Other Analysis Techniques Chapter 9: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.

Slides:



Advertisements
Similar presentations
Chapter 9 - Benefit-Cost Ratio and Other Analysis Methods Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming.
Advertisements

Incremental Analysis Lecture No. 21 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Chapter Outline 6.1 Why Use Net Present Value?
Net Present Value and Other Investment Rules Chapter 5 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Key Concepts and Skills
Capital Budgeting Decisions
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Other Analysis Techniques
B280F Introduction to Financial Management
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Average.
ENGG 401 X2 Fundamentals of Engineering Management Spring 2008 Chapter 7: Other Analysis Techniques Dave Ludwick Dept. of Mechanical Engineering University.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. NPV, Internal Rate of Return (IRR), and the Profitability Index.
Copyright Oxford University Press 2009 Chapter 8 Choosing the Best Alternative.
Chapter 8 Choosing the Best Alternative
Other Analysis Techniques
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Ch 6 Project Analysis Under Certainty
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Chapter 8 - Incremental Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit Payback period.
IEN255 Chapter 6 - Rate of Return Analysis
Annual Cash Flow Analysis Chapter 6: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
Rate of Return Analysis: Multiple Alternatives Consider the following: You have $20,000 to invest in either alternative A or alternative B. Your MARR is.
Choosing the Best Alternative Chapter 8: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Comparing Projects Using Time Value of Money
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Chapter 6 Investment Decision Rules
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Uncertainty in Future Events Chapter 10: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Principles of Engineering Economic Analysis, 5th edition Chapter 15 Capital Budgeting.
Evaluating a Single Project
Equivalence for Repeated Cash Flows Chapter 4: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
Engineering Economic Analysis Canadian Edition
8-1 Lecture 8: Net Present Value and Other Investment Criteria This lecture presents multiple valuation techniques used during the capital budgeting process.
Rate of Return Analysis Chapter 7: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Chapter 8: Incremental Analysis Engineering Economic Analysis Canadian Edition.
L:21 Incremental Analysis ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer Sciences.
IS NPV IS SUPERIOR TO IRR
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Net Present Value and Other Investment Rules Chapter 5.
Capital Budgeting 2 Dr. Clive Vlieland-Boddy. Investment Appraisal.
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Chapter 6: Comparison and Selection Among Alternatives
Key Concepts and Skills
Chapter Outline 6.1 Why Use Net Present Value?
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Present Worth Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Engineering Economic Analysis
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Other Analysis Techniques Chapter 9: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course

Future Worth Analysis Future worth analysis focuses on examining what will be the value of an investment or costs at some point in the future Knowing the future worth of a project may be useful when you are shooting for a particular goal

Benefit Cost Ratio Analysis This ratio is calculated by taking the present worth of the benefits and dividing it by the present worth of the costs If the benefit cost ratio is greater than or equal to 1, then you would accept the project If you are looking at multiple alternatives, you want to calculate the incremental present worth of the benefits divided by the incremental present worth of the costs If the ratio is greater than or equal to one, you would choose the higher cost alternative

Payback Period The payback period examines the length of time it takes the investment to recoup the costs While this measure is used quite a bit, it does not take into account the time value of money Hence, it is not a very good measure of how good the investment is All economic consequences after the payback period has been met are ignored in this analysis

Sensitivity and Breakeven Analysis This analysis makes the assumption that there are aspects about the investment that are not known with certainty This is a very realistic assumption A sensitivity analysis looks at how sensitive your decision regarding an investment is when attributes about the decision might change E.g., initial costs are not predicted correctly, your timeline on the investment or returns is not correct Breakeven analysis looks at the conditions for alternatives being equivalent

Dealing With Multiple Alternatives for Investment When multiple alternatives exist for investment, it is useful to graph that investment in terms of interest rate and present worth (PW), equivalent uniform annual cost (EUAC), or equivalent uniform annual worth (EUAW) From this you can develop a choice table that tells you which alternative to choose at a particular rate When you dealing with PW and EUAW you choose the highest value, while EUAC would require you to choose the lowest value

Elements in Comparing Mutually Exclusive Alternatives Identify all alternatives Make sure to include the status quo or do nothing option in the analysis Graph PW, EUAC, or EUAW for each alternative on the same axis Examine the envelope (best line) for particular ranges of interest rates where the ranges are found by looking at where alternatives cross each other Calculate the changeover points for when one alternative begins to exceed another alternative You can do this visually or more accurately by calculating the incremental internal rate of return for the two crossing alternatives Create a choice table

Incremental Challenger- Defender Comparisons Alternatives are ranked from lowest cost to highest cost The lowest cost alternative starts out as the first defender Make sure the initial alternative has an IRR greater than MARR Next calculate the incremental internal rate of return between the two lowest cost alternatives that have not been excluded Choose the best alternative based on the rules given in the previous chapter The one that is considered the best becomes the defender for the next pairwise comparison Continue the comparison until no more can be made

Spreadsheet Tools for Examining Multiple Alternatives There are two useful tools in Excel to help you graphically examine multiple alternatives Goal Seek allows you to solve for interest rates that cannot be easily solved for by hand/formula Data Table allows you to run many different alternative interest rates at a single time which will allow you to develop your graphs more quickly especially when your returns are not constant over the life of the investment