Operations Management Dr. Ron Lembke

Slides:



Advertisements
Similar presentations
Operations Management Dr. Ron Tibben-Lembke
Advertisements

Operations Management Aggregate Planning Chapter 13
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Aggregate Planning 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall.
PRODUCTION AND OPERATIONS MANAGEMENT
OPSM 301 Operations Management
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Operations Management
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 20 1.
Operations Management Aggregate Planning
1 1 Slide Aggregate Planning Professor Ahmadi. 2 2 Slide Planning Tasks and Responsibilities.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Aggregate Planning This Chapter explores:
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
13 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 13 Aggregate Planning.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Production Planning and Scheduling. Production Planning Also Known as Aggregate Planning Problem in Game: Set Production Every Period, Allocate Resources,
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
11- Aggregate and Material Requirements Planning Dr. Ron Lembke.
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
11- Aggregate and Material Requirements Planning
Chapter 14 Aggregate Planning.
13 Aggregate Scheduling PowerPoint presentation to accompany
Operations Management
13 Aggregate Planning.
11- Aggregate and Material Requirements Planning
Dr Sh Salleh bin Sh Ahmad
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Planning and S&OP
13 Aggregate Scheduling PowerPoint presentation to accompany
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Presentation transcript:

Operations Management Dr. Ron Lembke Aggregate Planning Operations Management Dr. Ron Lembke

Learning Objectives Describe planning Distinguish the types of plans Define aggregate scheduling Relate aggregate scheduling to the overall planning process Explain aggregate scheduling options Develop aggregate schedules

Example You’ve started a new company. You’ve developed 2 production plans: Month Forecast Plan 1 Plan 2 Jan 900 900 800 Feb 700 700 800 Mar 800 800 800 You estimate 1 worker can make 100 units per month. Which plan do you use? How many workers do you hire? How do you meet demand?

Planning Setting goals & objectives Determining steps to achieve goals Example: Meet demand within the limits of available resources at the least cost Determining steps to achieve goals Example: Hire more workers Setting start & completion dates Example: Begin hiring in Jan.; finish, Mar. Assigning responsibility

Types of Plans Management Level High Long-Range Facility location Top Executives Intermediate-Range Aggregate plans Operations Managers Short-Range Dispatching Supervisors Low Today 3 months 1 year 18 months 5 years

Aggregate Scheduling Production quantity & timing of production for intermediate future Usually 3 to 18 months into future Combines (‘aggregates’) production Expressed in common units Example: Hours, dollars, equivalents (e.g., FTE students) Time to make ‘average’ product

Relationships of Aggregate Schedule Forecast & Resource Production Firm Orders Availability Planning Work force Inventory Material Master Subcontractors Requirements Production Planning Scheduling No, modify CRP, MRP, or MPS Capacity Shop Requirements Realistic? Floor Yes Planning Schedules

Aggregate Level Scheduling Aggregate Schedule: Month Jan Feb Mar Apr May No. of Chips 600 650 620 630 640 © 1995 Corel Corp.

Aggregate Schedule Example Aggregate Schedule: Month Jan Feb Mar Apr May No. of Chips 600 650 620 630 640 Master Production Schedule: Month Jan Feb Mar Apr May P4 1.5 ghz 300 200 310 300 340 P4 1.7 ghz 300 450 310 330 300

Aggregate Scheduling Goals Meet demand Use capacity efficiently Meet inventory policy Minimize cost Labor Inventory Plant & equipment Subcontract

Aggregate Scheduling Options Capacity Demand Inventory Hire or layoff Overtime or idle Subcontract Part-time workers Outsource Promotion & price Back ordering Counterseasonal product mixing

Costs “Smoothing” costs: Holding costs - charged on inv At end Hiring: advertise, interview, train Firing: severance, bad morale, future hiring Holding costs - charged on inv At end Shortage costs Labor costs / overtime, materials Subcontracting / outsourcing

Aggregate Scheduling Strategies Level scheduling strategy Produce same amount every day Keep work force level constant Vary non-work force capacity or demand Often results in lowest production costs Chase strategy Hire / Fire workers to make production capacity meet necessary production

Aggregate Scheduling Strategies Mixed strategy Combines 2 or more aggregate scheduling options Overtime Price Mixed Strategy Sub-contract Inventory

Aggregate Scheduling Methods Graphical & charting techniques Popular & easy-to-understand Trial & error approach Mathematical approaches Linear Programming Simulation More involved, but usually better answers

Linear Programming Parameters CH = hiring cost CF = firing cost CI = Inv. Cost CR = reg production CO = Ovt. Cost CI = idle cost CS = subcontract nt = days in period t K = daily prod. I0 = Inventory to start W0 = workers to start Dt = Demand for t

Variables It = Inventory for t Ot = Overtime Wt = workers for t Ut = idle time Ht = hired in t St = subcontracted Ft = fired in t Pt= production for t All must be >= 0

Constraints Workforce conservation Wt = Wt-1 + Ht - Ft Units Conervation It = It-1 + Pt + St - Dt Production and workforce level Pt= K*nt*Wt + Ot - Ut Each of these must be satisfied for all t

LP Formulation

LP Considerations LP can be modified to include minimum inv. level each period Negative inventory can be allowed Care needed when rounding

Conclusion Described role of aggregate planning Described types of plans Explained aggregate scheduling options Developed aggregate schedules Chase, Level, and Hybrid Linear Programming