Bologna, 28 Aprile 2010 Buyer-supplier relationship as a lever to increase competitiveness and sustainability. Empirical findings from the construction.

Slides:



Advertisements
Similar presentations
Natale Renato Fazio, Stefano Menghinello, Carmela Pascucci and Carla Sciullo Foreign trade and multinational enterprises statistics Division ISTAT ITALY.
Advertisements

Within- and Between-group Agreement in Supervisors Evaluative Behaviours: Do evaluative styles exist? Jan Noeverman Erasmus School of Economics Department.
Nicholas S. Argyres, Janet Bercovitz and Kyle J. Mayer Presenter: Wen ZHENG.
© Cengage Learning – Purchasing & Supply Chain Management 4 ed ( ) Practice 16. Negotiating techniques and rules of conduct.
1 The Internationalization Process Chapter Key Points Rationale
Chapter 3 Organizational Environments and Culture
The Outsourcing Process
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
FOODIMA Food Industry Dynamics and Methodological Advances Contract No Priority 8.1 B1.1 Sustainable Management of Europe’s Natural Resources 5th.
Developed by Cool Pictures and MultiMedia Presentations Copyright © 2004 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Developed.
Innovative Application of Downstream Alliances By Steven J. Mason MSc 24th November 2000.
Innovativeness & Interaction: Conceptual Research Approach Maria M. Smirnova Sergey P. Kouchtch GSOM Saint Petersburg.
Relationship Marketing
Pesewa Presentations. The Importance of the Knowledge Base Key condition for international marketing success Companies need to accumulate data and information.
Performance Measurement. Integration of Information for Process Improvement and Innovation Palmira López-Fresno President. Quality Service Committee Spanish.
Supply Chain Management
Chapter 13 Sourcing Materials and Services Learning Objectives After reading this chapter, you should be able to do the following:  Understand the role.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
NADEZHDA GOREYKO SVETLANA AVDASHEVA
Purchasing.
Unit 1 Outline Module 1: Innovations and Entrepreneurs Module 2: Small Business Module 3: Marketing Module 4: Accounting.
Organizational Environments and Cultures
1.Macbeth et al. (2012): Procurement and supply in projects: Misunderstood and under- researched. Project Management Institute. 2.Pesämaa et al. (2009):
Organizational Change
BRC project BRC – BUILDING RESPONSIBLE COMPETITIVENESS Responsabilità Sociale d’Impresa e Competitività nel settore delle costruzioni Daniele Ganapini.
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
The Value Of Partnerships Xander Leijnse
Introduction Time Quality Cost Project Constraints Success Introduction.
DBA 6 Bangkok, ID No Thailand
PRICE PLANNING AND STRATEGY
Irwin/McGraw-Hill Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved. 1-1.
Technology preparation and conclusion of foreign trade turnover. Selection of the foreign partner..
Understanding customer expectations and perceptions
Measuring Value in Business Relationship Judit Simon Budapest, November 13, 2007.
HOW TO WRITE RESEARCH PROPOSAL BY DR. NIK MAHERAN NIK MUHAMMAD.
CHALLENGING BOUNDARIES Rhodia way, The way we do business.
Chapter 16 – Controlling the Organization
Copyright  2004 McGraw-Hill Pty Ltd. PPTs t/a Marketing Research by Lukas, Hair, Bush and Ortinau 2-1 The Marketing Research Process Chapter Two.
University of Cagliari, Faculty of Economics, Business Strategy and Policy A course within the II level degree in Managerial Economics year II,
Use with Management and Cost Accounting 9e by Colin Drury ISBN © 2015 Colin Drury Part Five: Cost management and strategic performance management.
CURRENT RESEARCH IN LOGISTICS AND SUPPLY CHAIN MANAGEMENT AT CORVINUS UNIVERSITY OF BUDAPEST Attila Chikán – Andrea Gelei Department of Logistics and.
Factors Influencing Brand Values within the Construction Industry
International Manufacturing Network Embeddedness and Innovative Performance Guannan Xu.
LOGO Mamdouh Abdel Aziz Refaiy Dr. Associate Professor, Business Administration Department, Faculty of Commerce, Ain Shams University, Cairo, Egypt. Evaluating.
Alexander Consulting Enterprise 12/14/2015 Opportunity Identification and Country Selection.
Creating Value through Collaboration
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Fashion MARKETING TID1131. Market Research Understanding Secondary & Primary research Understanding Quantitative & Qualitative research.
Market Analysis Glencoe Entrepreneurship: Building a Business Doing Market Research Industry and Market Analysis 6.1 Section 6.2 Section 6 6.
RETHINKING CONSTRUCTION PRESENTATION BY BILL TAYLOR DEPUTY DIRECTOR OF DEVELOPMENT SERVICES.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Joani Scott. What to Expect Introduction Group Discussion SRM to Obtaining Superior Value Wrap Up / ?’s / Evaluation.
Introduction to research
Managing in the Global Environment
Competitive and Collaborative Strategies.  General Environment ◦ Social, Technological, Economic, Ecological, and political forces  Task Environment.
Army Directorate of Public Works Support Contractor of the Year Building a government contractor for the 21 st century By Carlos Garcia Owner and CEO KIRA.
Social Issues. Social Criticism of World Trade  In 1999, the former UN Secretary General Kofi Annan proposed the Global Compact operations in four areas:
Chapter 3: Purchasing Research and Planning Strategic Planning for Purchasing Strategic planning for purchasing involves the identification of critical.
Dar-Yeh Hwang Department of Finance, College of Business, National Taiwan University, Taipei Taiwan. Chi-Chun Liu Department of Accounting, College of.
Creating Taxpayer Awareness: Corporate Social Responsibility and the Forums for Taxpayer- Tax Administration Dialogue Inter-American Center of Tax Administrations.
Learning Objectives Functions of Human Resource Management
Houda Ghozzi, Claudio Soregaroli, Pascal Tillie, Emilio Rodriguez-Cerezo June 28 th, 2016 Governance drivers in the EU “Non-GMO” soybean supply chain:
Chapter 3 Supply Chain Drivers and Obstacles
Understanding Organizational Buying Behaviour
Opportunity Identification and Country Selection
Selecting Suppliers Revision Seminar.
Gongbo Lin & Qiping Shen Journal of Management in Engineering
Sustainable buildings
STRATEGIC SYNDICATE 4 ALLIANCES. TWC STRATEGIC ALLIANCE WHAT IS STRATEGIC ALLIANCE 2 Strategic alliances are agreements between two or more independent.
SOURCING MATERIALS AND SERVICES
Presentation transcript:

Bologna, 28 Aprile 2010 Buyer-supplier relationship as a lever to increase competitiveness and sustainability. Empirical findings from the construction industry Paolo Barbieri, Mariolina Longo, Matteo Mura Department of Management University of Bologna

Barbieri P., Longo M. and Mura M. 2 Construction industry represents a particularly rewarding terrain for the analysis of CSR issues  A general lack of awareness about the environmental impact produced.  The existence of best practices in terms of eco-compatibility of the production processes and products.  High rate of work-related injuries.  Frequent use of sub-contractors and other modes of outsourcing.  Long and fragmented supply chains that are difficult to control and monitor in terms of quality of work and effectiveness in the management of sub-contract relationships. (Eurostat, 2004) Introduction

Barbieri P., Longo M. and Mura M. 3 Introduction Construction industry is frequently perceived as generally inefficient (Cox and Thompson, 1997; Kadefors, 2004)  cost overruns  high defectiveness (and perceived low quality of tasks’ execution)  frequent project delays  poor productivity  low innovativeness (Dainty et al., 2001; Khalfan et al., 2006)

Barbieri P., Longo M. and Mura M. 4 Inter-firm relational instability due to:  adversarial culture (Cox and Thompson, 1997)  scarce collaboration (Kadefors, 2004)  reciprocal perception of opportunistic conducts (Egan, 1997)  frequent disputes and high level of competitive behaviour (Kamann et al., 2006)  dominant blame-culture (Khalfan et al., 2007)  low level of trust (Korczynski, 1996)  in sum, low satisfaction of the trading parties Introduction

Barbieri P., Longo M. and Mura M. 5  Governance mechanisms of the inter-firm relationships based on transactional / short-term arrangements  These elements reduce the global efficiency of the supply chain and may inhibit company competitiveness (Dainty et al. 2001; Cox, Thompson, 1997) The management of the buyer-supplier relationship represents a critical aspect for construction companies in terms of reduced company competitiveness CSR/ethical practices: The lever to reinforce the contractor-subcontractor relationship (Barnett, 2007; Carter, 2000; Kadefors, 2004; Orlitzky et al., 2003) Introduction

Barbieri P., Longo M. and Mura M. 6 Research gap  Identification of indicators that capture CSR issues that are specific for construction companies (e.g. GRI, 2008; BITC, 2007).  These indicators mainly focus on traditional CSR areas of interest (e.g.health and safety, equal opportunity, eco-compatibility of products and processes), and only marginally consider the buyer-supplier relationship. Aims 1.To identify CSR/ethical practices that address the buyer-supplier relationship and that are perceived to be relevant by managers of construction companies; 2.To explore the adoption of such practices by EU construction companies; 3.To investigate the link between the adoption of such CSR practices and the strengthening of the buyer-supplier relationship. Research Gap and Aims

Barbieri P., Longo M. and Mura M. 7 Step 1 Systematic review of the literature Methodology Step 2 Multiple dyadic case study Step 3 Survey on EU construction firms COMPLETED ON GOING

Barbieri P., Longo M. and Mura M. 8 STEP 1: Systematic review of the literature Construction industry (15 papers revised) CSR practices in the buyer supplier relationship (12 papers revised) CSR and company performance (30 papers revised) Total of 57 papers revised Methodology Identification of a pool of 20 unethical/questionable practices (UP) pursued by the buyer in the relationship with its suppliers Classified in three phases of the contractor-subcontractor relationships: (Hinze and Tracey, 1994) 1. Bidding and entering sub-contract agreement 2. Work execution and sub-contract administration 3. Penalty management and project close-out

Barbieri P., Longo M. and Mura M. 9 STEP 2: Multiple dyadic case study Dyadic study of governance relationships between three Italian general contractors and two suppliers for each organization involved Theoretical sampling: cooperative vs non-cooperative firms Development of a semi-structured questionnaire. Face to face interviews with two top managers for each general contractor and with two suppliers for each general contractor. Methodology

Barbieri P., Longo M. and Mura M. 10 Methodology STEP 3: Survey on EU construction firms 1.Development of a structured questionnaire 2.Development of a database of European construction companies that represent the population of the survey: 1091 companies selected Selection criteria: a)be a construction company (NACE code 41, 42, 43); b)have a turnover of more than 150 M€; c)operating in the EU 15 countries + Hungary; d)Company selection: Amadeus database. 3.Survey on companies (dyadic approach) 4.Analysis of the data collected by using multivariate statistical techniques (e.g. exploratory factor analyses, OLS regression models, structural equations modelling).

Barbieri P., Longo M. and Mura M. 11 STEP 1: Systematic review of the literature Phase 1: Bidding and entering subcontract agreements Preliminary findings 1.Writing specifications that favour a particular supplier 2.Invent a second source of supply to gain competitive advantage 3.Over-estimating the demand to gain advantages 4.… Phase 2: Work execution and subcontract administration 1.Exaggerating the seriousness of a problem to gain concessions 2.Making disparaging remarks about sub-contractors, their products, their performance 3.… Phase 3: Penalty management and project closeout 1.Use penalty deduction systematically, as it was a profit centre. 2.Charge the supplier for delay in task execution, even though the delay could have been originated by someone else. 3.…

Barbieri P., Longo M. and Mura M. 12 Case studies: company interviews Multiple Case Study G.C. A S.A-1: Electrical and Mechanical plants S.A-2: Painting, Flooring, and similar G.C. B S.B-1: Prefabricated pillars and beams S.B-2: Electrical and Mechanical plants G.C. C S.C-1: Formed steel for reinforced concrete S.C-2: Applied geotechnics (Interviews: 2) (Interviews: 1)

Barbieri P., Longo M. and Mura M. 13 Drivers of supplier’s strategic importance Economic impact on buyer’s business (Magnitude of buyer’s annual expense) Supply technical content and impact on safety Impact on final customer’s satisfaction Multiple Case Study (II)

Barbieri P., Longo M. and Mura M. 14 Findings (I) PhasePracticesFrequencyEthical content Bidding/ Supplier Selection Invent a second source of supply to gain advantage / Solicit quotations from suppliers with little chances HighLow to Moderate Over-estimating the demand HighLow Reveal confidential information on quotations Moderate Writing specifications that favor certain suppliers OccasionalRelatively High

Barbieri P., Longo M. and Mura M. PhasePracticesFrequencyEthical content Work Execution Exaggerating the seriousness of problems to gain concessions HighModerate Making disparaging remarks about supplier LowRelatively High Subcontract Administration Penalty managementhighly case- specific Potentially High Findings(II)

Barbieri P., Longo M. and Mura M. 16 Findings(III): Analysis of dyads Occurrence and seriousness of questionable practices: LOW Dyad 1 Strategic value: High Uncertainty: High Supplier performance: Very High Supplier satisfaction: Very High Buyer Satisfaction: Very High Dyad 2 Strategic value: Relatively High Uncertainty: Low Supplier performance: Relatively High Supplier satisfaction: High Buyer Satisfaction: Relatively High Collaboration Cordial agreement on unexpected contingencies Compensations Predictability  Contract Limitations to (potential) unethical conducts

Barbieri P., Longo M. and Mura M. 17 Findings(IV): Analysis of dyads Occurrence and seriousness of questionable practices: LOW Dyad 3 Strategic value: Low Uncertainty: Relatively low Supplier performance: Relatively Low Supplier satisfaction: Moderate Buyer Satisfaction: Relatively Low High pressure on price Difficulties in achieving commitment

Barbieri P., Longo M. and Mura M. 18 Findings(V): Analysis of dyads Occurrence and seriousness of questionable practices: RELATIVELY HIGHER Dyad 4 Uncertainty: Low Supplier bargaining power: Relatively High Contract clauses for supplier protection Cost of negotiation Performance is moderately high, but rigid Buyer’s satisfaction: moderate Dyad 5 Uncertainty: Relatively High Criticality in bidding phase Supplier risk esposure Supplier performance: High Buyer satisfaction: High Importance of proper attitude in work execution Dyad 6 Uncertainty: High Several criticalities Average supplier perfomance, but frequent disputes Buyer satisfaction: moderate Supplier satisfaction: Relatively low

Barbieri P., Longo M. and Mura M. 19 Main Findings Low occurrence/seriousness of questionable practices for strategic suppliers are associated to high performance, and relatively higher reciprocal satisfaction – particularly under higher uncertainty Low occurrence/seriousness of questionable practices for non-strategic suppliers help relationship maintenance Higher occurrence/seriousness of questionable practices lead to context-specific impacts on supplier performance, however: - Degree of conflictuality tends to increase in the dyad; - Suppliers can require protective contract clauses that increase negotatiation costs and rigidness of the relationship; - Degree of mutual satisfaction is generally lower

Barbieri P., Longo M. and Mura M. 20 The proposed model Model Supplier’s Performance 1.Flexibility 2.Quality 3.Reliability 4.Economic performance. Trust Commitment Buyer’s CSR Practices ( + ) ( – ) ( + ) Dominance of price as variable of supplier selection Supplier satisfaction Buyer satisfaction ( – ) ( + ) Supplier’s strategic value ( + )

Barbieri P., Longo M. and Mura M. 21 Survey on BUYERS  Identification of relevant CSR practices adopted by EU construction companies  Development of CSR indicators in the area of:  Buyer-supplier relationship  Environment  Health & Safety  Human Rights  Screening of CSR attitude of construction companies at the EU level Expected Results (I)

Barbieri P., Longo M. and Mura M. 22 Survey on BUYERS and on SUPPLIERS (Dyadic approach) Quantitative analyses of the effect that the adoption of CSR practices has on: 1.Supplier performance 2.Strengthening of the buyer-supplier relationship (governance mechanisms, trust, collaboration …) 3.Buyer performance Analysis of the role played by specific contextual factors like: supplier’s strategic relevance; management of disputes; project modifications; pressure on price/bargaining power Expected Results (II)