)

Slides:



Advertisements
Similar presentations
Recording and Posting Transactions Extend Your Knowledge: 3.2.
Advertisements

Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking Regulatory Branch U.S. Army Corps of Engineers Office of Wetlands, Oceans and Watersheds.
WHAT THE NATIONS BANKERS THINK ABOUT WETLAND MITIGATION BANKS Michael D. Kaplowitz, Michigan State University Frank Lupi, Michigan State University Deborah.
Endangered Species Conservation Banking
Overview of Mitigation Banking Program December 10, 2009 Robert M. Brown, Director Environmental Resource Regulation Department Robert M. Brown, Director.
Emerging Law and Regulations Affecting Mitigation Banking Wayne E
ECOSYSTEM MARKETS What exactly are we talking about in the Yakima River basin!?
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting May 2013.
Financial Reports Controller’s Meeting May 18, 2007.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
KEY CONCEPTS OF MITIGATION BANKING March 27, 2003 US Army Corps of Engineers Jacksonville District.
MITIGATING THE COST OF THIN MARKETS: WETLAND MITIGATION BANKING AND NORTH CAROLINA’S ECOSYSTEM ENHANCEMENT PROGRAM John Cary ENTRIX, Inc. Jonathan Yoder.
April  Side-by-side comparison of definitions: Justin Russell, OSU (HANDOUT)
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
1 Wetland Regulatory Programs Department of Natural Resources Legislative Audit Bureau July 2007.
Colorado’s Stormwater Construction Compliance Assurance Program Dave Akers Colorado Water Quality Control Division CLE – March 22, 2006.
US Army Corps of Engineers BUILDING STRONG ® Lee Anne Devine Chief, South Section Regulatory Branch Louisville District Coal Mining Activities and Section.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Conservation Banking Reference point is critical when you calculate “willingness to pay”. Different ways to solve this puzzle. We were not careful enough.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Processes and Lessons.  Provide compensation for stream or wetland impacts permitted under the Virginia Water Protection Permit Program (VWPP)  Credits.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Wetland Creation Why and How Char Ison and Caleb Asbury.
Privacy and Security Laws for Health Care Organizations Presented by Robert J. Scott Scott & Scott, LLP
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Tools for Business Decision-Making Fourth Canadian Edition Financial Accounting: Prepared by: Peggy Coady Memorial University of Newfoundland & Catherine.
ARE 309Ted Feitshans020-1 Unit 20 Regulation of Wetlands Section 404 of the Clean Water Act, Section 10, Rivers and Harbors Acts of 1890 and 1899.
Chapter 10.1 Bank Reconciliation Heading Write the heading.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Conservation Area Impact Permit Modification and Transfer Request DFD ONE, LLC Environmental Protection Division September 22, 2015.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
- Migrate User customizable Style & Structure Rules Attributes View Filters Once modeled, spec managers can continue to create more rules and filters to.
Measures of Successful Wetland Restoration: An Examination of Policies and Ecologies in Northern Michigan Andrew T. Kozich Michigan Technological University.
Prepared by: C. Douglas Cloud Professor Emeritus of Accounting Pepperdine University © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned,
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
FINANCIAL ACCOUNTING Tools for Business Decision-Making KIMMEL  WEYGANDT  KIESO  TRENHOLM  IRVINE CHAPTER 3: THE ACCOUNTING INFORMATION SYSTEM.
10-Year Compliance Report Issue identified by all user groups: Treated like new permit application Extensive, duplicative documentation required New rules.
Copyright © Texas Education Agency Accounting for Grant Funds, including Documentation for Expenditures.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
5-1 Topic 1 Tangible Non-current Assets IAS 20 Accounting for Government Grants Key Definitions Government grants are assistance in form of cash or assets.
Presentation on: Documentary Credits BY: Fairuz Chowdhury Lecturer, BBS.
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
California WaterFix Aquatic Science Peer Review Sacramento, California April 5, 2016.
C-51 Reservoir ERP/CUP Permitting Status.
ACCOUNTS RECEIVABLE LEDGER AND GENERAL LEDGER CONTROLLING ACCOUNT
Department of Environmental Quality Division of Mitigation Services
VAT in UAE Registration Criteria How to register for VAT
Stormwater Control Transfer Program Overview January 31, 2018
Clauses on MDA purchase orders
Request for a Major Variance from the Neuse Riparian Area Protection Rules    Novo Nordisk Pharmaceuticals, Inc Powhatan Road Clayton, NC July.
State 404 Program Workshop
Endangered Species Conservation Banking
November 9, 2016 Request for an After-the-Fact Major Variance from the Neuse Riparian Area Protection Rule Belinda Keever 8005 Falling Leaf Court, Raleigh,
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Planning Mitigation February 24, 2016
North Georgia Water Resources Partnership Spring Annual Meeting/ Educational Seminar RUSSELL CREEK RESERVOIR April 25, 2018.
Wetland Mitigation.
PURCHASES JOURNAL Lesson 18-1, page 455.
Department of Environmental Quality Division of Mitigation Services
Proposed Mitigation Rule Amendment Rulemaking Pre-Proposal State and Local Government Outreach June 20, 2019.
Presentation transcript:

How to Use a Mitigation Bank Cast of Characters Permittee Reviewer (Golf Villas) (THE WMD) Banker Agency (Xanadu) (DEP or WMD)

application No, no, no, No, no, no, well OK, but MITIGATE Pleeeease Got you covered! Yippee!

Offsets type, function, etc. Provided Reasonable assurance of available credit. Mitigation Service Area is OK. Hummm Well, OK!

PERMIT To offset impacts to 1.2 acres of partially impaired, wet prairie wetlands, the permittee shall purchase 0.9 freshwater herbaceous credits from Xanadu Mitigation Bank. By January 30, 2007 or prior to any construction or impacts authorized by this permit, the permittee shall provide the xWMD with documentation that 0.9 freshwater herbaceous credits have been deducted from the credit ledger of the Xanadu Mitigation Bank.

Request Debit Issue Ledger Mod Permit Compliance