Report on international standards work NEFTEGAZSTANDARD 2013 Nizhny Novgorod October 2013 Alf Reidar Johansen OGP Standards Manager.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Workshop on the prevention of accidents of gas transmission pipelines The Hague, 8-9 March 2006 Sergiusz Ludwiczak.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
KAZAN, September 2009 Activities of CEN/TC 12 relative to ISO Standards.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
AGENDA 1. Qatar Petroleum (QP) Standardization and Standards Development. 2. Qatar Petroleum Efforts in Corporate National, Regional and International.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration NW Area Committee Meeting Focus on Pipelines PREVENTION & PREPAREDNESS.
Health and Safety Executive Health and Safety Executive Research Programme for Offshore Malcolm Birkinshaw June 2006.
LIAISON REPORT from CEN/TC 12 G. Trican, Samara, Nov
An Ocean of Opportunity: An integrated maritime policy for the EU 1 Places of refuge: General legal framework and developments within IMO and the EU Alexandros.
Miles Shepherd Chairman ISO Technical Committee 258.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
REGULATIONS and STANDARDISATION an example from CEN/TC 12.
Safety Standards for LNG Fueled Vessels Marine Chemist Qualification Board Baltimore, MD October 23, 2014 CAPT John W. Mauger Office of Design & Engineering.
ISO Technical Committee 67
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Introduction to ebXML Mike Rawlins ebXML Requirements Team Project Leader.
‘2nd YEAR OF ENGINEERING SURVEY PROGRAM OF SKK MIGAS-KKKS’
OGP STANDARDS COMMITTEE MEETING Berlin, Germany Presentation of TC 23: current events and the agenda of the coming years V.V.Vernikovsky, executive.
Health, Safety and Environmental R&D Don Smith International Association of Oil and Gas Producers.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
SS28: Cooperative Systems II: Bits, Bytes, and Brakes Mike Schagrin US Department of Transportation ITS Joint Program Office International Harmonization.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
October 2009 Klaus Grensemann, Division WS 23 St. Petersburg 1 Development and Implementation of an Overall E-Navigation Strategy.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
LIAISON REPORT from CEN/TC 12 G. Trican, Samara, Nov
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
International Atomic Energy Agency THE “EMERGENCY CONVENTIONS” Interregional Training Course on Technical Requirements to Fulfil National Obligations in.
___________________________________________________________________________ 2008/TPTWG30/IEG/01 Agenda Item: 7.0 Action Plan for the Intermodal & ITS Experts.
API-OGP Joint Task Force Update 2013 Exploration and Production Standards Conference on Oilfield Equipment and Materials Dan Mueller ConocoPhillips Vice-Chairman.
Interim Solution What it is and how to to use it 21 June 2012.
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
The Codex Alimentarius Commission
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
International Standards and Regional Regulations.
Status report ISO/TC67 Dr. Ir. Andries Otter Chairman ISO/TC67 TK23 meeting, St. Petersburg 12 September 2012.
1 ISO/TC67 presentation to ISO/TC67/SC4 Stavanger 23,24 May 2011 Global standards used locally worldwide Global standards used locally worldwide ISO Technical.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Regulators’ use of standards Neftegazstandart conference, 9-11 September 2009, Kazan Alf Reidar Johansen OGP Standards Manager.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries LIAISON REPORT of European Standardization Technical.
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 15 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by Cheryl Stark Chair, ISO/TC67 – “Materials, equipment and offshore structures.
MO/LDE0006.PPT SOCIETY OF PETROLEUM ENGINEERS Health, Safety and Environment – Good Engineering practices Global Standards/Cost reductions.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
API - OGP Task Force Update API 2013 Winter Standards Meeting January, 2013 Presented by: Dan Mueller Vice-Chairman API CSOEM.
Joint Statistical Research Program Update. Joint Statistical Research Program Seeks to increase partnerships between IRS and external researchers Goals:
CEN/TC 282 Installation and equipment for LNG
LNG fueled Ships, Considerations & Perspectives
API Q1 and ISO/TS A Case Study in Successful Collaboration
GRI-S : Infrastructures The Union list of projects of common interest
LIAISON REPORT from CEN/TC 12
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Nick Bonvoisin Secretary to the Convention on the
NERC Reliability Standards Development Plan
Status report of TF-CS/OTA
NERC Reliability Standards Development Plan
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Report on international standards work NEFTEGAZSTANDARD 2013 Nizhny Novgorod October 2013 Alf Reidar Johansen OGP Standards Manager

Content OGP Interim Solution Backup slides New ISO/OGP industry proposal Status OGP/API TF on long term solution Other OGP work 2

Introduction US/EU trade regulations has disrupted ISO/TC67 work in the normal ISO environment. OGP Interim Solution was developed to provide a secure environment under the auspices of OGP for those who want to continue the technical work of ISO/TC67. OGP Interim Solution was agreed with ISO Central Secretariat, ISO/TC67 and OGP Management. OGP Interim Solution operated from June 2012 to June

OGP Interim Solution compared to ISO route (simplified) 4 Trade regulation «barrier». Draft standards text and comments will be available in the public domain. Review and approval by OGP PM & Sponsor

Uptake OGP Interim Solution Experts/members 5

Uptake OGP Interim Solution Work Groups 6

Uptake OGP Interim Solution Projects 7

Interim Solution in summary Kicked off 8 June 2012 for 6 months Extended 6 months till 8 June experts registered 68 standard project teams active 19 draft standards completed 14 New Work Items approved 5 drafts stuck on Intellectual Property (IP) issue 8

Next phase OGP Continues to offer a safe platform for drafting international standards to be balloted and published by ISO. OGP and ISO management had a very good meeting in August. The Industry Solution described herein was proposed by ISO Central Secretariat, building on ISO Directives and OGP’s role as a liaison member to ISO/TC67. 9

New OGP solution vs ISO route (draft & simplified) 10 Trade regulation «barrier». Draft standards and comments will be made available in the public domain. Review for controlled technology (TBA) Project initiation 1) Note 1: Project initiation may take place by OGP only. Note 2: Non-OGP members will be invited Note 3: May go to FDIS or publication. Note 4: API material (TBD) may not be used 3) 2) 4)

OGP proposed ISO/TC67 resolution 1.ISO/TC67 welcomes the offer from OGP as a liaison (A) member to continue its assistance in developing draft ISO standards in a protected environment and recommends its members to use this solution, where the SCs/WGs find it relevant. 2.ISO/TC67 requests its secretariat to co- operate with OGP in such an arrangement. ISO/TC67 agreed to these resolution in their plenary meeting in Oslo, September

OGP Administration TF The new solution will be administered by OGP’s Administration TF under the Standards Committee, with membership currently including: Andries Otter, Shell (chairman) Denis Deutsch, Total Per Eirik Fosen, Statoil Alf Reidar Johansen, OGP Jarno Dakhorst, OGP More members welcome! 12

Joint OGP/API TF long term solution Establishement Joint Task Force (TF) established by OGP and API management August 2012 Purpose: Determine a process for the continued development of globally accepted international standards for the oil and gas industry, given the current US and EU trade sanctions. TF membership (15 members): Six members from API, six from OGP members Added two lawyers, one facilitator Staff one each from OGP and API Steering Committee (6 members) 13

Joint OGP/API TF long term solution Terms of References Need for a single set of industry standards to avoid duplication, with the potential for more than one brand, Need for the standards to be globally acceptable and widely used, Need for the standards to be accepted by the regulatory community, A standards setting process as the foundation for the single set of industry standards that builds on the existing API/OGP infrastructure and allows for increased international participation, and Need to ensure a legally compliant process. 14

Current status From 8 options to one pragmatic (draft) solution that provides a process to legally publish standards using either an API or OGP/ISO process path TF will develop governance (front-end process) to ensure coordination between stakeholders to avoid duplication and have the largest possible audience among the global expert community TF awaits the OFAC response to provide the final framework of the proposed solution 15

Other OGP work OGP-IPIECA Good Practice Guidelines for Development of Shale Oil and Gas for European operations in final stages of approval for publication. Wells Expert Committee active on: BOP reliability - being investigated Well Control Incidents Database - alerts Human Factors - Training, Competency & Behaviour guidelines Standards prioritized - OGP Report 485 to be re- issued these days 16

OGP Contacts OGP Reception Tel: Alf Reidar Johansen (Standards manager) Mobile: Jarno Dakhorst (Manager for New Solution) Mobile:

Backup slides 18

OGP New Work Item Proposals (new) Well integrity lifecycle governance – Approved (rev) Glass reinforced plastic (GRP) piping, Parts 1-4 – Approved (new) Guidelines for systems and installations for supply of LNG as fuel to ships – Approved (new) Guidance for conception, design and testing of LNG storage tanks – Approved (new) External coating of riser pipes by poly-chloroprene elastomer specification – Approved (new) Internal coating and lining of carbon steel process vessels – Approved (rev) Guidelines on tools and techniques for hazard identification and risk assessment – Approved (rev) Collection and exchange of reliability and maintenance data for equipment – Approved (rev) Hoisting equipment – Approved (new) Cost Coding System for oil and gas production and processing facilities – Approved (new) Methods for control of corrosion under thermal insulation and fire proofing materials – Approved 19

Published drafts 2012 OGP : PNGI – Specific requirements for offshore structures – Part 8: Marine soil investigations OGP : PNGI – Reliability modelling and calculation of safety systems OGP : PNGI – Drilling and production equipment – Shallow gas diverter equipment OGP : PNGI – Well integrity - Part 2: Well integrity for the operational phase OGP : Characteristics of LNG, influencing the design, and material selection OGP : Design and testing of LNG marine transfer arms for conventional onshore terminals OGP : PNGI – Downhole equipment - Completion accessories 20

Published drafts 2013 OGP : PPNGI – Competency management guidance for well operations personnel OGP : PPNGI – Reliability modelling and calculation of safety systems OGP : PPNGI – Internal coating and lining of steel storage tanks OGP : PNGI – Pipeline transportation systems – Welding of pipelines OGP : PNGI – Control and mitigation of fires and explosions on offshore production installations – Requirements and guidelines OGP : Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface More next slide

Published drafts 2013 OGP : PNGI - Metallic materials resistant to sulfide stress cracking in corrosive petroleum refining environments OGP : PNGI - External coatings for buried or submerged pipelines used in pipeline transportation systems - Part 2: Single layer fusion-bonded epoxy coatings OGP : PNGI - Specific requirements for offshore structures - Part 1: Metocean design and operating considerations OGP : Guidelines for systems and installations for supply of LNG as fuel to ships OGP : PNGI - Drilling and production equipment - Part 1: Electrical submersible pump systems for artificial lift OGP : PNGI - General requirements for offshore structures 22

Requested clearance to publish under 1 August 2012 agreement OGP Offshore production installations - Basic surface process safety systems (Rev. of ISO 10418:2003, incl. Corr. 1:2008). OGP Drilling and production equipment - Hoisting equipment (Rev. of ISO 13535:2000). API Spec 8C that was published in April OGP Design and operation of subsea production systems - General requirements and recommendations (Rev. of ISO :2005 incl. Amd 1:2010) API RP 17A:2006 adoption of ISO :2005 Identical. OGP Pressure-relieving and depressuring systems (Rev. of ISO 23251:2006 incl. Corr. 1:2007 and incl. Amd 1:2008). API Std 521: Add adoption of ISO 23251:2006. OGP Venting of atmospheric and low-pressure storage tanks (Rev. of 28300:2008 incl. Corr. 1). API Std 2000:2009 adoption of ISO 28300:2008 Identical. 23 These are stuck!