LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb 20151.

Slides:



Advertisements
Similar presentations
LINAC 4 Emittance Meter.
Advertisements

Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Name (Lab)Presentation title (Place, date) 1 IN2P3 Les deux infinis Optical cavity Revue ThomX mécanique (25/01/2011) Optical cavity Yann Peinaud & Mickael.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
SPECTRAP - GSI progress report and status overview.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
SPS New Wire Scanner Mechanics Review
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 19 Nov 2014 F.Roncarolo 19 Nov
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
The HIE-ISOLDE Faraday Cup
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
7/06/20111 Linac4 Ion Source Review Design and production D. Steyaert – G. Favre Linac4 Ion Source Review Design and Production New LINAC4 Front end Chamber.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Installation of the T600 at Fermilab CSN2, September 22,
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ESS Front End diagnostic
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Pelletron status update Main Injector Departmental Meeting November 11 th, 2009 L. Prost.
LIU – EVM status and next steps
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
TS2 preparatory meeting
GSI IPMs.
Integration of the e+ elements
Ti/SS transitions A.Basti INFN-PISA*
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
LINAC 4 source & LEBT measurement results
ELENA electron cooler and SEM grids status
SPS East Extraction bump inhibit during COLDEX operation
J. Bento - Taking over the responsibility of the RF-bypasses
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
Parts exchange for HL-LHC AUP Q1&Q3
LINAC4 LEBT beam size and emittance diagnostics
Proton Beam Diagnostics
questions for cern – doyle rev 7/09/07 1/5
Teleconference ACS – FREIA 19th June 2017
Status of the BI Work Package in the LIU-PSB frame
LHC BIF test setup - update
Presentation transcript:

LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb 20151

Last BI Update was on Nov 19 th 2014 ( Open Issues: Pepper Pot Faraday Cups SEM Grids F.Roncarolo 18 Feb 20152

Pepper Pot Issue: cooling circuit vacuum leak Decision to have it inspected and repaired at Pantechnik Report received on Jan 15 th (document here)document here F.Roncarolo 18 Feb Results of tests after the detector reception at Pantechnik (Nov 2014): 1st Cycling test : 10 cycles at 5 bars during 15 min = OK 1st Long Term Stability test 24h at 5 bars = OK 2nd Long Term Stability test 15h at 5 bars = OK 2nd cycling test : 13 cycles at 5 bars during 15 min = OK 3rd Long Term Stability test (during the week end) = major leak after 49 hours and turn the leak detector in default mode (> mbars.l.s-1 ) A leak test has been performed on the water circuit, the leak is detected only when the pressure is increased over 2 bars. The water flange has been disconnected from the Tantalum screen and each side of the circuit has been tested. We detected a leak on both side but it was impossible to determine if the leak appeared on the bellow or the ceramic. Finally it was decided to build a new flange with a new water circuit (bellows, ceramics, fittings, solders). Result of tests with new cooling circuit (Jan 2015) : 10 cycles at 5 bars during 15 min = OK 1st Long Term Stability test 55h at 5 bars = OK 2nd Long Term Stability test 17h at 5 bars = OK Leak rate always stable at ~2, mbars.l.s-1

Pepper Pot Detector was sent back to CERN Reception on Jan 14 th Decision: TE-VSC to validate the system before instalaltion  Installation not possible by end of LINAC3 YETS (Jan 16 th ) TE-VSC (Alice) completed long term pressure cycles this week Looks OK  Install detector at next LINAC3 stop ? F.Roncarolo 18 Feb 20154

Faraday Cup(s) Old Issue: negative peaks (from shower of secondary electrons?) BI-ML looking into new design (no dates yet) New Issue Sparking with Argon Related to inspection December 2014? We re-put signal and bias cables as they were before If you believe there is a bad wiring, we need to open Do we have expected beam distributions (Ion species and transverse distributions) ? With this we could simulate Old and New issue F.Roncarolo 18 Feb 20155

SEM grids Issue: grid frame sticking into beam pipe aperture when in parking position  Charge collection / beam kick  Potential heating / damage After BI-ML (C.Vuitton) inspection (December 2014): 1. Changer le vérin FESTO course 100mm par un vérin FESTO DNC PPV (amortissement) course 125mm pour gagner 12 à 15mm de course direction « garage ». Remarques: pas nécessaire de changer le vérin d’équilibre AIRAX (course 120mm) ni les 2 soufflets. 2. Réduire l’ouverture du tank en installant une bague avec diam de passage faisceaux de 80mm. Actions : acheter le vérin Festo et fabriquer une ou 2 bagues de réductions. demander un arrêt de 1 jour : retirer le moniteur du LINAC 3. échanger le vérin. réglage des courses. (Nécessité de mettre le moniteur sur un banc d’alignement.) Installer la bague de réduction (diam 80mm) dans le tank. Remonter le moniteur. For the moment modification foreseen for ITL.MSG03, procurment of pieces launched for lab test validation If all ok: LINAC3 in 3 months F.Roncarolo 18 Feb 20156

SEM Grids – New requests (from BE-ABP, G.Bellodi) Can we change the number of wires and the wire ITL and ITM SEM grids? Electronics: easy to pass from 25 to 32 wires per plane Mechanics: BI-ML investigating, should be possible, need ~3 Months (re-design ceramic PCB wiring) Can we read-out L3 SEM-grids signal with time resolving along beam pulse? YES: electronics and FESA class already sampling ADC at 4us, just need to modify OP GUI F.Roncarolo 18 Feb 20157

SPARES F.Roncarolo 18 Feb 20158

New Pepper Linac3 Purchased from Pantechnik F.Roncarolo 18 Feb New diagnostics tank hosting Slit Pepper Pot FC Pepper Pot

F.Roncarolo 18 Feb

New Pepper Linac3 F.Roncarolo 18 Feb Here in the parking position BEAM Pepper pot plate MCP, PHOSPHOR Mirror Camera