Comanche Peak Nuclear Power Plant 1. TERMINAL OBJECTIVES Describe Comanche Peak Design Basics Describe Nuclear Fuel used at Comanche Peak Describe the.

Slides:



Advertisements
Similar presentations
Nuclear Power Plants. Nuclear Power Plant Turbine and Generator Spinning turbine blades and generator Boiling water Steam.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Nuclear Power. Source: Uranium-235 Process: – An unstable uranium nucleus is bombarded with a neutron and splits into two smaller nuclei and some neutrons.
The Harnessed Atom Lesson Six Atoms to Electricity.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Accidents Happen But Nuclear Accidents Require Special Skill!
Nuclear Energy. Possible Exam Questions 1.Compare the environmental effects of coal combustion and conventional nuclear fission for the generation of.
NUCLEAR POWER PLANT. NUCLEAR FUEL  Nuclear fuel is any material that can be consumed to derive nuclear energy. The most common type of nuclear fuel is.
Three-Phase ac Voltage Generation
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
Nuclear Plant Systems ACADs (08-006) Covered Keywords
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
Nuclear Power Station Lecture No 5. A generating station in which nuclear energy is converted into electrical energy is known as a Nuclear power station.
Nuclear Energy Energy – It’s Everywhere!. 2 Nuclear Energy Atoms are small particles that make up all matter. Each atom is made of outer electrons and.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
THE FUTURE OF FUKUSHIMA CHAPTER 23 NUCLEAR POWER Can nuclear energy overcome its bad rep?
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Nuclear Reactions Chemistry Mrs. Coyle. Part I Fission and Fusion.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
How they work and what happened at Fukushima Daiichi Plant.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
Geologic Resources: Nonrenewable Mineral and Energy Resources Chapters 14 & 15 G. Tyler Miller’s Living in the Environment Chapters 14 & 15 G. Tyler Miller’s.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
S A C C O N E A P E S Chapter 11: Nuclear Energy
Fission and Fusion Nuclear Fission
Nuclear Power Plants. History of nuclear power 1938– Scientists study Uranium nucleus 1941 – Manhattan Project begins 1942 – Controlled nuclear chain.
Nuclear Energy Chapter 12. Nuclear Fuel Cycle Uranium mines and mills U-235 enrichment Fabrication of fuel assemblies Nuclear power plant Uranium tailings.
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Power Generation In The United States. 103 Nuclear Power Reactors.
Fission Physics 12 Adv. Comprehension Check 1. Two deuterium nuclei fuse to form a tritium nuclei and a proton. How much energy is liberated? 2. A deuterium.
The Pilgrim Power Plant By Khloe, Oliver, Galina, Robert and Rachel.
Section 2Nuclear Changes Classroom Catalyst. Section 2Nuclear Changes Objectives Describe nuclear fission. Describe how a nuclear power plant works. List.
Building a CANDU reactor
Nuclear Power Plants. Nuclear Power Plant Turbine and Generator Spinning turbine blades and generator Boiling water Steam.
III. Nuclear Power. A. Reactions and Sources 1. Uses energy released by nuclear fission- the splitting of the nucleus of an atom 2. Nucleus is hit with.
O Level Physics Chapter :26: Particles Prepared By: Shakil Raiman.
What is a Fission Reactor?What is a Fission Reactor?  The Principles of Fission Reactors are similar to that of an Atomic Reactor  Fission Reactors.
Chapter 12 Nuclear Energy.
Fukushima Power Plant – Japan Post March 11, 2011
© Copyright Pearson Prentice Hall Slide 1 of 20 Fission and Fusion of Atomic Nuclei The sun is not actually burning. If the energy given off by the sun.
Natural Convection as a Passive Safety Design in Nuclear Reactors
Brevard Community College EST1830 Bruce Hesher
By: Joe Jackson Nuclear Power Plant.
Chapter 11 Nuclear Power  Energy released in combustion reactions comes from changes in the chemical bonds that hold the atom together.  Nuclear Energy.
Nuclear Fission 6B Cheng Pui Ling (7) Tsang Wai Man(23)
By Kasey Poirier, Eean Albro, Chase Lee
Nuclear Power Plant How A Nuclear Reactor Works.
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
1 Nuclear Science An Overview Of Atomic Energy and Nuclear Power Plants Mr. Schimanski Feb 17, 2015.
Nuclear Power. Nuclear Fuel  Primarily involve nuclear fission  Fuel: typically is uranium-235 Must be enriched, as the most abundant isotope of uranium.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
25.3 Fission and Fusion > 1 Copyright © Pearson Education, Inc., or its affiliates. All Rights Reserved. Chapter 25 Nuclear Chemistry 25.1 Nuclear Radiation.
COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING MENB INTRODUCTION TO NUCLEAR ENGINEERING GROUP ASSIGNMENT GROUP MEMBERS: MOHD DZAFIR.
Chapter 25 Nuclear Chemistry 25.3 Fission and Fusion
Nuclear Power Station A generating station in which nuclear energy is converted into electrical energy. Nuclear reactors, which produce heat by splitting.
Fission and Fusion of Atomic Nuclei
DCPP Performance Based on NRC Performance Indicators
25.3 Fission and Fusion of Atomic Nuclei
Nuclear (Atomic) Power Plant
ENERGY SOURCES Nuclear Energy
Fission and Fusion of Atomic Nuclei
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Chemistry 25.3.
Emergency Preparedness
Fission and Fusion.
Chemistry 25.3.
Chemistry 25.3.
Presentation transcript:

Comanche Peak Nuclear Power Plant 1

TERMINAL OBJECTIVES Describe Comanche Peak Design Basics Describe Nuclear Fuel used at Comanche Peak Describe the Basics of Nuclear Fission and identify how Comanche Peak produces power 2

TRAINING OBJECTIVES Identify the configuration of the Comanche Peak Electrical Distribution System Identify the Electrical Distribution System offsite power requirements Identify Comanche Peak’s Minimum Switchyard Voltage Requirements Identify Comanche Peak’s Station Blackout Requirements Identify how Grid Frequency Disturbances affect Comanche Peak 3

Comanche Peak Design Basics Two Nuclear Power Plant Units: o Unit 1: Winter Maximum HSL of 1235 NMW o Unit 2: Winter Maximum HSL of 1225 NMW 4 Loop Pressurized Water Reactors (PWR) Commercial Operation Dates: o August 1990 CPNPP Unit 1 o August 1993 CPNPP Unit 2 2 Independent Trains of Safety Equipment for the safe shutdown of each unit 4

Comanche Peak Information Located in Somervell County –2 nd Smallest county in State of Texas 7,350,000 hours since last Lost Time Injury Payed $34 million in local taxes this year 706 Luminant employees 199 Contract employees 479 Teammates 19,896,924 Net MWH generated in

Comanche Peak Information Institute Of Nuclear Power Operations (INPO) 1 rating last 3 bi-annual assessments. Last 5 years achieved 98% capacity factor making CPNPP best operating nuclear plant in USA Community projects include –United Way of Hood County –United Fund of Somervell County –Healthy Habitat Wildlife Restoration Project Squaw Creek Park –Project Lead the Way, Science and Math career curriculum with Granbury ISD 6

Fission Occurs when the nucleus of a relatively large atom (such as U-235) absorbs a slow moving neutron. Upon neutron absorption, U-235 becomes the unstable isotope U-236 and splits into two fission fragments. As part of the fission process, additional neutrons and gamma radiation is released. The kinetic energy released produces heat which is ultimately converted to steam and electrical energy. 7

Nuclear Fuel Properties Most common fuel used in commercial reactors is Uranium-235. Under 1% of the uranium found in nature is the easily fissionable U-235 isotope and as a result most reactor designs require enriched fuel. Most commercial reactors use uranium enriched to about 4% U-235. Uranium Oxide fuel is manufactured into ceramic pellets. 8

Uranium Oxide Fuel Pellet 9

Fuel Assemblies Pellets are inserted into Zirconium Alloy tubes and sealed. These tubes are called fuel rods. Fuel rods are joined together to form assemblies, also called fuel bundles. 10

Control Rods Control rods are made of material that readily absorbs neutrons but will not fission. Common materials are Silver, Indium, and Cadmium. Control rods are inserted vertically into guide tubes within the fuel bundle and can be withdrawn as needed to control reactivity within the core. 11

Control Rod Assembly 12 Fuel Bundle / Assembly is the entire unit

Fuel Assembly Inspection Engineering and Quality Control personnel inspect each fuel assembly for defects, flaws or blemishes prior to accepting for use. 13

Energy Output A kilogram of Uranium-235 (U-235) converted via nuclear processes releases approximately three million times more energy than a kilogram of coal burned conventionally. * * * 3,000,000 times * * * 14

Squaw Creek Reservoir Primary SystemsSecondary Systems Comanche Peak Overview 15

16 Unit 2Unit 1 345kV yard 138kV Yard Safe Shutdown Impoundment

NUCLEAR FISSION PRODUCT BARRIERS OF PROTECTION NUCLEAR FUEL CLADDING REACTOR COOLANT SYSTEM CONTAINMENT STRUCTURE 17

NUCLEAR FISSION PRODUCT BARRIERS OF PROTECTION 18

Reactor Cavity Fuel Load 19 Fuel Assembly Reactor

Spent Fuel Pool 20 Fuel Assembly

Containment Building 21 Unit 1 Unit 2 Fuel Building Equipment Hatch

REACTOR COOLANT SYSTEM - LOSS OF COOLANT ACCIDENT (LOCA) SECONDARY SYSTEM STEAMLINE BREAK NUCLEAR FUEL HANDLING ACCIDENT IN THE REACTOR CONTAINMENT OR FUEL HANDLING BUILDING NUCLEAR ACCIDENT CATEGORIES 22

NUCLEAR DESIGN BASIS ACCIDENTS (DBA) A DBA represents the worst case possible accident within an accident category. The initial conditions of a DBA assumes a complete loss of ALL normal offsite and onsite AC electrical power and failure of one emergency diesel generator. One safety-related train can effectively mitigate all DBAs. Comanche Peak has two safety- related trains for each nuclear unit. 23

ESF PROTECTION SYSTEMS Engineered Safety Features (ESF) Protection Systems provide the necessary systems to ensure that CPNPP can mitigate a Design Basis Accident (DBA) by protecting the nuclear fission product barriers and preventing public exposure to radiation. 24

Comanche Peak Electrical Distribution System 25

For back feed ops, ground at Generator flex link elephant foot and Upper PT fuses 26

27

28

29

Operability Pairs for OPT kV Decordova 345 kV Johnson Sw. 345 kV Comanche Sw. 345 kV Parker #1 345 kV Parker #2 345 kV Everman 345 kV Wolf Hollow 138 kV Decordova and any 345kV ckt. 138 kV Stephenville and either Parker 345kV ckt. 30

Nuclear Plant Interface Requirements (NPIRs) NERC Reliability Standard NUC-001 requires that a nuclear power plant and applicable Transmission Entities have an agreement in place to ensure that all parties understand the nuclear power plant’s Nuclear Plant Interface Requirements (NPIRs). 31

Nuclear Plant Interface Requirements (NPIRs) CPNPP’s NPIRs include the following:  minimum and maximum Comanche Peak switchyard voltage (post-contingency following both units being offline, post-trip)  maximum available short circuit current at the Comanche Peak switchyard  Minimum of 2 required transmission lines being in service at the Comanche Peak switchyard  maximum and minimum grid frequency that Comanche Peak safety-related equipment can support 32

CPNPP Minimum Switchyard Voltage Requirements CPNPP switchyard voltage is normally around 348 kV. The CPNPP switchyard Voltage Requirements for Operability are: Minimum and Maximum voltages for 345 KV are: KV Minimum and Maximum voltages for 138 KV are KV 33

CPNPP Minimum Switchyard Voltage Requirements These minimum switchyard voltage values ensure that safety-related equipment stay connected to offsite power (preferred source of power) in the event of a nuclear accident, as opposed to connecting safety-related equipment to the station’s Emergency Diesel Generators. If the minimum switchyard voltage requirement for the given CPNPP electrical bus alignment cannot be met, then CPNPP is required to enter a Limiting Condition for Operation (LCO). This initiates a requirement to shutdown the plants at 24 hours (both offsite sources affected) or 72 hours (one offsite source affected). 34

Loss of Offsite Power (LOOP) Offsite power is needed to prevent degradation of the fission product barriers and to provide electrical support for systems and subsystems needed for cooling. As a nuclear power plant, Comanche Peak is a priority load, and offsite power should be restored to the plant within 4 hours. Also, each Comanche Peak unit has two independent emergency diesel generators (one per safety-related train) that provides emergency AC power to safety- related equipment during a LOOP. Comanche Peak cannot restart the Units without offsite power support. 35

Station Blackout (SBO) If both offsite power and onsite AC power Emergency Diesel Generators (EDG) are lost, then Comanche Peak will experience a station blackout. Comanche Peak has safety-related station batteries that can support a 4-hour SBO event. The safety-related station batteries are used to perform the generator field flash required to start an Emergency Diesel Generator and power inverters for protection and instrumentation. 36

Comanche Peak Blackstart Plan Comanche Peak has developed a Blackstart Plan that focuses on power restoration from near by Decordova SES. The combustion Turbines at Decordova will be started and aligned to the 138 KV switchyard to provide Comanche Peak offsite power. Special procedures have been developed and are routinely practiced by Comanche Peak Operations personnel. 37

Grid Disturbances On large plant trips (i.e. South Texas), or grid disturbances, Comanche Peak safety-related equipment is designed to operate during grid frequency deviations. Comanche Peak safety-related equipment can operate under minor grid frequency fluctuations. The Reactor Coolant Pumps will trip on Under- frequency Protection at 57.2 Hz. The Reactor Coolant Pumps also trip on Undervoltage at 4850 volts. (70% of 6900 volts) If the Reactor Coolant Pumps trip, the reactor will also trip and the unit automatically shuts down. 38

Grid Disturbances The Main Generator Turbine Control System is not configured to respond to grid frequency fluctuations and will cause reactor power fluctuations.  The main generator is operated in a manner to maintain constant loading.  Per its Operating License with the Nuclear Regulatory Commission (NRC), Comanche Peak is not permitted to exceed the thermal limit of the nuclear reactor. Nuclear power control is ONLY ALLOWED under the control of NRC licensed operators. 39

CPNPP Reactor Operator Reactor Operators train for 1 year and then must pass Nuclear Regulatory Commission written and performance examinations prior to being awarded their license. 40

Dry Cask for Spent Fuel Storage Dry Casks are stored outside in a fenced, guarded slab. 41

New Steam Generator Unit 1 steam generators were replaced in

Control Room Simulator Reactor Operators and Senior Reactor Operators train once every five weeks on normal and accident scenarios in the control room simulator. 43

Artist conception of CPNPP Units 3 and 4 Project Engineering with Mitsubishi is currently on hold as they assist in the Fuskishima Diachi recovery effort. CPNPP is still pursuing the combined construction and operating license from NRC 44

Questions ? ? ? ? 45 Questions

1.A minimum of _________ transmission lines should be in service at all times at Comanche Peak. a)two b)three c)four d)five 46

2.The preferred source of offsite power considered by Comanche Peak in the event of a blackout is? a)Decordova 345kV b)Decordova 138kV c)Parker Switch 345kV d)Everman Switch 345kV 47

3.The CPNPP 345kV minimum and maximum switchyard voltage requirements for Operability are _______________. a)340kV and 361kV b)339kV and 362kV c)338kV and 363kV d)337kV and 364kV 48

4.As a nuclear power plant, Comanche Peak is a priority load, and offsite power should be restored to the plant within __________ hours. a)two b)four c)six d)eight 49

5.Comanche Peak’s main generator turbine controls are not configured to respond to ______________fluctuations. a)Grid frequency b)Regulation up c)Regulation down d)AGC signal 50