ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL.

Slides:



Advertisements
Similar presentations
Map & Compass – so easy a caveman can do it!
Advertisements

Adding Gears to the NXT Taskbot
Getting started with LEGO NXT Mindstorms software This is intended to be a short introduction to the LEGO Mindstorms software and programming the LEGO.
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Feature-Based Modeling and Optional Advanced Modeling
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
Here, we’ll show you how to draw a ray diagram for a convex mirror.
1 Aggregate Supply The AS is the part of our national economy model where the production side is studied.
Geometrical Optics Mirrors and Thin Lenses
Tungsten wire & VISAR Goran Skoro 24 October 2008.
General Physics II, Lec 11, Discussion, By/ T.A. Eleyan 1 Review (Electrostatic)
MULTIPLE INTEGRALS Double Integrals over General Regions MULTIPLE INTEGRALS In this section, we will learn: How to use double integrals to.
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Shutter Speed Afzaal Yousaf Baig
SOLIDWORKS: Lesson III – Patterns & Mirrors
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
BG Spider Tutorial. Notes 1. Save A Lot (possibly after each step in case you make any mistakes – THERE IS NO UNDO, and it gets complicated to correct.
LIGHT.
ATLAS Pixel Detector BCM Signal Cable October 5, 2005 E. Anderssen, LBNL.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Creating Constructions Unit 7. Word Splash Constructions Construction – creating shapes using a straight edge and a compass Straight edge – clear,
Physics 218, Lecture VIII1 Physics 218 Lecture 8 Dr. David Toback.
SOLIDWORKS: Lesson II – Revolutions, Fillets, & Chamfers UCF Engineering.
Copyright © 2009 Pearson Education, Inc. Ampère’s Law.
SoLID baffle update Zhiwen Zhao 2013/04/02. Current Baffle The total distance from plane 1 to 6 is 150cm which is a few cm overlapping with endcap nose.
ATLAS Pixel Detector Service Quarter Panel Update And PP1 Work July 4, 2006 Pixel Integration Meeting M Cepeda, S Dardin, K Kennedy, R Post, M Pereira,
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
1 SheetCourse: Engineering Graphics 1504Memorial University of Newfoundland Engi 1504 – Graphics Lecture 5: Sectioning and Dimensioning l Sectioning an.
1.To begin click: File, New, then select Design 2.Draw a circle, then use the dimension tool to set it’s size to 84 diameter or 42 radius. 3. Next draw.
Advanced EM - Master in Physics We have now calculated all the intermediate derivatives which we need for calculating the fields E and B. We.
Sight Word List.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Beam-Beam Background and the Forward Region at a CLIC Detector André Sailer (CERN PH-LCD) LC Physics School, Ambleside 22st August, 2009.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.

Definitions and Symbols © 2008 Mr. Brewer. A flat surface that never ends.
Introduction to Image Processing Our first look at image processing will be through the use of Paint Shop Pro, a bitmap editing program available as shareware.
Chapter 13 Gravitation Newton’s Law of Gravitation Here m 1 and m 2 are the masses of the particles, r is the distance between them, and G is the.
Chapter 4 Pure Bending Pure Bending Engr. Othman A. Tayeh.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
The HESSI Imaging Process. How HESSI Images HESSI will make observations of the X-rays and gamma-rays emitted by solar flares in such a way that pictures.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Chapter 4 Pure Bending Eng. Mahmoud AlQazzaz.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
M. Gilchriese - September 2000 Pixel Insertable Layouts September 2000.
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
Richard, this bullet is the first priority for me. It has a short nose to minimize slumping. I find that as I shorten the nose on bullets I have now, but.
Algebra Tiles How to sort, making the equation smaller and easier: 2x+1x+3 to 3x+3 How to make zero pairs, 1x+-1x=0, then take them away from the equation.
Train Body The next series of slides will guide you through the construction of the train body. Start a new drawing and save it as Train Body.
"Cryptex Style" Maze Coin Puzzle
Thurso High School Design and Technology Tutorial Two Dice.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
Learning Aid: Technical Terms for Describing Drawings
CIVL471 DESIGN OF RC STRUCTURES
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Grid Pix Field Simulations and precision needed for a module
Ampère’s Law Figure Arbitrary path enclosing a current, for Ampère’s law. The path is broken down into segments of equal length Δl.
IFR detector mechanics
Circles in Perspective - Elliptical Shapes
Fusion 360 Pac Man Tutorial
Studio Day In you sketchbooks answer the following questions on the next available page. Are you finished with your sheet metal pendant? What were some.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

ATLAS Pixel Detector BCM Signal Cable October 13, 2005 E. Anderssen, LBNL

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Cable Model Circle next to cable is ghosted power cable—5.5mm diameter—cable since modified to 4.8mm dia (larger than in figure All Bends are planar—some length could be saved with spiral bends Somewhat complicated shape, less than 270degrees worth of 25mm radius bends Cable spec says 12mm is limit for ‘multiple turn bends’ Modeled Both 19-S01 and R01 SMA Straight Pin connector Current length, ref surface to ref surface of SMA is 1430mm as routed

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Complicated Joggle Bend at BCM End 11mm straight section before first 25mm bend for S01—Bend Starts immediately for R01 (see figs later) 12mm bend required to ‘shorten’ radial incursion of SMA Have also modelled all at 25mm Changing other bends to 12mm bends would move connector out radially another 7mm (see next slide for why), but only possible with S01 (marginal with 190 series, was possible with 120 series) Potentially a spiral bend would save similar radial distance and allow larger radii, but too difficult to model effectively 25mm 12mm

ATLAS Pixel Detector October 2005 E. Anderssen LBNL SMA connector wants to extend into box… This is older figure, have since been given model of Box with SMA What I’m trying to show is that assuming reasonable bend limits, this is where the connector ends up—inside the box The box needs to move along the connector axis to actually work with any straight connector (see later slides) As per previous slide, some distance can be taken up with tighter or more complicated bends (hard to model, but maybe possible to test with actual cable) But likely that only gets you half-there Box also needs to move in for other reasons (later slides) 15mm

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Why the complicated curvature bends at BCM Figure shows original cable model (heliax with simple bend) Old cable without joggle, intersected Service panels—joggle is needed to bring cable closer to centerline of BCM/Longeron to clear service panels Power Cable, though larger in diameter than the Signal Cable, is closer to center, and likely does not need joggle I have not modelled the power cable yet The Red ellipse details the cable running thru the edge of our Inner Service Panel

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Another Good Reason to move in Radially… The object in Red is the Service Panel structure (ISP) The Yellow field bounded by the green part is a routing channel for my environmental services While the BCM Box and Mounts do not directly hit anything in my model… –They are a bit too close for my comfort… –The Accuracy we’ve assumed for their mounting is low, so any deviation risks interference Moving them in radially at least 5mm is required, 12-15mm is conservative, and better for the cable –Direction of move is along axis of BCM Box, root 2 of that radially—see later slides To be clear—box needs to move in radially along its axis at least a few mm. 1mm

ATLAS Pixel Detector October 2005 E. Anderssen LBNL S01 connector requires less inward shift of Box 12mm 7mm 25mm all radii bend, requires 5mm more along box axis Only box moved in illustration, clips should follow 12mm all radii bend, requires only 7mm move along box axis Bends are tighter, and maybe too much for Connector 25mm 12.5mm

ATLAS Pixel Detector October 2005 E. Anderssen LBNL R01 connector requires More inward shift of Box 22mm 17mm 25mm all radii bend, requires 5mm more along box axis 12mm all radii bend, requires 17mm move along box axis 25mm 12.5mm RO1 is essentially 10mm longer, and more rigid than SO1, it takes more space, and might require more drastic bends in cable near the connector to actually reach longeron run.

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Change in Radius as function of Connectors Measured innermost corner of box as currently modelled Would propose to move box 12-15mm (boxed dim), making for mm radial box position Nominal Box Position Beam Axis 59.3mm55.0mm48.0mm 7mm 17mm 12.5mm Bend Radius Box Position Nominal Box Position Beam Axis 59.3mm 51.5mm 44.5mm 12mm 22mm 25mm Bend Radius Box Position S01 R01 S01 R01

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Measured Nearest Edge to Nearest Edge Previous slide—this measurement/2 Shown here is R01 Slide just for ref

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Full 22mm incursion (R01 w/25mm bend radii) Would still prefer S01, but it does show that even 22mm in, there is no chance of Hitting Beampipe BP Bellows here is innermost interference, B-Layer is even closer to BP Limits that I don’t understand have to do with electronics radiation resistance IF 22mm is OK (shoot for 25?) then RO1 can be made to work IF not, and SO1 is not an acceptable option, Then must persue R71 option—next slide for ref RO1, to me is potentially too rigid to know if I can successfully route with any less than this

ATLAS Pixel Detector October 2005 E. Anderssen LBNL GORE connectors for G5 cable SO1 is the most svelte, and can start bending 10mm sooner than RO1 If 22mm movement is not good, and SO1 is unacceptable, then need R71 R71 will let a swooping bend with large radii approach the Longeron As per previous slide, still do need to move in a few mm in radius, even with R71

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Just some pictures

ATLAS Pixel Detector October 2005 E. Anderssen LBNL Cable Ghosted in under Longeron

ATLAS Pixel Detector October 2005 E. Anderssen LBNL This too could be a spiral bend It is easier for me to rigorously model jogs and offsets as parallel joggles than spiral bends, here the cables only need to get around objects 4mm wide (center-line shift of only 3.5mm). If I didn’t put in the shift, the models would interfere, but real trajectory is likely just a lazy spiral along the green arrow… Power line will be on other side of aluminum inserts, rejoining the signal cable just before penetrating the orange panel (PP1 Cruciform). This will allow each of them to be relieved together and potted through the penetration. I have not designed the penetration, but will shortly, after I model the power cable.