Chapter 1 The Design Process.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Integrated Solutions for Hospitality Projects.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Developing and Presenting a Design Plan Just FACS.
Programming Dream Environment Identify Goals Listen & Learn Heritage Perception Image Future Challenges Restraints Budget Process Workflow Culture Executive.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Developing and Presenting a Design Plan Just FACS.
Commercial Building Project Portfolio
Facilities Management and Design
Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.
Office Designs The Design Process at Work © MS Office Suite.
Primary Residential Design Considerations
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
HOSPITALITY MANAGEMENT Ch. 16 HS. THE GENERAL MANAGER  General Manager – is a person responsible for the entire operation of one unit of a hospitality.
Programming Chapter 25 – Interior Design Reference Manual.
Design & Layout of Foodservice Facilities
INTD 51 rough floor planning. after the pre-planning process is complete, it is time to develop a floor plan that satisfies the needs mapped out through:
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
3 interior planning + design conference room
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Welcome to your music business. So what do you need to do to get started? PLAN & ORGANISE Otherwise you may never get started and even if you do, the.
Construction Specifications
COMMERCIAL DESIGN INDE 86. INDE 86 COMMERCIAL DESIGN design of revenue-generating spaces.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
TECHNOLGICAL DESIGN Architectura l Design Process.
Interior Design Chapter One SOLVING THE PROBLEM After the research and data have been collected and articulated in the written program can the developments.
Site Selection & Layout Planning. Community & Site Selection Factors in Community Selection Location Make or Break Decision May Be Permanent Customer.
Schematic Design Developing a Design Plan The major difference between an untrained designer and a skilled expert is the expert depends upon a “flow chart”
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Ch. 18 Developing a Design Plan Objectives: Identify the first five steps in developing a design plan Analyze the importance of learning about client’s.
Developing Commercial Design Plan Micah Rooke Georgia CTAE Resource Network 2010.
CHAPTER 3 Resolution and Design. Predesign Phase Programming –Functions to: Guide Inform Inspire the project designer –Not a ‘grocery list’ –Not a ‘wish.
Preparing the Bid Package (A Developers Perspective)
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
A few different things… ID 206 construction + materials II.
Library Renovation Dos & Don’ts. Paul Glassman Felician College How to Design Functional, Flexible, & Forgiving Library Spaces.
PROJECT MANAGEMENT Bedrock Learning, Inc Hemlock Drive Holland, MI USA Office: Facsimile:
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Interior Design Chapter One The Process of Design DESIGN IS THE PROCESS OF PROBLEM SOLVING Letter of Agreement Outlines the responsibilities of the designer.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Chapter 20 Developing a Design Plan. Objectives 1. Identify the steps in developing a design plan. 2. Explain how to assess client characteristics. 3.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
ARC 102 FINAL PROJECT PRESENTATION VACATION HOUSE ARC 102 FINAL PROJECT PRESENTATION.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Developing and Presenting a Design Plan
Developing and Presenting a Design Plan
CONTRACT DOCUMENTS.
Remodeling and Renovating
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Architecture during Construction ‘observation administration’
Process Drawings Matrix, Bubble, and Block Plans
Process Drawings Matrix, Bubble, and Block Plans
Commercial Construction Projects
Creating a Design Plan Working with Clients.
Pre-programming and programming design phases
FIVE PROJECT PHASES.
Architecture & Interiors Design Process
Presentation transcript:

Chapter 1 The Design Process

Design is the process of solving problems.

Where to begin?

Design Process Client Profile/Interview/Problem Statement Letter of Agreement Programming and analysis Conceptual/Schematic Design Final Design Development Contract Administration Evaluation

Client Profile / Problem Statement What is the nature of the project? vacation home, primary residence, rental home, office, restaurant, hotel etc. Establish a client profile: a brief statement that identifies the client, location, project, purpose, and extent of work. Little detail has yet been researched

Why is the initial meeting so important for both the designer and the customer? Evaluate compatibility (don’t take every job, may not be profitable…) Does the project fit the firms area of specialization , is there a reasonable time frame and does the firm have the appropriate staff load to complete the project. Client can evaluate firms work.

A word about time frame… Deadlines are critical in the design business. Penalties may apply. Work backwards from the expected completion date to set schedule for each phase. If you see the time frame is not feasible, walk away or convince them that the time frame needs to be longer.

Letter of Agreement A legal contract between you and your client. Outlines the responsibilities of the designer Outlines financial obligations of the client for reimbursement, fees, time of payment Serves to protect you from wasting your time on projects that may not come to reality or a client using a different designer Get this contract signed before you do ANY work or you may be giving away your services!

Programming (5 – 15%) Information gathering – Research – programming Identify and analyze customer needs Interviewing customer and end users User profile Inventory products to be used Lifestyle and Function Relationships/adjacencies Space allocations Environmental factors Mechanical systems (HVAC) Psychological/Sociological Economic factors – extremely important Building codes Design preferences

Programming is the Most crucial phase of the design process “Good beginnings make for good endings” You must be detailed and precise in your gathering or you will fail in the end result. You will need to analyze the information, prioritize the need and the wants and if any questions come up, make sure to go back and get them answered. You will write the program and the customer should review it and approve it before moving to the next phase of the design process. FYI: A commercial program is sometime hundreds of pages in length. It is a document that will be used by the entire design team, architects, mechanical, structural, electrical engineers, and designers.

Commercial Programming Budget for renovation, furniture and finishes. Style preference, image. Existing furniture, artwork and accessories to reuse. Field measuring space, locating columns, outlets, network jacks, thermostats, HVAC returns. Photograph existing space, inventory and new space Determine codes and safety requirements that need to be met. (occupancy classifications, occupant loads, egress widths, ADA, etc.) Determine the schedule/deadline Determine space allotments or standards, adjacencies, privacy issues storage and filing needs (measure file storage). Understand equipment needs, sizes use and location

Residential Programming Personal Information Age, number, sex, size, activities and relationships of everyone living in the house. Stage in the lifecycle : flexible spaces Lifestyle Hobbies, activities, entertainment, meals, music games, TV, cooking etc.) How long do they plan to live in the house.

Residential Programming Taste…likes and dislikes of the family. How do you find this out? Functional Goals special needs, universal design, media room, home office, energy efficiency Space Requirements: How much sq. footage Minimum of 300-500 per person See sample questions on page 10 Equipment Needs: TV, cable, video, computers, security system

Residential Programming Cost Estimates and budgets: Most expensive purchase: Americans spend 2-4 times their annual income. Kitchen and bathes are most expensive spaces Sq. foot estimate vs. material and cost estimate Know the avg. price per sq. foot in the neighborhood. 25% of income goes to house payment How can you help customer save money? Life cycle costing Maintenance issues Standard sizes, colors and finishes Keep plumbing back to back Plan ahead Keep change orders to a minimum

Residential Programming Site and orientation Restrictions on placement, color, size etc. Solar orientation, south windows, fading Wind View

Conceptual / Schematic Design The formulation of preliminary broad-based concepts. Written concept statement Decisions on character, function and aesthetics Matrix: indicates relationships of spaces Bubble diagram 170, 171 Block diagrams 170, 171 Preliminary Floor plans/ space plan 19 Selecting preliminary color options Preliminary furniture options

Matrixes and Bubbles

Block Plans

Schematic Floor Plan

Design Development (30-35%) Approval from customer on schematic design has been given. Construction Documents Floor plan Elevations Sections Furniture and finish plans Power and Communication Plans Lighting, Reflected Ceiling Plan Write Bid Specifications FF&E Spec Book Work with other professionals Electricians Structural engineers Mechanical engineers

Dimensioned Plan

Reflected Ceiling Plan

Sections and Elevations

Finish Schedules

Design Development Rendering

Design Development Rendering

Design Development Rendering

Contract Administration (5-15%) All design decisions become reality – most rewarding of the phases. Orders are placed. General contractor, subcontractors begin building, installing products. Coordination is critical in order for subs not to interfere with each others work. Site visits become regular to check quality and to stay on schedule. Punch list is established. Furniture is installed.

Evaluation Follow-up on job to measure the success of the products specified. How effective was the design? Did it meet the needs of the customer? Are the products specified holding up? Post Occupancy Evaluation (POE) provides the professional designer with the information needed to evaluate and measure a successful or unsuccessful design