FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1,

Slides:



Advertisements
Similar presentations
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Advertisements

U.S. Plans for ADS-B Briefing for
GLOBALink/VHF Digital Link Mode 2
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
A GLOBALink ARINC VDL Mode 2 AOA and ATN Program Status & Deployment Activities November, 2000 AMCPWGM1 WP23.
Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 ATM DATA LINK APPLICATIONS M J A Asbury ATSDL_001_4 01 Presentation ATN 2.3.
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.
ATN/VDL Mode 2 Implementation Status
1 CAR/SAM ATN/GNSS Seminar ICAO Regional Project for Latin America RLA/00/009 CAR/SAM Test Bed (CSTB) Overview Carey Fagan Federal Aviation Administration.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS Presentation GNSS 1.1 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
CPDLC Build 1A and CPDLC Benefits Timothy R. Hancock CPDLC Operations Lead FAA Free Flight Program Office ATN 2002 London, England September 24, 2002.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
How the PETAL Trial Relates to the FAA’s CPLDC Program ATN 2001 Focus on the Reality of Data Link IEE London, England 18 September 2001 Gregg Anderson.
ATN Subnetwork Implementation:
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
Federal Aviation Administration – Oceanic & Offshore Program 1 Nancy Graham International Technical Representative - Europe, Africa and Middle East ATN2002.
1 Strategy and Resources Committee - Performance Management Reporting: Quarter 4 Guide to reporting Key Service Priorities 2006/07 Key Service Priorities.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT En Route Services Survey Results A Review 5/8/2013.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
Avinor update CPWG/16 Ottawa 4-6 December 2013 Bodo ACC Bodo Oceanic FIR.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Eurocontrol ACAS Programme ACTOR/wp3/SLID/D 03/08/01 - v1.0 Slide 1 ACAS II operations in the European RVSM environment ACAS II mandate in Europe (1/2)
© Lawrie Kirk 2015 Strategic Communication Planning – Day 2 Lawrie Kirk Sessional Academic Australian National Centre for the Public Awareness of Science.
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
BENCH-CAN Internal evaluation 2nd semester
Performance Based Communication and Surveillance (PBCS)
FAA Ground to Ground ATN Implementation Plan
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
CAR/SAM ATN/GNSS Seminar
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Workshop on preparations for ANConf/12 − ASBU methodology
ATN London - 23 September 2003 Alex Wandels
ATN/VDL Mode 2 Implementation Status
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Data Communications Program
Chair of Chemistry Graduate School
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Workshop on preparations for ANConf/12 − ASBU methodology
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
ATN Subnetwork Implementation:
Presentation transcript:

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN 3.3

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 The objective of this brief presentation is to describe the outline of the FAA Controller Pilot Data Link Programme, the changes brought about by the September 11th 2001 disaster, and the current status of the programme Presentation Objectives

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 FAA CPDLC Programme - An Overview (1) FAA initially planned a three-stage approach to the introduction of ATN-based Controller Pilot Data link Communications into US domestic and oceanic airspace - CPDLC Build 1 - Extremely limited message set - 4 routine, workload significant messages at one ARTCC; CPDLC Build 1A - An additional 5 messages introducing tactical control, implemented at 23 ARTCCs; and CPDLC Build 2 - A realistic implementation of an operational message set, with the option to add usage of additional messages from the CPDLC message set as demand increased

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Pre September CPDLC Build 1 Plan Prior to September 2001, the CPDLC Build 1 program read like this……. On track for implementation of system into Miami ARTCC in June 2002, complying with ICAO SARPS Version 1 4 Services to be implemented  Transfer of Communications  Initial Contact  Altimeter setting  Pre-defined Message Text American Airlines the launch airline

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 …...and the CPDLC Build 1A program read like this - 5 additional services to be implemented  Assigned Speed  Heading  Assigned Altitude  Route Clearance, and,  Pilot downlink Implementation of system into the first of 23 En-route Centres (planned for June 2003) was in the midst of a re- scheduling/re-budgeting exercise which would have led to slippage to December 2003, with completion in Pre September CPDLC Build 1A Plan

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 The CPDLC Build 2 program development plan had been defined, with initial implementation targeted at 2008, although there was no FAA baseline program established. Pre September CPDLC Build 2 Plan

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 The events of September 2001 significantly altered data link implementation plans in the United States SEPTEMBER 2001

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 All FAA programs underwent urgent stringent review. SEPTEMBER-NOVEMBER 2001

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Post September Revised CPDLC Build 1Plan... The revised CPDLC Build 1 program now reads like this……. On track for introduction of system into Miami ARTCC in June 2002, but now complying with ICAO SARPS Version 2. 4 Services to be implemented  Transfer of Communications  Initial Contact  Altimeter setting  Pre-defined Message Text American Airlines the launch airline

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Revised CPDLC Build 1 Plan …Continued Operational trials with American Airlines will continue Controller training at Miami will take place Evaluation of progress and decision in September 2002 as to whether or not to place the system into Initial Daily Use (IDU)

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 The revised CPDLC Build 1A program is now much longer term……. Introduction of system into in the first of the 23 En-route Centres not now until December Late 2007/early 2008 before nation-wide rollout. (Biggest issue is training - up to 9 months at large facility like Atlanta.) …….. Post September Revised CPDLC Build 1Plan...

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 Revised CPDLC Build 1 Plan …Continued Same 5 additional services to be implemented  Assigned Speed  Heading  Assigned Altitude  Route Clearance, and,  Pilot downlink ICAO SARPS Version 2 compliant Compatible with but improvement on Eurocontrol Extended PETAL trials

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 The CPDLC Build 2 program development plan is currently sitting on the back burner, pending successful initial implementation of Build 1A plans. No FAA funding is currently approved for this program. Post September Revised CPDLC Build 2 Plan

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 CPDLC Build 1 Status... Build 1 continuing progress for operational evaluation in Miami ARTCC Technical and operational evaluation will continue during the summer of 2002 Controller and pilot training taking place American Airlines is preparing to add equipped aircraft to their fleet as launch airline ……..

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 CPDLC Build 1 Status …Continued Decision point in September 2002 will indicate whether to proceed to Initial Daily Use (IDU) for Build 1 Expectation is that criteria will be met to continue operations of Build 1 beyond September 2002 System will remain in Miami until replaced by CPDLC Build 1A

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 CPDLC Build II Status All FAA effort on the Build II program has stopped FAA priority is to get Build 1A back on track before consideration of follow-on program Build 2 could develop as add-ons to Build 1A

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 CPDLC - The Future FAA (and its partners) committed to ATN-based CPDLC development and implementation. Additional ‘High Benefit’ messages are being assesed as possible augmentation to Build 1A post completion of the 23-Centre implementation Technical refreshment to bring the system up to SARPs Version 3 standard, including Security.

FAA Presentation to CAR/SAM ATN/GNSS Seminar, Varadero, Cuba, May 2002 FAA Controller Pilot Data Link Program Status THANK YOU FOR VIEWING THIS PRESENTATION