CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR.

Slides:



Advertisements
Similar presentations
ARGWELD® Product Presentation
Advertisements

3 Title Blocks and Part Lists Permission granted to reproduce for educational use only. Describe drawing sheet sizes and formats Identify marginal information.
In this configuration the nose strut tube needs to be cut off. The old nose fork and block/steering collar are removed. The new block must be installed.
Product Design. Graduates  The graduate with a Science degree asks, "Why does it work?"  The graduate with an Engineering degree asks, "How does it.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
Best Group of Companies Credentials Presentation
 Formally Known As- Nagpure Engineering Co.  Established  Founder - Mr. Suryakant T. Nagpure.  Specialist in  Press Components  Sheet Metal.
JNJ MACHINES PVT. LTD. “ KEY MACHINING JOBS EXECUTED SO FAR”
JPCI CONTROLS Ultimheat
Automotive Bearings and Sealants
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Building A Model Rocket
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
Steps towards low-risk pipeline inspection Alberto Di Lullo Flow Assurance Engineering Technologies Manager.
JC Equipments Pvt. Ltd Heat Exchanger Manufacturers Off Ph : , Tele Fax :
Floating Head Heat Exchanger
Customer Presentation West River Rd. South Elyria, OH 44035—Phone: Fax:
JC Equipments Pvt. Ltd Heat Exchanger Manufacturers
LHQ Curing Mold Miao Yu Fermilab 07/26/2011. HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set.
“Fix Tube Sheet” Heat Exchanger
9/2003 Welded Plate Heat Exchangers “Where gaskets won’t work”
Scania Siam Co., Ltd. Parts Department SERVICE EXCHANGE &CORE Prepared by Sirikorn S.Date: 30 May 2006.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Client : HINDUSTAN PETROLEUM - HALDIA
International Certification Services Pvt Ltd.
TUNE UP SKILL T-1 AIR FILTER Removal, Installation and Evaluation.
FORTUNE PLASTECH A BRIEF OVERVIEW February
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d ASSEMBLY MODELING & BILL OF MATERILS We have spent around 5000hrs of work in Valve.
DESIGN & MANUFACTURING OF PLATE STARTER CLUTCH HUB FOR TWO WHEELER -A REAL TIME PROJECT By S.Ganapathi subramanian ( ) T.Karunanithi ( )
Week 13 Deliverables Team Highlander. Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward.
Bell Work Engineering New Products Read pages of Chapter 19 in the Manufacturing book.
CON 4003 Construction Estimating Prof R. V. Locurcio.
TimeLine Phase 1: Planning Time: 1 year Phase 2: Construction Time: 6 months Phase 3: Installation Time: 1 month Phase 4: Student Involvement.
appseal ® XTR Decorative acrylic waterproof coating neha speciality chemicals pvt. ltd. 1.
HEAT EXCHANGER SUBMITTED TO: Er. Akash Rana(HOD) Department of Petroleum SUBMITTED BY: Inzamam Ul Haque Mirza Abdul Raheman Mohd. Shahzar Chisti Tahir.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
Get Online Coaching Classes – Courses To Look For Online class Face.
Websites became essential for all sorts of businesses instead of all differences through their industry and customer base. In this segment, along with.
SPUDWEB TECHNOLOGIES PVT LTD WELD VOLUME AND COST CALCULATOR.
@ PRINTER REPAIR SERVICES IN HYDERABAD inutsystems.com.
21 Curtis Court Building 1 Cartersville, GA Phone: Web Site:
Marine Kit - 1 Shipyard Operations
ASSEMBLY MODELING & BILL OF MATERILS
AURA LASERFAB PVT. LTD. An ISO 9001:2008 Certified Company
2016 Maintenance Innovation Challenge
GRG Polydynamics Pvt. Ltd.
WELCOME.
CLEAN UP & INSPECTION.
Pranali Industrial services
PANDA Yoke of the Magnet
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
관상동맥(Coronary artery )
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.

1. EVYOM TECHNOLOGIES LLC 2. EVYOM TECHNOLOGIES PVT LTD 99 Wall St #217 E 59-60, 1st Floor, Sector 3, Noida New York, NY 10005, USA U.P ,
Osiz-Leading Mobile App Development Company in India
Summary Report Matrix Summary TF030 Rev. A Sales General Quality
Using Analytics to Improve Customer Experience with Documentation
Certified With ISO 9001:2015 & IATF 16949:2016
ISB6.7 Euro 6 EGR Crossover Tube Insulation Removal
Floating Head Heat Exchanger
April 16, 2008 Today begin Step 4 – Create Model/Prototype
Fastwell Fittings Industries Fastwell Engineering Pvt Ltd is a leading Manufacturer & Supplier of all Ferrous & Non-Ferrous Metals. As a pioneer and leader.
Production process- your product processing cards, technology
IHAAB Component Systems AB
CRU Intellectual Property 2019 Commodity Test Document ©2019 CRU International Ltd. All rights reserved.
SIPOC Diagram --- Planning of Product Realization Process
This is my sheet And this is my sheet.
IYALIA Engineering Solutions India Pvt Ltd. Engineering Solutions For all Industrial Business Industrial Automation.
Presentation transcript:

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR

PROJECT :RETUBING OF HELITOWER PO. NO : WO. NO : 1188 WEIGHT (EMPTY) : 120 Ton CUSTOMER/OWNER : BONGAIGAON REFINERY & PETROCHEMICALS LIMITED CUSTOMER’S PROJECT : RETUBING OF HELITOWER AT CRU – MSQ IN IOCL-BGR. INSPECTION BY :IOCL-BGR. MANUFACUTRED AT:SITE : BRCL,DHALIGAON, ASSAM RETUBING OF HELITOWER / IOCL - BGR CANAAN ENGINEERING PVT LTD

RETUBING OF HELITOWER / IOCL - BGR CORRODED TUBES - OLD HELITOWER

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR BLOCKED TUBES - OLD HELITOWER

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR SKELETON ASSEMBLY OF HELITOWER AFTER REMOVAL OF TUBES

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR SKELETON ASSEMBLY OF HELITOWER AFTER CLEANING

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE SHEET OF HELITOWER AFTER REMOVAL OF TUBES

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE BUNDLE ASSEMBLY OF HELITOWER

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR TUBE BUNDLE ASSEMBLY OF HELITOWER AFTER FINAL TUBING

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR REAR TUBE SHEET OF HELITOWER AFTER FINAL WELD

CANAAN ENGINEERING PVT LTD RETUBING OF HELITOWER / IOCL - BGR FINAL ASSEMBLY OF TUBE BUNDLE HELITOWER