Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.

Slides:



Advertisements
Similar presentations
Department of Public Works Bureau of Street Services William A. Robertson Director.
Advertisements

City of Houston Street Surface Assessment Vehicle
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
Department of Public Works Bureau of Street Services Cynthia M. Ruiz President Department of Public Works.
Pavement Management Engineer
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Rochester: Action 2020 The Local Context October 17, 2012 GENESEE TRANSPORTATION COUNCIL.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
“Practical Pavement Management with Micro PAVER”
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
LUNENBURG DEPARTMENT OF PUBLIC WORKS Pavement Funding and Maintenance.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
Engineering Services Department of Public Utilities.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
City of Manistee An Asset Management Journey. Manistee Factoids Incorporated in 1869 Population 6,586 $5,000,000 General Fund Budget 4.3 Sq. Miles – 3.2.
HDM-4 Applications. 2 Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards.
Department of Public Works Bureau of Street Services Cynthia M. Ruiz President Department of Public Works.
December 4, National Capital Heavy Construction Association Committee of the Whole 2009 Draft Operating and Capital Budgets Tax Supported Programs.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Why PS 3150? Gordon Sparks, Ph.D.,P.Eng Gordon Sparks, Ph.D.,P.Eng.
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
Paving for Progress Aaron D. Granquist, Project Manager, HR Green, Inc. Doug Wilson, Capital Improvement Project Manager, Cedar Rapids Handouts and presentations.
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
FD05 STATEWIDE RESURFACING PROGRAM OVERVIEW DIANA RADCLIFFE, TEBM, ROADWAY PRESERVATION, DIV OF MAINTENANCE.
Road & Street Maintenance Ballot Measure September 9, 2015 Corey Farkas, Streets Division Manager Travis Easton, Director of Public Works.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
1 Presented to the City Council by Horatio Porter, Budget Officer September 15, 2009 Overview of FY2010 Budget.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
2016 Mill and Overlay Project
Roadway Pavement Management Plan
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Town of Clayton 2016 Pavement Condition Survey
Boulder Junction Town Road Improvement Project
Infrastructure Investment Needs
DRAFT FY Resource Allocation Plan / Two Year Plan
Street Improvement Plan
Pavement Preservation Philosophy utilizing Pavement Management Systems
Presentation transcript:

Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works

PROFESSOR POTHOLE PRESENTS Everything You Always Wanted To Know About Selecting Streets For Resurfacing In Your Neighborhood Council. To Know About Selecting Streets For Resurfacing In Your Neighborhood Council. William A. Robertson, Director Bureau of Street Services

THE STREET SYSTEM

Current Condition Assessment  6,500 miles street system  Approximately 1,000 miles of failed streets  Overall street system condition is a C-

How Did We Get In This Mess? Prior to World War II the City was comprised of approximately 2,500 miles of paved streets and the Annual Resurfacing Program (ARP) consisted of 50 miles. After World War II, and the rapid growth of the San Fernando Valley the street system grew to 6,500 miles. Up until 1986, the ARP still consisted of only 50 miles of resurfacing. From 1987 to the early 1990’s, the ARP was increased to approximately 150 miles. Fiscal Year , the Bureau was funded for its first 200 mile ARP. This year the ARP is funded at 135 miles.

HOW CAN THE NEIGHBORHOOD COUNCILS COLLABORATE TO FIX THIS MESS?

2005 – 2006 ANNUAL RESURFACING PROGRAM WILL BE COMPRISED OF:  Annual  Annual resurfacing program funding, plus  $100,000  $100,000 per Neighborhood Council.

Neighborhood Councils Responsibilities 1.Thoroughly know the street infrastructure of your neighborhoods. 2.Familiarize with the Neighborhood Council Infrastructure Assessment provided by the Bureau of Street Services (BSS). 3.Prioritize your needs as a Neighborhood Council. 4.Select a Public Works liaison / Public Works Committee. 5.Report to the BSS in a timely manner.

Types of Resurfacing Work  Maintenance Overlays –A maintenance overlay is the application, by an asphalt paving machine, of from 1” to 1½” of asphalt wearing surface to a roadway. Once a roadway has deteriorated to the point of having poor riding and drainage qualities the application of a maintenance overlay is required.  Resurfacing –Resurfacing is the placement by an asphalt paving machine of 2” (±) of asphalt wearing surface over a prepared subbase. The roadway may have had up to 25% by surface area involved in base failures.  Reconstruction –Reconstruction is the placement by an asphalt paving machine of 2” (±) of asphalt wearing surface area over a prepared subbase. The roadway may have had from 26% to 100% by surface area involved in base failures.

How Can You Get More For Your Money?  3,300 ft. of Maintenance Overlays, or  2,640 ft. of Resurfacing, or  1,130 ft. of Reconstruction. $100,000 can provide the Neighborhood Council with: Note: A typical residential City block has an average length of 500 ft.

How To Read Your Neighborhood Council Assessments  Proposed  Proposed Resurfacing Projects FY Resurfacing Projects FY  Completed  Completed Resurfacing Projects (Last 5 years)  Resurfacing/Reconstruction  Resurfacing/Reconstruction Assessment Summary

How To Read The Resurfacing Assessments?  2  2 No Base Failure  3  3 1% - 5% Base Failure  4  4 6% - 10% Base Failure  5  5 11% - 15% Base Failure  6  6 16% - 20% Base Failure  7  7 21% - 25% Base Failure  8  8 Reconstruct Note: Smaller number in rank indicates a better condition of the street. RANKDESCRIPTION

How Are Streets Selected?  Street selection for the Annual Resurfacing Program is based on the Bureau’s Pavement Management System: –Defines the existing condition of streets. –Determines the most economical maintenance and rehabilitation strategy. –Predicts future condition of the street network based on different budget scenarios.

Why Don’t We Fix The Worst Streets First? 80/20 Allocation Plan 80% Overlays/Resurfacing 20% Reconstruction Spending more in reconstruction or using a “worst first” strategy would greatly reduce the number of streets resurfaced and cause an acceleration in the decline of the overall condition of the street system.

Pavements need to be managed, not simply maintained. Why Use Pavement Management?

Recommendations 1.Select streets that are contiguous to the other streets selected under the Annual Resurfacing Program (ARP). 2.Minimize the selection of streets that require reconstruction. 3.Provide the Bureau of Street Services with a priority list of resurfacing projects as soon as possible. (All projects need to be “cleared” by the utility companies as mandated by the Street Damage Restoration Fee Ordinance before they can be added to the ARP.)

Click here to Exit