Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009.

Slides:



Advertisements
Similar presentations
Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Advertisements

Linear Collider Positron Source and Central Integration Update N. Walker, J. Clarke, E. Paterson, V Kuchler, J. A. Osbourne, T. Lackowski, A. Wolski, S.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford,Alexander Mikhailichenko, John A. Osbourne,
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson ADI Meeting July 2, ADI Meeting Ewan Paterson 7/2/15.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC J.Osborne / A.Kosmicki / B.List – March 22 th 2012 CFS update for Europe.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Pictorial Damping Ring DC03 Layout (A. Wolski, M. Korostelev)
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford, Alexander Mikhailichenko, John A. Osbourne,
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Specifications for Central Region Layout
CLIC Civil Engineering Update
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
AD & I : BDS Lattice Design Changes
Cost Comparison of Undulator and e-Driven Systems
ILC BDS Emittance Diagnostics: Design and Requirements
Electron Source Configuration
Linear Collider Positron Source Update
Linear Collider Positron Source and Central Integration Update
Central Region Working Group
ILC - Global Design Effort
Electron Collider Ring Magnets Preliminary Summary
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

Linear Collider AD&I Update N. Walker, E. Paterson, V Kuchler, T. Lackowski, J. A. Osbourne,J. Clarke, A. Wolski, S. Guiducci, N. Solyak,… Norbert Collomb30/08/2009

N.Collomb2 Linear Collider – AD&I During the last WebEx meetings an apparent discrepancy has been noted. The location of the Damping Ring has been shown in two different locations. Location 1: (work done by U.K. Sources and Damping Ring) places the Damping Rings ’inside’ the ‘V’ shape of the Positron and Electron beam. Location 2: (work done by CERN/FNAL) places the Damping Rings ‘outside’ the ‘V’ shape of the Positron and Electron beam. We are at a stage where a decision needs to made in order to feed this info back to N. Solyak to commence work on the RTML.

30/08/2009N.Collomb3 Linear Collider – Positron Source ‘U.K.’ AD&I machine layout (I.P. at X:0, Y:0) Electron Main DumpPositron Main Dump

30/08/2009N.Collomb4 Linear Collider – AD&I ‘CERN/FNAL’ AD&I machine layout (I.P. at X:0, Y:0) Electron Main DumpPositron Main Dump

30/08/2009N.Collomb5 Linear Collider – AD&I Both have advantages and disadvantages concerning the physics and physical aspects. U.K. model Advantages: - Short tunnels, - Share shafts (D.R. + Target Hall, Interaction Point), - Inside ‘V’ shape to avoid any possible radiation from Main Dumps, - Simpler Physics and room for RTML components. Disadvantages: - Service tunnel around Target Hall interference, - To avoid interference, D.R. offset needs to increase to approx. 65m instead the current 50m, - ‘S’ shape of beam more distinct (larger angles)?

30/08/2009N.Collomb6 Linear Collider – AD&I CERN/FNAL model Advantages: - Shallow ‘S’ shape beam can be achieved, - Target Hall design can remain as is, - Offset can remain at 50m, - Service Tunnel does not have to come ‘up and over’. Disadvantages: - Longer Tunnels and more of them, - More shafts required, - Complexity increases for beam line, - Radiation risk from Main Beam Dumps(crossover?), - Eliminates option to combine BDS Dumps?

30/08/2009N.Collomb7 Linear Collider – AD&I Can we make a decision soon as to the side of the Damping Ring. Since we are assembled here, we can investigate the physical aspects. The work done by Tom (see next slide) is of great help in determining the Physical constraints. N. Solyak can aid in the decision for Physics reasons. Also noted was the inversion of the ‘V’ on drawings (T. Lackowski). Although not detrimental at this stage, HOWEVER bad habits tend to stick and lead to confusion later on. Please inform and update Tom about this.

30/08/2009N.Collomb8 Linear Collider – AD&I Tom’s Layout Incorrect Information. Discuss lengths, position of systems and quantity. Update required. Discuss spatial requirements on info available.

30/08/2009N.Collomb9 Linear Collider – AD&I I love this sketch! It helps immensely when explaining the basics of the ILC. Thank you Tom.

J.Osborne CERN 1000m? Next Slide

30/08/2009N.Collomb11 Linear Collider – AD&I 2 D Layout for Option1 Positron Source region. Positron Source length currently at approx. 920m. Booster length fixed. Position relative to Positron Source can vary in steps of 16.8m either direction. BDS Chicane, Collimation and Fast Abort Extraction (350m). Converting this 2 D data into 3 D has taken place as depicted in the following slides.

30/08/2009N.Collomb12 Linear Collider – AD&I 3 D Overall Layout for Option1 Positron Source region. Spin Rotation added in the last few days. Some guesswork to be confirmed via lattice design Booster Option 1: BDS Chicane + Collimation + Fast Abort AUX Source added recently. Some guesswork to be confirmed via lattice design. Area of optimisation!

30/08/2009N.Collomb13 Linear Collider – AD&I 3 D Layout Positron Source BDS Fast Abort region. Kicker Magnets Quadrupole, Sextupole and Dipole Magnets BDS Chicane + Collimators 11 MW?? Dump RTML Undulator Section (20 off 1 off Quad + 3 SC Undulators = 302m) Pre – Undulator Quads (48m) I.P. Direction

30/08/2009N.Collomb14 Linear Collider – AD&I 3 D Layout Positron Source BDS Fast Abort region. Is an Alcove like this feasible? (9.5° off axis) Sufficient clearance between Fast Abort Magnets and Undulator Modules Interleaved Fast Abort and Undulator Magnets RTML I.P. Direction

30/08/2009N.Collomb15 Linear Collider – AD&I 3 D Layout Positron Source ‘BDS Dogleg’ region. AUX Source BDS ‘Dogleg’ 1.5m ML-Axis offset RTML 40m Drift to clear Remote Handling and Dump shielding I.P. Direction

30/08/2009 N.Collomb16 Linear Collider – AD&I 3 D Layout Positron Source ‘AUX Source’ region. Thermionic Gun, Bunchers, Diagnostics, 2 off Standing Wave Accelerators (12 MeV/m), Diagnostic Section and Tune-Up Dumps. Tune-Up Dump and Diagnostics Section 2 off Cryomodules at 12.6m with Quad, in Line with Photon Beam, approx. 30MeV/m Photon Beam Pipe BDS ‘Dogleg’ RTML Remote Handling I.P. Direction

30/08/2009N.Collomb17 Linear Collider – AD&I 3 D Layout Positron Source ‘Target Area’. Capture Chicane Pre-Acceleration moved downstream. On ML-Axis. Remote Handling (R. H.) (Vertical Extraction) I.P. Direction RTML clears R.H. ‘Box’ R.H. Extraction Shaft? BDS ‘Dogleg’

30/08/2009N.Collomb18 Linear Collider – AD&I 3 D Layout Positron Source ‘Spin Rotation’ region. Spin Rotation Positron Transfer start Pre – Accelerator (to 400 MeV).

30/08/2009 N.Collomb19 Linear Collider – AD&I 3 D Layout for Positron Source ‘Booster region’. Booster Endbox 1 st of 2 Booster periods (141.6m). 11 off Cryomodules at 12.6m length + 1 off Endbox (2.5m). PTRAN end

30/08/2009N.Collomb20 Linear Collider – AD&I The Positron Source overall layout can be considered complete (Booster Position and remaining Positron Transfer will require update). The purpose of this meeting is to update all relevant Workgroups and discuss feasibility of proposal. CAD models can be distributed now or after update. Based on the above discussions, new or modified layout needs to be created. Note, certain system lengths (Cryomodules) and positions ought to be near a sufficiently large access shaft. Remote Handling change over process and space requirement investigation/development is high on priority list. Individual systems need to be developed further (are we at a stage where we can go into more detail?) Summary

AD&I e+ layout Option2 Proposed Fast Abort Layout (Feasibility Investigation in progress) Need to check Remote Handling Area for clearance. Can RTML magnets and abort beam line magnets coexist in close proximity? Preliminary Beam Studies (Deepa and James) indicate that this solution may increase length of machine by approx. 300m. This solution could further increase cost in terms of equipment required (virtually duplicating part of the BDS). Maintenance cost will increase the running cost of the ILC. Starting to look expensive. 250 GeV Beam from Main Linac to be taken to ceiling (diagonally up and towards I.P). Lattice design is complex and Beam acceptance is governing this. Installation and maintenance could be difficult!! Plenty of room for access (cautious maybe) 0.8m Approx. 2m Approx. 1.8m Last not least for the observant, there is an Option2 currently under investigation. This where the Fast Abort is taken downstream to the original location (approximately) to combine it with the Diagnostics Dump. 30/08/

03/09/2009 N.Collomb 22 Linear Collider – AD&I Discussion details (refer to slide number): The Damping Rings are on the opposite side as the Main Beam Dumps (slide 3). The orientation of the Main Linac has been clarified by Nick Walker (misconception to RDR Fig ). The I.P. is the Datum. The ‘Z – Axis’ points to the ‘right’ and the ‘X – Axis’ to the top in the Plan View (as was). See sketch 1 below. The Lattice files do NOT have a rotation. The person converting the data into Excel format for engineering purposes must adopt the convention as follows: The Main Linac angle has been defined with a –ve 7 mrad to the horizontal Z-Axis giving a crossing angle of 14 mrad. Discussion Summary I.P. +ve Z-Axis +ve X-Axis +ve Y-Axis Coming out of Page Sketch 1 E- Main Linac E+ Main Linac Z-Axis X-Axis I.P. 14 mrad -ve 7 mrad Main Dumps

03/09/2009 N.Collomb23 Linear Collider – AD&I Discussion Summary E+ Main Linac E- Main Linac Z-Axis X-Axis I.P. 14 mrad +ve 7 mrad E+ Wiggler E- Wiggler E+ RF Modules E- RF Modules RF Cavern Target Hall E+ Injection E+ Extraction 50m??? Target Hall Annex?? NOT TO SCALE Option 1 adopted