ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to identify any challenging compliance.

Slides:



Advertisements
Similar presentations
Analog-to-Digital Converter (ADC) And
Advertisements

InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
1 HYDROSTATIC TESTING Approved for Public Release.
W89-A-0501 ZPU 08 / 14 / 24 1 High Pressure Pump for Grease Type ZPU 08 / 14 / 24.
Chapter 4 Quality Assurance in Context
1 IST Pump Issues ASME/NRC Meeting June 4, 2007 NRC Offices.
Hydraulic Circuits.
Booster System Basics: Constant Speed Systems
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
World Health Organization
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
CHE 185 – PROCESS CONTROL AND DYNAMICS OPTIMIZATION AND PRIMARY LOOP ELEMENTS.
Classification of Instruments :
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Chapter 10 Verification Procedures. Objective In this module, you will learn: u How to define verification u What functions are part of HACCP plan verification.
Lease Automatic Custody Transfer
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Digital to Analog Converters (DAC) 1
1 ISTOG QUESTIONS – YR Frequency of Class 1 Relief Valves A Nuclear Station has three class 1 safety valves. A Nuclear Station has three class.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Test Organization and Management
VALIDATION METHODOLOGY
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
A SUMMARY OF CDBI FINDINGS IN SERVICE TESTING OWNERS GROUP December 2010 Clearwater, Florida.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4276 Fall 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
ERT 322 SAFETY AND LOSS PREVENTION RISK ASSESSMENT
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
1 Comprehensive Pump Testing Challenges. 2 Purpose This presentation will discuss:  Hardships encountered while implementing comprehensive pump test.
What is your IST Organizational Culture like? by NextEra Energy Seabrook Station LLC Bob Parry, Tim Couture, and Debbie Masters Inservice Test Owner’s.
Hydraulic Circuits.
FPGA-Based System Design: Chapter 6 Copyright  2004 Prentice Hall PTR Topics n Design methodologies.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Team Members: Allen Baragar Dustin Thompson Jose Membreno Katelyn This MECT 4275 Spring 2014 Industrial Advisors: Paul Tyllick- System Interface Supervisor,
Formal Methods in Software Engineering
Calibration PT Honeywell Chapter 7 InstrumentationELC-213Today Presentation by Clifford T. Johnson, PE, Control Systems Engineer Honeywell Primer Auxiliaries.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
ISTOG INDUSTRY ISSUES Interactive Session Gregg Joss (Ginna Station Vice Chair ISTOG) Ron Lippy (True North Consulting ISTOG Facilitator)
Validation Defination Establishing documentary evidence which provides a high degree of assurance that specification process will consistently produce.
CUE – Make Any Pump an E-Pump
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
CENTRIFUGAL PUMPS:- DESIGN & PERFORMANCE Ir. N. Jayaseelan 2012.
Session 6 - Agenda BREAK Activity Est. Time 1. Agenda
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Configuration & Build Management. Why Software Configuration Management ? The problem: Multiple people have to work on software that is changing More.
Part Three – Relay Input Sources
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
PUMPS Thermal Systems Laboratory Samuel A. Santiago Pérez Modesto González David Alvarado.
Chapter 10 Verification Procedures.
Components Pumps.
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Project Management Processes
Professor Robert L. Heider, PE
In-Situ Filter Testing
Chapter 10 Verification Procedures.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Project Management Processes
Presentation transcript:

ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to identify any challenging compliance issues where the NRC is typically approving relief and the problems / alternative methods are similar for multiple plants. It is hoped that this information may trigger effort by ISTOG, NRC or ASME to consider more generic resolutions. The PROCESS was to: Collect Relief Requests from as many plants as possible ( 34 plants responded) Review each Relief Request and develop a short overall RR description for each Tabulate all of the RR descriptions and group in broad categories Refine the categories until final groupings with strong similarities were identifed If anyone sees a RR description which they may want to consider for use at their plant thay can contact me and I will give them the names of individuals to contact at applicable plants.

PUMP RELIEF TOPICNo. of Plants Use of analog gauges where Full Scale > 3x typical reference values Typically the justification is that overall accuracy of the parameter will be better than the Code allowed +/-2%, usually by invoking tighter calibration acceptance criteria or low impact on calculated DP for INLPR gauges. 27 Quarterly testing w/o flow measurement (fixed flow, min flow paths) Typical justification is that the test paths are fixed and that pressure and vibration monitoring is adequate for identifying degradation. 23 Use of vibration with minimum sensitivity >1/3 speed on low RPM pumps Typical justification is that the un-monitored frequency range would not add much value due to lack of corresponding pump or motor discrete frequencies. Also the prohibitive purchase and calibration costs of ultra low range test equipment. 13 ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 2

PUMP RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 3 Various similar instrument-related issues including  Use of tank level changes over time in lieu of flow measurement  Relief from ISTB 3520 requirement for fully venting suction pressure gauges where >0.25% error could be introduced  Various arguments to support use of vibration only, flow only or DP only during IST 10 Use of a reference and acceptance criteria curves vs single points Typically cite guidance in OMN-9 - A reference curve and associated criteria values will be used due to inability to modify flowrate in different configurations 9 Other miscellaneous issues including  Relief to allow Gp. B style quarterly testing even though the pumps are classified as Gp. A  Relief to perform IST at intervals like 6 months, 2years, etc based on risk importance or very high margins to design criteria  Implementation of Risk Informed IST 8

PUMP RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 4 Pumps/motors with high reference vibration - use of higher Alert criteria Typically the system noise level is so high that reference values are near or above the Code Alert limit of ips. Relief is to use a higher value, typically 0.400, as Alert limit. Justification often includes detailed spectrum analysis and independent technical expert reviews. 6 The use of Gp A testing in lieu of performing CPT Typically cites the use of modified Gp. A testing (with tighter instrumentation and/or criteria) or standard Gp. A testing with addition of periodic full spectrum vibration analysis 5 Use of digital instruments with reference values up to 90% of full scale Typically cites implementation of Code Case OMN-6 to allow for exceeding the basic code requirement of reference values being less than 70% of full scale 4

PUMP RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 5 Use of analysis/rebaselining in lieu of mandated Increased Frequency Typically states that in lieu of the doubled frequency test requirements specified in ISTB-6200(a) an evaluation and analysis shall be performed per the guidelines provided in ISTB-6200(c). 4 Quarterly testing of pumps running in pairs Typically justifies performance of quarterly Gp. A testing in paired operation and biennial CPT with individual pumps. 4 Relief to mount vibration transducers in other locations due to housing designs Several plants have motor housings which do not allow for Code required vibration monitoring – equivalent mounting locations are justified 4 Relief to conduct CPT at flow values less than 80% of design Typical justification is that the linearity of the pump curve slope at the lower flow value is the same as at the 80% design flow point. 2

VALVE RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 6 Miscellaneous other relief issues including  Relief from periodic LLRT based on continuous monitoring of downstream temperature / pressure indicators  Allowance for check valve quarterly functional testing in one direction and shutdown/RF frequency for other direction  Relief from 2yr PIT testing requirement where PIT is done using LLRT – allow use of App. J Option B frequency for PIT  Implementation of Code Case OMN-1 or CVCM 37 Relief to allow for testing to be done online versus only RFO Typically involves request to allow for some check valve disassembly/inspections to be performed online during system / component outages rather than only during refueling outages. 12 Use of Disassembly / Inspection during outages vs qtrly functional testing for check valves Typically requests allowance to perform grouped check valve disassembly/inspections in lieu of functional testing for select valves – where overall implementation of CVCM was not desired. 9

VALVE RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 7 Relief to treat a series or parallel pair as one valve Consistent justification involving the lack of intermediate test connections and obligation to consider any failures against both valves – relief being applied to check valve functional testing and/or LLRTs 7 Relief to perform SRV testing differently than the very prescriptive Code language including  Allow stroke testing performance with valve uncoupled  Pilot valve tests conducted on slave main bodies  Relief from I-1330(a) – allow 20% each cycle with all tested every 3 cycles 7 Relief from quarterly functional testing of manual valves Allowance to perform exercise testing once per cycle 7

VALVE RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 8 Relief from standard stroke time testing on control valves Typically relief to perform operational checks and FST but no full stroke time testing because of logic controls, etc 6 Relief on EFCVs to test per TS frequency versus Code POV requirements General relief based on specific Tech Spec testing requirements which apply to Excess Flow Check Valves 5 Relief from Stroke Time testing due to lack of VPI Typically involves SOVs with no remote VPI or means locally to verify actual valve position – relief from stroke timing and PIT with alternatives such as acoustical monitoring or periodic disassembly / inspection. 4

VALVE RELIEF TOPICNo. of Plants ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 9 Stroke time test of a ganged-group of valves Typically involves a group of SOVs operated by a single control switch with group verification based on the slowest valve 4 Relief from accumulator volume measurement for relief valves Relief from the prescriptive language in OM and citing the ASME 95 Code App. I b instead 4 Relief from individual valve test reqts - use of scram time testing per Tech Specs For Scram Inlet / Outlet valves – Code testing requires scram, relief to schedule testing per specific Tech Spec frequency requirements 3

ISTOG RELIEF REQUEST COMMONALITY ASSESSMENT Prepared by: E. Cavey DTE-Fermi 2 Page 10 QUESTIONS ??? IDEAS ???