Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.

Slides:



Advertisements
Similar presentations
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 11 October 2011.
Advertisements

Effect of b-tagging Scale Factors on M bb invariant mass distribution Ricardo Gonçalo.
ZH ➝ ννbb news & plans Ricardo Gonçalo ZH->ννbb phone meeting – 24/1/2012.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 2 August 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 30 August 2011.
4/10/12 Contribution in ATLAS Collaboration 1 Talk “Multi-jet balance for high pT jet calibration” presented on ATLAS Hadronic Calibration Workshop 2011(SLAC.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
H → ZZ →  A promising new channel for high Higgs mass Sara Bolognesi – Torino INFN and University Higgs meeting 23 Sept – CMS Week.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 5 April 2011.
Introduction Ricardo Goncalo ATLAS-UK Higgs Meeting, 3 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 26 April 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 10 May 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 22 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 8 March 2012.
H ➝ bb search and b-tagging Ricardo Gonçalo on behalf of the Higgs subgroup 5.
Search for the Standard Model Higgs boson produced in association with a vector boson and decaying to a b-quark pair with the ATLAS detector at the LHC.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 9 March 2011.
Physics Validation. Validations 18/12/13: DC14 (1) 5 validation tasks for this week: Several DC14 simulation tests, grouped into 3 tasks 2 tasks on IBL/ITK.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 23 August 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 31 May 2011.
Searches for the Standard Model Higgs at the Tevatron presented by Per Jonsson Imperial College London On behalf of the CDF and DØ Collaborations Moriond.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Timescale The nominal dates for SM approvals for EPS are June 30 and July 7 for the Plenary meetings, with availability of a draft supporting note to the.
Plenary Physics Meeting, 17 June 05 Per Jonsson Imperial College London 1 Higgs Searches with 1 fb -1 Per Jonsson Imperial College London On behalf of.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 8 November 2011.
H IGGS SEARCH IN THE H ➝ bb CHANNEL IN ATLAS Ricardo Gonçalo Royal Holloway University of London on behalf of the ATLAS Collaboration International Europhysics.
First ed. board for CERN Council note Ed.board meeting on Friday:
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 March 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 7 June 2011.
E. Nagy - Low Mass Higgs 28th July 2011 Status of the ZZ-->llbb search1 Status of the ZZ  llbb search for the zh-llbb Team S.B. Beri, S. Caughron, M.-C.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
HSG5 Report: ongoing activity and 2012 plans Ricardo Gonçalo (RHUL) Higgs Working Group Meeting – 10 May 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 15 November 2011.
28/01/101 Zvv bkg, how to get an estimate with first data ? R. Brunelière Time schedule is tight. Goal : get an estimate by may/june if we get data from.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 February 2011.
Introduction Malachi Schram (McGill), Ricardo Gonçalo (RHUL) H->bb Note Meeting, 15 December 2010.
H->bb Status Ricardo Gonçalo (RHUL) on behalf of the H->bb analysis team HSG5 Meeting, 16 February 2011.
HSG5 Status Paper/note circulation: Reading of draft 1on 24 th April: – Talks by Giacinto and Pippa Inputs for combination: separated WH/ZH for vvbb next.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
La Thuile, March, 15 th, 2003 f Makoto Tomoto ( FNAL ) Prospects for Higgs Searches at DØ Makoto Tomoto Fermi National Accelerator Laboratory (For the.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
EPS Manchester Daniela Bortoletto Associated Production for the Standard Model Higgs at CDF D. Bortoletto Purdue University Outline: Higgs at the.
Introductions and news Zhijun Liang. News Exotics part of the analysis require the EB to be involved in the early stage of the analysis. Time scale for.
TtH(H->bb) searches in ATLAS and CMS Ricardo Gonçalo Collider Cross Talk, 18 October 2012.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012.
News from H->bb Ricardo Gonçalo on behalf of H->bb Note group HSG5 Meeting – 3 Dec
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 16 August 2011.
Photon Physics activities Higgs activities ATLAS LPNHE group meeting, 2011, Nov. 8th.
Viktor Veszpremi Purdue University, CDF Collaboration Tev4LHC Workshop, Oct , Fermilab ZH->vvbb results from CDF.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
QCD estimate with the matrix method Alexander D. with the help of many…
Diphoton+MET: Update on Plans and Progress
Resolved ttbar analysis status
Status of the H4l CSC Note (HG2)
The others’ latest result about SUSY search with same-sign dimuon
Presentation transcript:

Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012

News! News! News! MC plans – from phys. coord. & etc – Expected timeline for finishing mc11 (last week): Expect to finish digi+reco of all priority 0+1 digi+recon around 1st Feb – Includes redoing 50% of the priority 0 samples with PY6 pileup (better ETmiss modelling) Finish simulation+digi+reco of all priority 2 samples around 20th Feb – Could advance this by ~2 weeks if we could reach 40M digi+reco per day By mid February, need to start devoting resources to mc12, >50% from March – Estimate need at least 500M mc12 full simulation events for first collisions – In the meantime: Tuning of grid parameters made production ramp up to 51M events (digi+reco)/day (peak 70M/day) – This is from existing HITS only, and at the cost of some D3PD production – The new default configuration is MC11c : identical to MC11b but uses Pythia6 pileup files Ricardo Goncalob-tagging workshop, Nijmegen - Jan

News! News! News! HSG5 News: – ZH->ννbb: Moved to two meetings/week up to Moriond New e-group : hsg5zh2nunubb hsg5zh2nunubb – Questions from muon contact person (Rosy): Are we using MCP recommendations? Are there any open issues concerning muons? HSG5 MC samples: – Our request of 15M AFII Z->νν+h.f. was accepted in priority 1 – Inclusive Pythia di-boson samples exist: WW, WZ, ZZ – around 20fb -1 – Our list of MC samples is now attached to the D3PD/MC wiki: 3PD#List_of_available_MC_samples 3PD#List_of_available_MC_samples Ricardo Goncalob-tagging workshop, Nijmegen - Jan

Publication Plans From PC/subconveners meeting: – Latest circulation date to ATLAS is 17 th February – Higgs approval to be arranged with Ed.Board In practice: – This means 2 nd February Higgs approval for paper – very little margin – Plan is more clear for WH and ZH->llbb: need good 1 st paper draft – Status is not as good for ννbb yet: work towards including in paper – Boosted VH in a parallel path for now: considering a note for Moriond To gain a few days (if needed): – ZH->ννbb will be submitted as support documentation to be included in paper – This means that we can turn it into CONF note if not in schedule for paper – Now thinking about editors for note Maybe wrong time to mention this but… – Looking into the future, aim to have combined WH analysis for ICHEP including boosted analysis Or before… mention ICHEP to mean up to… – ttH can aim to have published results in same timescale Ricardo Goncalob-tagging workshop, Nijmegen - Jan

MC11a scaling factors New b-tagging scale factors Fresh from the H.F. group: – Preliminary! – pTrel method only for now – May still get updated factors in early February We moved to MV1 – Larger pT dependence now – What do we do with our recipe to apply SFs and estimate uncertainties? Ricardo Goncalob-tagging workshop, Nijmegen - Jan MV1 factors pT [MeV]

Effect of new b-tagging scale factors Ricardo Goncalob-tagging workshop, Nijmegen - Jan Nominal Variation eigenvalue 0 Variation eigenvalue 1 Variation eigenvalue 2 Variation eigenvalue 3 Variation eigenvalue 4

To do list For ZH->ννbb need to decide on: – Use of MET significance cut – pT cut on leading jet – Final analysis binning – QCD estimation method comparison and systematic uncertainty For all inclusive VH channels discuss: – Theory uncertainties – Limit setting and channel combination – Nvtx rescaling in MC11c Today: – Decide on the above – especially ννbb – Focus on inclusive VH analyses since they are urgent – Discuss other issues if we can (apologies if we need to postpone) Ricardo Goncalob-tagging workshop, Nijmegen - Jan

Backup slides Ricardo Goncalob-tagging workshop, Nijmegen - Jan