Building Lean Systems Mixed Model Scheduling. 2 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed-Model Scheduling and Small.

Slides:



Advertisements
Similar presentations
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
Advertisements

Lean Manufacturing.
Operations Scheduling
1 Alain Prioul Flexibility / Adaptability. 2 Definitions Flexibility Ability to follow customer demand at different Takt Time Ability to quickly change.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Inventory Kanbans Automating the Replenishment Cycle
Building Lean Systems Takt Time
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Chapter 6 Batching & Flow Interruptions Setup Times & EOQ
Organization of Workstations
1 Leveling: Tortoise not Hare. 2 Ohno, 1988 The slower but consistent tortoise causes less waste and is much more desirable than the speedy hare that.
CSUN - Prof. David Shternberg
Beni Asllani University of Tennessee at Chattanooga
MSE507 Lean Manufacturing
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Summary: Review of Lean Principles
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Value Stream Mapping.
The Lean Enterprise VSM Symbols VSM Symbols Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Process Improvement Strategies Takt Time Future State Value Stream Map
Welcome to the Lego Widget Flow Factory!
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
SchedulingProducingControllingSchedulingProducingControlling.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
Based on the book: Managing Business Process Flows.
Perencanaan Produksi Harian Case #2 One Piece Flow Kuliah 4 LSiPro – FT Untirta Muhammad Adha Ilhami.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
1 Session 19 Just-In-Time Manufacturing JIT Impact on the MPC System JIT Continuous Improvement –JIT Building Blocks –Elements of JIT Kanban Systems –Single.
1 Lean Manufacturing Overview 2 Definition Definition Waste identification and reduction Waste identification and reduction Cellular Manufacturing Cellular.
Chapter 13 Lean Systems This presentation covers the material in Chapter 13 - Lean Systems.
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
Just-in-Time and Lean Systems
Managing Processes and Capabilities CHAPTER THREE.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
© 2007 Pearson Education 7- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 7 Internal & External Process Simplification 09/25.
Flow Rate and Capacity Analysis
Process Layout Chapter 7 July 20, 2005.
MAPPING YOUR VALUE STREAM
© The Delos Partnership 2006 page 1 Supply Chain Techniques Choices to be made when deciding how to plan.
SchedulingProducingControllingSchedulingProducingControlling.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Chapter 9 Inventory Kanbans Automating the Replenishment Cycle.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Manufacturing Line Demonstration This short PowerPoint presentation is designed to give the reader an example of how a Lean/Pull system operates.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Review of Lean Topics Dewey Warden.
Inventory Management for Independent Demand Chapter 12.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
Production and Operations Management: Manufacturing and Services
Manufacturing/Office Cells
1 Mix Model for Executives FMS 200 Series FBP-FMS288A.
Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
Value Stream Mapping Plus Learning to See Better Know the Laws. Use the Tools. Profit. © Factory Physics, Inc.
Supply Chain Customer Order Decoupling Point
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Analytical Tools for Process Analysis and Improvement
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 12 Lean Production. Chapter 12 Lean Production.
Manufacturing Production Planning
Presentation transcript:

Building Lean Systems Mixed Model Scheduling

2 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed-Model Scheduling and Small Batch Production  In a perfect world, when the customer pulls a product from the final station, a signal is generated on each upstream resource to produce exactly what is pulled.  In the real world, changeover time, material availability, or operator availability motivates large batch production.  Large-lot production exacerbates Bowlwhip effect.  WIP between stations goes up, flow time goes up

3 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed-Model Scheduling and Small Batch Production  Produce every product as quickly as possible, at the same rate at which customer demands are made.  In a lean system, products flow smoothly through the enterprise with no delays  Mixed-model scheduling (heijunka) Evenly distributing the production of different products over a period of time Changeover or setup times must be small Small batching in the presence of setup times

4 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling  Demand per hour A(3), B(2), and C(1).  10 min/part assembly time. 10 hrs/day, 5d/w.  Batch size is one week of demand; A(150), B(100), C(50).  Instead of receiving products every hour, the customer will receive them once a week. The average inventory is 75 As, 50 Bs, and 25 Cs.  If production per hour was A(3), B(2), C(1), the finished goods inventory would be negligible because production would exactly match hourly demand. MMS Example

5 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling  AAABBC is a good hourly schedule, it could be more finely sequenced as follows: ABACAB.  Production in large batches uneven workload uneven demand for upstream processes, pull impossible production is not synchronized with demand.  Mixed-model production: smooth work-load, smooth demand for upstream processes Allows production to match customer demand. MMS Example

6 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed Model Sequence for Volpens Smallest possible sequence length = 1/0.09 = Choose a 11 unit sequence; adjust every two cycles. Note: A mixed model sequence is used to intentionally vary work content and component requirements.

7 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed Model Sequence For Volpens Seq. #Model Desc. 1Blue Pen 2Red Pen 3Blue Pen 4 5 Yellow Pen 6 7 Yellow Shell 8 Red Pen 9 10 Yellow Pen 11 Blue Shell Seq. #Model Desc Red Shell Blue Pen Red Pen Blue Pen Red Pen Red Shell Blue Pen Red Pen Yellow Pen Blue Shell Yellow Shell Blue Pen Red Pen Blue Pen Yellow Pen Red Shell Red Pen Blue Shell Blue Pen Yellow Shell Blue Pen Red Shell Blue Pen Yellow Pen

8 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Process 1 60 units Process 2 60 units Process 3 60 units Process 4 60 units One Piece Flow  Reduce lead time by reducing WIP  Move products between workstations  Average lead time = WIP/Throughput  What is the average lead time for the system above, if throughput is 100/week?  2.4 weeks

9 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling One Piece Flow What is the average lead time for this system? Process 1 1 unit Process 2 1 unit Process 3 1 unit Process 4 1 unit  One piece could mean a pallet, a box etc.  Is not practical in every situation  One-piece flow may require relocation of the people/equipment.  A process layout (grouping operations by function) must be replaced by a product layout (arranging operations in the order of flow.)

10 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Batch Process For Volpens, Ltd. Production Scheduler Raw Materials Finished Goods Inspect Test, Pack & Ship WIP Cap Assy Pen Assy Peel& Stick Label Press Material Flow Information Flow

11 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Takt Time for Volpens, Ltd. Monthly Demand = No. of days per month = 16 Daily Demand = Avail. Time/Day = Takt Time = 68

12 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Manpower requirements for Volpens Ltd.  Pessimistic times for the current activities Cap Assembly:25 seconds Pen Assembly:17 seconds for pens, 5 seconds for shells Label Making:28 seconds Peel & Stick:16 seconds Test,Pack,Ship:15 seconds

13 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling  Note that activities 3, 4, 5 are not performed for shells. Also, activity 2 is minimal for shells. The only activity done, for all items, is cap assembly.  The time for activity 3 includes an allowance for changing coils; excluding this allowance, a pessimistic time will be 23 seconds. Use this number for your calculations. Manpower requirements for Volpens Ltd.

14 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Minimum Manpower Required for Volpens, Ltd. Monthly Demand for Pens = 48 Monthly Demand for Shells = 20 Total Monthly Demand = 68 Percentage Demand for Pens = Percentage Demand for Shells =

15 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling ActivityPens ( %) Shells ( %) Ave.Time/Unit Cap Assembly Pen Assembly Label Making Peel & Stick Test,Pack,Ship _____________ Total Labor Content per Unit: Takt Time per Unit: Minimum Manpower Required = Minimum Manpower Required for Volpens, Ltd.

16 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed Model Sequence for Volpens Smallest possible sequence length = 1/0.09 = Choose a 11 unit sequence; adjust every two cycles. Note: A mixed model sequence is used to intentionally vary work content and component requirements.

17 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed Model Sequence For Volpens Seq. #Model Desc. 1Blue Pen 2Red Pen 3Blue Pen 4 5 Yellow Pen 6 7 Yellow Shell 8 Red Pen 9 10 Yellow Pen 11 Blue Shell Seq. #Model Desc Red Shell Blue Pen Red Pen Blue Pen Red Pen Red Shell Blue Pen Red Pen Yellow Pen Blue Shell Yellow Shell Blue Pen Red Pen Blue Pen Yellow Pen Red Shell Red Pen Blue Shell Blue Pen Yellow Shell Blue Pen Red Shell Blue Pen Yellow Pen

18 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Mixed Model Assembly Schedule for Volpens Family: Pens Week 3 Week 4 Week 5 Week 6 Blue Pen & Case PCB Red Pen & Case PCR YellowPen&Case PCY Totals

19 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Units Workload on Operators Mixed Model Scheduling: Lean Loading For Caps

20 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Units Mixed Model Scheduling: Purchase Orders For Caps

21 Ardavan Asef-Vaziri 6/4/2009Lean Thinking: 4- Mixed Model Scheduling Part 8:00 8:15 8:30 8:45 9:00 9:15 9:30 9:45 10:00 Implementing Mixed-Model Scheduling: The Load-Leveling (Heijunka) Box