Don Blackburn Vice Chair

Slides:



Advertisements
Similar presentations
Frequency Responsive Reserve Process Update
Advertisements

BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Frequency Control Turbine Governor Droop NERC Requirement
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
ROS June 12, 2008 Meeting ROS Report for June 26, 2008 TAC Meeting Randy Jones ROS Vice Chair.
RTWG Report to TAC August 5, 2010 Howard Daniels.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Frequency Response Standard. ERCOT Governor Droop.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Final Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG March 26th, 2014.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
Solar Profiling Interstate Renewable Energy Council presentation to the ERCOT Profiling Working Group Jan. 22, 2008.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
2014 & 2015 Unannounced Unit Testing Summary ERCOT ROS February 4 th, 2016.
Update to RMS June 2,  Smart Energy Roadmap Report ◦ Recommendation review led by Doug Lewin of SPEER ◦ Report accessed via
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
Droop Calculator and Unit Performance Evaluation SAR-003-TRE-001 March 31, 2009 Sydney Niemeyer.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Renewable Technology Working Group (RTWG) Report to TAC February 4, 2010 Henry Durrwachter.
Compliance Report to ERCOT BOD December 2006
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
McDonald’s calendar 2007.
Tropical cyclones movement
February 2007 Note: Source:.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

Don Blackburn Vice Chair PDCWG Report to ROS July 10, 2014 Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy

PDCWG Meeting July 1, 2014 Reviewed June frequency control. Improved CPS1 & 2. Frequency Profile continues to be on the high side. Causes were discussed: More small high frequency “events” (small up swings in frequency). Non-conforming load MW change larger on “turn-offs” than “turn-on” would contribute to larger upswings. Must have data to prove. Wind turbines help with high frequency but typically not with low frequency. This keeps high frequency limited to a tighter profile on the high side. Two “Normal” curve profiles were suggested. Fewer Time Error Corrections in June.

PDCWG Meeting BAL-001-TRE Implementation timeline was discussed. ERCOT and TRE will meet to confirm dates. Resources requesting a waiver from the standard as allowed in the standard requested the process for confirming the waiver. RARF additional information needed for conventional steam turbines. A revision request will be written. Protocol and Operating Guide revisions will be needed and are being developed.

PDCWG Meeting Reviewed June 21 frequency event. RRS providers had 5 Resources with below expected performance. Non-RRS providers had 4 Resources with below expected performance. Reviewed June 7 frequency event. RRS providers had 2 Resources with below expected performance. Non-RRS providers had 9 Resources with below expected performance, poor data or inaccurate HSLs.

PDCWG Meeting Reviewed June 23 frequency event. RRS providers had 4 Resources with less than expected performance. Non-RRS providers had 8 Resources with less than expected performance due to either on augmented energy or errors in their HSL. Interconnection Primary Frequency Response was excellent during each event. -694 MW/0.1 Hz, -847 MW/0.1 Hz and -1215 MW/0.1 Hz during the 21st, 7th and 23rd events.

PDCWG Meeting ERCOT will provide the PDCWG an estimate of System Inertia data in each Frequency Disturbance Report prepared for the PDCWG. A request for high speed frequency data on each event was requested.

“New” Future Meeting Dates August 21, 2014 September 10, 2014 October 7, 2014 November 11, 2014 December 2, 2014 All meetings at the Met Center.

ERCOT Frequency Control Report June 2014 Sydney Niemeyer NRG Energy July 1, 2014

Ercot frequency control BAL-001 CPS 1 & 2 Performance, RMS 1 and Frequency Profile Ercot frequency control

CPS1 12 Month Rolling Average = 162.86

60.010 <= HZ < 60.015

ERCOT Time error and time correction Time Error History ERCOT Time error and time correction

Notes Time error values from NRG True Time device can be slightly different from ERCOT’s Time Error but the daily delta times should be accurate.

Time Error Corrections Four slow Time Error Corrections were executed in June. Other than the days with the TECs, 3 days had positive time error.

Time Correction History

Ercot primary frequency response performance BAL-003-1 Interconnection Frequency Response and Bias Measure. Ercot primary frequency response performance

ERCOT Primary Frequency Response – BAL-003-1 2015 Bias and Frequency Response Measure

Ercot total energy and wind production October Total ERCOT Energy and Total Energy Production from Wind Resources. Ercot total energy and wind production