1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.

Slides:



Advertisements
Similar presentations
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Advertisements

National Accessible Reading Assessment Projects Principles and Guidelines NARAP Goal 3.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
GPA Renewable Energy Resource for Guam Power Authority
R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
California Energy Commission AB 1257 Report on the Role of Natural Gas in California Staff Workshop on California’s Natural Gas Infrastructure, Storage,
1 R Reliability Reporting (PU Code §2774.1) Workshop II, Day 1 California Public Utilities Commission May 26, 2015, 10:00 a.m. – 4:00 p.m. David.
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
Public Teleconference 6/29/2015 Agenda, Schedule, and Question for Stakeholders RPS Calculator 50% RPS Energy Only Special Study.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
1 Cal TF’s Support of California’s Broader Energy Policy Objectives ANNETTE BEITEL ALEJANDRA MEJIA JUNE, 2014.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
PacifiCorp Informational Update Presented to the Utah Geothermal Power Generation Workshop by Ernie Wessman PacifiCorp VP, Resource Development & Construction.
Transmission Planning at the California ISO September 10, 2015.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
CPUC Public Agenda 3342 Thursday, September 11, 2014, 9:30 a.m. San Francisco, CA Commissioners: Michael R. Peevey Michel Peter Florio Catherine J.K. Sandoval.
EVALUATION AND APPRAISAL REPORT OVERVIEW, WORKPLAN & PUBLIC PARTICIPATION PLAN FOR ALACHUA COUNTY Energy Conservation Strategies Commission February 18,
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
CPUC Public Agenda 3320 Thursday, August 29, 2013, 1:00 p.m. San Francisco, CA Commissioners: Michael R. Peevey Michel Peter Florio Catherine J.K. Sandoval.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
School Improvement Activities Accreditation (AdvancED) Process Office of Service Quality Veda Hudge, Director Donna Boruch, Coordinator, School Improvement.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
PALMDALE ENERGY PROJECT AMENDMENT (08-AFC-09C) Data Response Workshop Participation Information, Purpose, and Agenda Topics December 17, :30 a.m.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
MTS Working Group October 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work of.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Workshop: IOU Energy Storage Track 1, R July 28, 2015 Procurement Best Practices – Lessons Learned Consistent Evaluation Protocol – Identify.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 2, 2016 STATION POWER Gabriel Petlin/ Manisha Lakhanpal Grid Planning and Reliability,
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
1 Distribution Resources Plan [R ] Data Workshop California Public Utilities Commission May 23, 2016 Rulemaking R Pursuant to Public.
STAKEHOLDER ENGAGEMENT PROCESS FOR ENERGY EFFICIENCY BUSINESS PLAN DEVELOPMENT March, 2016.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 3, 2016 Multiple-Use Application of Energy Storage Systems Gabriel Petlin/ Manisha.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.
LNBA Subgroup: Avoided Transmission Value
Locational Net Benefit Analysis Working Group
Adult College and Career Education Leadership
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Next Generation Distribution System Platform (DSPx)
Status of the Planning Working Group’s (PWG) Efforts
August LNBA Agenda Time Topic 1:00 – 1:15
Kim Miller Oregon Department of Education
Introduction to Growth Scenario Working Group
Integrated Capacity Analysis Working Group
DER Growth Scenarios and Load Forecasts Working Group
Presentation transcript:

1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop

2 INTRODUCTION

Introduction Housekeeping Workshop purpose and agenda History of RPS Calculator (versions 1 – 5) Current use of RPS Calculator in CPUC/CAISO Processes

Safety and Emergency Information In the event of an emergency, please calmly proceed out the exits. We have four exits: Two in the rear and one on either side of the speakers. In the event that we do need to evacuate the building: – Our assembly point is Jefferson Square Park on Turk and Gough Streets. – For the Rear Exits - Head out through the courtyard, and down the front steps. Continue west on McAllister Street. Turn north onto Franklin Street. Turn west onto Turk Street and proceed to Gough Street. – For the Side Exits - Go out of the exits and you will be on Golden Gate Avenue. Proceed west to Franklin Street. Turn north onto Franklin Street. Turn west onto Turk Street and proceed to Gough Street.

Emergency Exit Routes

Other Information WiFi Access login: guest password: password RPS Website All presentations are available on the RPS website Restrooms Out the Auditorium doors and down the far end of the hallway.

Call-In Information Phone Conference Number: (866) Participant Code: # WebEx Day One Meeting Number: Meeting Password: !Energy1 WebEx Day Two 81db 81db Meeting Number: Meeting Password: !Energy1

Purpose of Workshop A.Discuss stakeholder comments on RPS Calculator v6.0* B.Identify functionality needed in v6.1 for Long Term Procurement Proceeding (LTPP) /2017 California Independent System Operator Transmission Planning Process (CAISO TPP) C.Discuss and identify areas for further coordination across PUC proceedings and with sister agencies D.Discuss role of RPS Calculator in facilitating the achievement of State RPS goals *Additional responses to stakeholder comments available in Technical Notes document on RPS web page

Workshop Plan PurposeAgenda Item A. Discuss stakeholder comments on RPS Calculator v6.0 II. RPS Calculator v6.0 Functionality DAY ONE B. Identify functionality needed in v6.1 III. Implications of Energy- Only Procurement DAY TWO C. Identify areas for further coordination IV. Intra-CPUC Alignment D. Discuss role of RPS Calculator V. >33% Statewide Transmission Planning

Agenda Overview DAY ONE Calculator Overview Resource Costs and Potential LUNCH (12-1) Resource Costs and Potential (cont’d) BREAK (3:15) Resource Valuation DAY TWO Resource Valuation (cont’d) Energy-Only Procurement and Transmission Planning BREAK (10:45) CAISO Energy-Only Planning LUNCH (12-1) Process Alignment BREAK (3:15) Role of RPS Calculator in Statewide 33% RPS Transmission Planning

RPS Calculator Past and Present 2009: RPS Calculator created by CPUC RPS staff – Informed 33% RPS Implementation Assessment 2010: RPS Calculator integrated into LTPP proceeding – Output used to inform LTPP system and CAISO transmission planning efforts 2014 (Jan): RPS Calculator added to RPS Proceeding – Calculator design & administration is now part of RPS proceeding. RPS now supports LTPP’s planning efforts (Oct): RPS Calculator v6.0 staff proposal issued 2015 (Feb): RPS Calculator v6.0 Workshop

How RPS Portfolios are Used in Long- Term Planning Studies RPS Vets and adopts RPS Calculator methodologies, inputs and assumptions annually and develops RPS portfolios RPS submits portfolios to LTPP for generation planning LTPP Vets and adopts combinations of assumptions (including RPS portfolios) to construct multiple scenarios for use in long term planning analysis Output LTPP scenario analysis informs CPUC procurement authorizations LTPP scenarios (with associated RPS portfolios) are provided to CAISO for use in TPP. TPP may approve new transmission infrastructure if needed to serve scenario/case.

RPS Calculator Next Steps 2015 Q3: Issue draft v6.1 with draft portfolios for comment 2015 Q4: Finalize and adopt v6.1 and associated portfolios via ruling (tentative, pending workshop comments) Additional rulings will be issued later this year seeking comments on outstanding Calculator-related issues (e.g., environmental scoring) and scheduling additional workshops as needed.